• Title/Summary/Keyword: TWBP Markets

Search Result 2, Processing Time 0.016 seconds

A study on generator maintenance schedule coordination of system operator in WBP markets (TWBP 시장에서 계통운용자의 발전설비 예방정비계획 조정 알고리즘에 관한 연구)

  • Han Seok Man;Chung Koo Hyung;Kim Balho H.;Park Jong Bae;Cha Jun Min
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.740-742
    • /
    • 2004
  • In TWBP markets, ISO determines the maintenance schedule based on Gencos' and Transcos' offers under reasonable criterion. This paper presents ISO's alternative procedure to coordinate maintenance schedules submitted by Gencos and Transcos. ISO's coordination procedure is formulated as an optimization problem that minimizes expected losses in Gencos' revenue subject to system reserve requirement.

  • PDF

Coordination of Generator Maintenance Schedule in Two-Way Bidding Pools (TWBP 시장에서 계통운용자의 발전설비 예방정비계획 조정 알고리즘에 관한 연구)

  • Han Seok-Man;Chung Koo-Hyung;Kim Balho H.;Park Jong-Bae;Cha Jun-Min
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.12
    • /
    • pp.685-688
    • /
    • 2004
  • In competitive electricity markets, the System Operator (SO) coordinates the overall maintenance schedules whenever the collective maintenance schedule reported to SO by Gencos in the pool does not satisfy the specified operating criteria, such as system reliability or supply adequacy. The SO's coordination usually involves sorts of financial conflict among Genco's. This paper proposes a coordination algorithm which minimizes the total financial loss of Genco's while satisfying the required operating criteria.