• Title/Summary/Keyword: work-planning method

Search Result 408, Processing Time 0.026 seconds

A Study on the Work-Planning Method of High-rise Building (초고층 건물의 구조체 공사의 작업계획방법에 관한연구)

  • Kim Dae-Gil;Hwang Jae-Hoo;Jung Ho-Geun;Kim Ju-Hwan;Lee Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.129-132
    • /
    • 2006
  • Recently, Society increasingly need the hish-rise building because of urban population concentration. and The hish-rise building need new systematic work-planning method. but it didn't use the construction project's work plan and management. his paper investigated efficient work-planning method. and the work-planning method in using domestic High-rise building's structure work. A investigated result is TACT, DOC LOB etc. and domestic using method is 3day and 4day-Cycle among the Tact. This paper is to compare and analysis two method. a purpose of paper is to analyse application through the case of using the work-planning method. also To find efficient method.

  • PDF

Centralized, Distributed, Hybrid Task Planning Framework for Multi-Robot System in Diverse Communication Status

  • Moon, Jiyoun
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.10 no.3
    • /
    • pp.215-220
    • /
    • 2021
  • As the role of robots expands, flexible task planning methods are attracting attention from various domains. Many task planning frameworks are introduced to efficiently work in a wide range of areas. In order to work well in a broad region with multiple robots, various communication conditions should be controlled by task planning frameworks. However, few methods are proposed. In this paper, we propose mission planning methods according to the communication status of robots. The proposed method was verified through experiments assuming different communication states with a multi-robot system.

On the Generation of Line Balanced Assembly Sequences Based on the Evaluation of Assembly Work Time Using Neural Network (신경회로망기법에 의한 조립작업시간의 추정 및 라인밸런싱을 고려한 조립순서 추론)

  • 신철균;조형석
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.18 no.2
    • /
    • pp.339-350
    • /
    • 1994
  • This paper presents a method for automatic generation of line balanced assembly sequences based on disassemblability and proposes a method of evaluating an assembly work time using neural networks. Since a line balancing problem in flexible assembly system requires a sophisticated planning method, reasoning about line balanced assembly sequences is an important field of concern for planning assembly lay-out. For the efficient inference of line balanced assembly sequences, many works have been reported on how to evaluate an assembly work time at each work station. However, most of them have some limitations in that they use cumbersome user query or approximated assembly work time data without considering assembly conditions. To overcome such criticism, this paper proposes a new approach to mathematically verify assembly conditions based on disassemblability. Based upon the results, we present a method of evaluating assembly work time using neural networks. The proposed method provides an effective means of solving the line balancing problem and gives a design guidance of planning assembly lay-out in flexible assembly application. An example study is given to illustrate the concepts and procedure of the proposed scheme.

A Daily Production Planning Method for Improving the Production Linearity of Semiconductor Fabs (반도체 Fab의 생산선형성 향상을 위한 일간생산계획 방법론)

  • Jeong, Keun-Chae;Park, Moon-Won
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.41 no.3
    • /
    • pp.275-286
    • /
    • 2015
  • In this paper, we propose a practical method for setting up a daily production plan which can operate semiconductor fabrication factories more stably and linearly by determining work in process (WIP) targets and movement targets. We first adjust cycle times of the operations to satisfy the monthly production plan. Second, work in process (WIP) targets are determined to control the production progress of operations: earliness and tardiness. Third, movement targets are determined to reduce cumulated differences between WIP targets and actual WIPs. Finally, the determined movement targets are modified through a simulation model which considers capacities of the equipments and allocations of the WIPs in the fab. The proposed daily production planning method can be easily adapted to the memory semiconductor fabs because the method is very simple and has straightforward logics. Although the proposed method is simple and straightforward, the power of the method is very strong. Results from the shop floor in past few periods showed that the proposed methodology gives a good performance with respect to the productivity, workload balance, and machine utilization. We can expect that the proposed daily production planning method will be used as a useful tool for operating semiconductor fabrication factories more efficiently and effectively.

Automatic Work Time Evaluation Based on a Verification of Disassemblability and Assembly Configuration (분해도 및 조립형상 정보를 이용한 작업시간 산정에 관한 연구)

  • Shin, Chul Kyun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.33 no.3
    • /
    • pp.355-363
    • /
    • 2007
  • This paper presents a method of an automatic work time evaluation based on the verification of a disassemblability and assembly configuration. Even though a work time evaluation is an important field of concern for planning assembly lay-out, there are some limitations using cumbersome user query or approximated work time data without considering assembly condition. To overcome such restriction, this paper presents a method to mathematically verify assembly conditions based on the disassemblability, which is defined by the separability and stability cost. The separability cost represents a facility of the part disassembly operation, and the stability cost which represents a degree of the stability for the base assembly motion. Based upon the results, we propose a new approach of evaluating work time using neural networks. The proposed method provides an effective means of solving the work time evaluation problem and gives a design guidance of planning assembly lay-out in flexible manufacturing application. Example study is given to illustrate the concepts and procedure of the proposed schemes.

A Study on the Combinational Allocation Method using Hand-Drawn Map Overlay Technique in Landscape Planning (조경계획에 있어서 수작도면중첩기법을 적용한 조합적 배분법에 관 한 연구)

  • 김영대
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.20 no.2
    • /
    • pp.119-126
    • /
    • 1992
  • The purpose of this study is to develop the allocation method which could be applied to the transitional stage between analysis and synthesis to select the best alternative in landscape planning process. By using the matrix of alternatives with site-planning elements locational drawing in each, the combinational allocation method can make the process more rational and also more efficient. Hand-drawn map overlay technique accommodates the work I handy way. The method is useful in building conceptual scheme in landscape planning especially when it is applied to small scale project.

  • PDF

A Systematic Approach Of Construction Management Based On Last Planner System And Its Implementation In The Construction Industry

  • Hussain, SM Abdul Mannan;Sekhar, Dr.T.Seshadri;Fatima, Asra
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.11-15
    • /
    • 2015
  • The Last PlannerSystem (LPS) has been implemented on construction projects to increase work flow reliability, a precondition for project performance againstproductivity and progress targets. The LPS encompasses four tiers of planning processes:master scheduling, phase scheduling, lookahead planning, and commitment / weeklywork planning. This research highlights deficiencies in the current implementation of LPS including poor lookahead planning which results in poor linkage between weeklywork plans and the master schedule. This poor linkage undetermines the ability of theweekly work planning process to select for execution tasks that are critical to projectsuccess. As a result, percent plan complete (PPC) becomes a weak indicator of project progress. The purpose of this research is to improve lookahead planning (the bridgebetween weekly work planning and master scheduling), improve PPC, and improve theselection of tasks that are critical to project success by increasing the link betweenShould, Can, Will, and Did (components of the LPS), thereby rendering PPC a betterindicator of project progress. The research employs the case study research method to describe deficiencies inthe current implementation of the LPS and suggest guidelines for a better application ofLPS in general and lookahead planning in particular. It then introduces an analyticalsimulation model to analyze the lookahead planning process. This is done by examining the impact on PPC of increasing two lookahead planning performance metrics: tasksanticipated (TA) and tasks made ready (TMR). Finally, the research investigates theimportance of the lookahead planning functions: identification and removal ofconstraints, task breakdown, and operations design.The research findings confirm the positive impact of improving lookaheadplanning (i.e., TA and TMR) on PPC. It also recognizes the need to perform lookaheadplanning differently for three types of work involving different levels of uncertainty:stable work, medium uncertainty work, and highly emergent work.The research confirms the LPS rules for practice and specifically the need to planin greater detail as time gets closer to performing the work. It highlights the role of LPSas a production system that incorporates deliberate planning (predetermined andoptimized) and situated planning (flexible and adaptive). Finally, the research presents recommendations for production planningimprovements in three areas: process related, (suggesting guidelines for practice),technical, (highlighting issues with current software programs and advocating theinclusion of collaborative planning capability), and organizational improvements(suggesting transitional steps when applying the LPS).

Study on the computer method for power system planning (전력계통계획의 종합기계화에 관한 연구)

  • 송길영
    • 전기의세계
    • /
    • v.27 no.1
    • /
    • pp.49-55
    • /
    • 1978
  • This paper describes a computer method for power system planning. Power system planning was usually studied through individual programs. Because of the laborious work involved in data preparation, the increase of task for power system planning and the time required for the detailed analysis of results, the available time for assessment and decision making has been sacrificed. In order to improve the above situation, the use of data base techniques an the simplified evaluation of the presented programs were newly developed. This program has been used successfully for the routine of power system planning in Korea Electric Company. In addition, this paper describes some results of analysis and evaluation of power system planning in KECO.

  • PDF

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • v.14 no.3
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

An Object-oriented Design Method of Game System for Game Designers (기획자를 위한 객체지향적 게임시스템 기획 방법)

  • Chang, Hee-Dong
    • Journal of Korea Game Society
    • /
    • v.16 no.3
    • /
    • pp.17-26
    • /
    • 2016
  • In the domestic game development field, game system planning is the work that game designers design the gameplay mechanics system to satisfy the game concepts in the perspective of creative design by data structural methods. But the programmers work to design the game system based on the results of the game system planning in the perspective of engineering design by object-oriented methods. This work process is a high risky way for high occurring probability of communication errors between the game designers and programmers, and mismatching errors in their work results. In this study, we propose an object-oriented design method of game system for the game designers in order to resolve this problem. The proposed method is a customized one of GRAPPLE object-oriented SW development guidelines to suit the game system planning. To investigate the effectiveness of the proposed planning method for the game designers, we carried out a survey targeting 10 game system designers working in the domestic game industry. The survey results show that the necessity and effectiveness of the proposed method is "a little over" for almost the game designers.