• Title/Summary/Keyword: work-planning method

Search Result 410, Processing Time 0.04 seconds

Process Planning Method under Make-to-Order Production System using Data Mining (데이터마이닝을 이용한 수주생산시스템의 공정계획방안)

  • Oh, Kyung-Mo;Park, Chang-Kwon
    • IE interfaces
    • /
    • v.18 no.2
    • /
    • pp.148-157
    • /
    • 2005
  • The manufacturing industry with Make-to-Order production system is difficult to decide the standard information for the product and the demand is variable to estimate. In this paper, we concerned with the process planning method using data mining in the manufacturing industry with Make-to-Order environment. The subject of our study is the industry transformer plant which is received an diverse order of customer and then produced the product. Currently, process planning method is classified the standard information by hand based on the acquired knowledge through the experience. The standard information stored the various information, such as work sequence, time and so on. This process planning method needs an experts which possesses the field experience for several years. For the product specification which is varied in each order, current process planning method is not efficient due to need many times To solve this problem, we extract the information using data mining process for each processing time, and then construct the knowledge base. We propose a method which is the process planning of the industry transformer product in Make-to-Order environment using the knowledge base.

Path Planning for an Intelligent Robot Using Flow Networks (플로우 네트워크를 이용한 지능형 로봇의 경로계획)

  • Kim, Gook-Hwan;Kim, Hyung;Kim, Byoung-Soo;Lee, Soon-Geul
    • The Journal of Korea Robotics Society
    • /
    • v.6 no.3
    • /
    • pp.255-262
    • /
    • 2011
  • Many intelligent robots have to be given environmental information to perform tasks. In this paper an intelligent robot, that is, a cleaning robot used a sensor fusing method of two sensors: LRF and StarGazer, and then was able to obtain the information. Throughout wall following using laser displacement sensor, LRF, the working area is built during the robot turn one cycle around the area. After the process of wall following, a path planning which is able to execute the work effectively is established using flow network algorithm. This paper describes an algorithm for minimal turning complete coverage path planning for intelligent robots. This algorithm divides the whole working area by cellular decomposition, and then provides the path planning among the cells employing flow networks. It also provides specific path planning inside each cell guaranteeing the minimal turning of the robots. The proposed algorithm is applied to two different working areas, and verified that it is an optimal path planning method.

Production Line Planning for Functional Sports Wear using Simulation Model (시뮬레이션을 이용한 특수 고기능 의류업체의 생산라인 설계에 관한 연구)

  • 최정욱
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.26 no.8
    • /
    • pp.1205-1215
    • /
    • 2002
  • The purpose of this study was to develop a production line using simulation method, which could improve work allocation, labor utility and productivity. Using simulation software AIM, a simulation model of functional sports wear assembly line was developed. A functional sports wear production factory were analysed to gather data necessary for this research. Factory layouts, production facilities, work time of each unit jobs were investigated. The data obtained were used as to build a base simulation model. Then, the base simulation model was verified using the obtained data, such as daily productivity. Using simulation method, low alternative production plans were suggested, which were to enhance productivity, and work efficiency and to reduce queue length and throughput time.

A Study on the Status of Illumination Environment in Workplaces (업무공간의 조명 환경 실태 조사 연구)

  • Choi Han-Hee;Ha Mi-Kyoung
    • Korean Institute of Interior Design Journal
    • /
    • v.13 no.6
    • /
    • pp.167-174
    • /
    • 2004
  • The purpose of this study is to examinethe present illumination conditions in office environment and to suggest an efficient illumination plan in office planning process. Illumination conditions in work environment were surveyed in 6 offices to investigate whether the present illumination conditions were appropriate to the work type. The results of this study are as follows: Most of the general Illuminance level in the area of work were all at an adequate level, except one. The average Illuminance level in the all meeting rooms were met for the standard. Illuminance in the all reception area were extremely over the standard, The illuminations of this area were rather designed according to the image of the company than the standard. As for the illumination method in the area of general work, four offices used a general lighting by a direct lighting type, while two offices used a general lighting and a task lighting at the same time. This survey suggested that first, each company should consider illumination plan in the building planning process, second, illumination plan considering the type of places is needed, and third, illumination environment may be differentiated according to the work type. In conclusion, efficient illumination environment should be considered in office building planning process, especially In terms of illumination materials and methods.

A Simulation Study on a Workload-based Operation Planning Method in Container Terminals

  • Jeong, Yeon-Ho;Kim, Kap-Hwan;Woo, Youn-Ju;Seo, Bo-Hyeon
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.1
    • /
    • pp.103-113
    • /
    • 2012
  • A yard in a container terminal is a temporary storage space before containers are loaded onto the target vessel or delivered to consignees. For improving the utilization of the space in the yard and the efficiency of loading and discharging operations, it is important that operation plans must be carefully constructed in advance. A heuristic method is suggested to solve operation space planning problems considering workloads on handling equipment as well as space availabilities. The operation plans in this paper includes quay crane (QC) schedules and space plans for multiple vessels considering the workload in the container yard of container terminals. This paper evaluates the effectiveness of a space planning method and the performance of a new QC scheduling method using a simulation model.

A Path Planning for Autonomous Excavation Based on Energy Function Minimization (에너지 함수 최적화를 통한 무인 굴삭 계획)

  • Park, Hyong-Ju;Bae, Jang-Ho;Hong, Dae-Hie
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.27 no.1
    • /
    • pp.76-83
    • /
    • 2010
  • There have been many studies regarding development of autonomous excavation system which is helpful in construction sites where repetitive jobs are necessary. Unfortunately, bucket trajectory planning was excluded from the previous studies. Since, the best use of excavator is to dig efficiently; purpose of this research was set to determine an optimized bucket trajectory in order to get best digging performance. Among infinite ways of digging any given path, criterion for either optimal or efficient bucket moves is required to be established. One method is to adopt work know-how from experienced excavator operator; However the work pattern varies from every worker to worker and it is hard to be analyzed. Thus, other than the work pattern taken from experienced operator, we developed an efficiency model to solve this problem. This paper presents a method to derive a bucket trajectory from optimization theory with empirical CLUB soil model. Path is greatly influenced by physical constraints such as geometry, excavator dimension and excavator workspace. By minimizing a energy function under these constraints, an optimal bucket trajectory could be obtained.

A Case Study on Value Improvement through applying VE Method in Stage of Railway Construction (시공 VE기법을 적용한 철도구조물의 가치향상 사례 연구)

  • Cho, Ki-Yon;Park, Mi-Yun;Kim, Sung-Hun;Seo, Jong-Won
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.23-29
    • /
    • 2008
  • Most VE operation related to construction project is progressed in stage of planing or design phase, especially in case of domestic. It is encouraging fact and if you have VE process in stage of planning and design, you'll have experience a reduction of about 70% of total saving cost in which total construction process may occurred. However, recently the work of construction in overseas increase and almost is only construction-work, except planning and design process. As this reason, VE process for construction-work phase only is demanded in high necessity. VE in construction phase comes to accomplish intensively in the part which the design change does not follow, through know-how, equipment operating method and method of temporary-structure erection at the established construction-site learned, builders will be the possibility of reduction from 3% to 10% in constructive expense. This paper describes VE performing example in OO company's construction-work phase, and propose the methodology of VE performance in the phase of construction. And also it is aimed to extending VE applications into the overseas construction enterprise.

  • PDF

Development of Woman Farmers Center Performance Indicators by Using the Analytic Hierarchy Process (AHP를 활용한 여성농업인센터사업 평가지표 개발)

  • Hwang, Dae-Yong;Kang, Kyeong-Ha;Gim, Gyung-Mee;Baek, Min-Hee
    • Journal of Agricultural Extension & Community Development
    • /
    • v.15 no.4
    • /
    • pp.599-619
    • /
    • 2008
  • The study is to develop indicators for woman famers center using focus group meeting and AHP(Analytic Hierarchy Process), which is a method to derive relative weights for each evaluation indicators. The results of this study are as follows. We determined such as the three indicators that planning establishment(seven), promotion process of work(six), performance of work(nine). We analysed the weights of this indicators by AHP. The relative weights of performance of work was 0.5269, planning establishment 0.2554 and promotion process of work marked 0.2177. It was suggested that further research should be carried out to develop more objective assessment indicators.

  • PDF

Development of Production Planning Module for Order-made Production System (주문생산시스템하의 생산계획 모듈 개발에 관한 연구)

  • 정한욱;이희남;이창호
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.22 no.51
    • /
    • pp.221-230
    • /
    • 1999
  • Many enterprises are performing the production planning computerization for survival in unlimited competing period. But it is very difficult to directly apply many production planning softwares to the domain-specific areas of many small enterprises because one enterprise is different from the others with respect to product type, production process, and order fulfillment method. Practically most small enterprises depend on experienced production managers in production planning, so then many problems such as overtime work and cost have been appeared. The purpose of this study is to develop production planning module for order-made production system in order to reduce overtime works and surplus costs. We developed production planning module with RDBMS, which is fit for small manufacturing company. Developing this software, we use Visual Basic 5.0 to provide GUI environment for the production planning module and Microsoft Access 97 is used to construct Database. This production planning module is applied to enhancement of productivity in M manufacturing company located in Asan.

  • PDF

A Relative Importance Evaluation for the Perception of Managers on the Comprehensive Rural Village Development Project using Analytic Hierarchy Process (계층분석과정(AHP)을 활용한 권역단위 종합정비사업 사무장 의식의 상대적 중요도 평가)

  • Jang, Dong-Heon
    • Journal of Korean Society of Rural Planning
    • /
    • v.21 no.1
    • /
    • pp.41-50
    • /
    • 2015
  • In this study, the relative importance for the perception of managers on the comprehensive rural village development projects was evaluated using the AHP method. The fields for evaluation were 4 fields including human relationships, working conditions, work compensation and work burnout. Also, the relative importance for the perception of managers and priority order were analyzed through 15 evaluation items. The analysis result shows that the human relationships among 4 fields were regarded as the most important field, followed by work compensation, working conditions and work burnout. Also, the relationship with the chairperson for the human relationships, continuity of employment for the working conditions, salary for work compensation, and mental stress for work burnout were considered respectively as the most important item. Also, salary among all evaluation items was considered as the most important item for the relative importance, followed by continuity of employment, relationship with village residents and mental stress. However, work load, consulting firms, impersonal treatment and the relations between the administration showed relatively low importance and priority order. It is considered that this analysis result will be used as important preliminary data for establishing the role of manager in the comprehensive rural village development project.