Review of effectiveness at the Construction implementation design VE study by the selected target through CostModeling in the Pre-functional analysis Phase

건설공사 실시설계 VE시 기능분석 이전 단계에서 CostModeling을 통한 핵심 쟁점 사항 도출에 의한 효용성에 관한 고찰

  • Published : 2021.11.12

Abstract

Design VE (Value Engineering) has been basic design and implementation design separately, but due to the recent change in guidelines, it is changing to implement only once in the implementation design stage. However, in the implementation design stage, construction costs, plans, and specifications based on the volume details are almost completed. Therefore, it is effective to perform the function analysis step after identifying information analysis and key issues through CostModeling based on functional center for the selected target in the process of implementing the VE performance procedure.

Keywords