Process of Formwork Crew Team Formation Based on Work Zoning in Apartment Housing Projects (공구분할기반 공동주택 거푸집공사 작업조 구성 프로세스)

  • Koo, Kyo-Jin;Cho, Dong-Hyun;Lee, Jun-Ho;Park, Sang-Hun;Park, Chan-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.285-286
    • /
    • 2012
  • In the large scale projects, it is difficult to manage every blocks because of the apartment housing project have repetitive shapes and structures. Therefore, it is necessary to divide construction site into work zones and blocks considering site plan, the number of units per each floor, arrangement of blocks, etc. In this study, 20 influencing factors on the grouping of work zones and formwork crew team formation are identified through case study and literature review. Factors are analyzed to determine the degree of influence through experts interviews. A systematic process of crew formation based on work zoning and the considerations by each steps are presented.

  • PDF

On-Site Manpower Increasing Impact on Labor Productivity

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.139-147
    • /
    • 2005
  • During a typical construction project, a contractor nay often find that the time originally available or normally expected to perform its work has been severely reduced. To finish the project by the completion date, the contractor is forced to find a way to speed up the progress of its work to compensate for the reduction in available time. The most frequent initial reaction of contractors to this situation is to increase on-site manpower by working longer time (overtime), adding more workers (overmanning), or implementing shift work (shift work) to increase the rate of progress. The goals of this study were to investigate how these three methods affect labor productivity and to quantify their impact on labor productivity by analyzing real project data collected from sheet metal contractors and mechanical contractors in the US.

Delay Factor Analysis and Process Enhancement System Development Focusing on Masonry Work (조적공사에서의 작업 지연 요소 도출 및 개선 시스템 제안)

  • Park, Min Ha;Lee, Hye Lin;Ko, Yong-Ho;Han, SeungWoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.119-120
    • /
    • 2015
  • Appropriate management of the finish works in construction project is one of most important activities that must be conducted considering the total duration of the project. Masonry work is a fundamental process that is performed in the preliminary steps of finish works. However, it has been investigated that the analysis of delay factors affecting masonry work has been neglected in the domestic construction site. Therefore, this study deducts delay factors affecting masonry work by literature review and survey on site engineers and labors. This study has been conducted as a preliminary step of developing a construction project interference management system which is expected to suggest objective information for the decision making in construction sites.

  • PDF

A Study on Economic Evaluation Method of Steel Erection Work using by Self-supported Steel Joint (자립형 철골 접합부를 이용한 철골설치 방식의 경제성 평가에 관한 연구)

  • Kim, Changki;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.3-7
    • /
    • 2009
  • Construction projects are being the skyscraper and the large size by limited site condition and developing construction technology. Therefore, Steel structure work is steadily increasing caused by easy to work and structural safety. However, steel-frame work has the large incidence of heavy accident potentially. Recently a research group has recently developed newly designed self-supported steel joint for enhancing safety of steel erection work. Before applying the steel joint in a construction site, economic evaluation should be performed. Thus, we proposed the method for measuring economic efficiency of the new steel joint and verified economic feasibility of the steel joint method through a case study. As a result, Steel erection method using by self-supported steel joint showed economic rather than the one using by H-beams.

  • PDF

Improvement Direction on the Assignment of Safety Managers in the Construction Site (건설안전관리자 선임기준의 개선방향 연구)

  • Kim, Ho Min;Woo, In Sung
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.3
    • /
    • pp.73-79
    • /
    • 2015
  • In consideration of current circumstances which management activities for safety performance on construction sites are mostly controlled by safety personnel, it is necessary to maintain qualified safety personnel those who are experienced and have adequate ability. This is a major factor in order to prevent any of work related incident in the construction site. However, the existing standard which enforces certain number of safety personnel in the construction site aligning with respective contract amount could lead to difficulties for proactive safety management. So, it is required to get improvement on the existing standard. In nominating the proper number of safety personnel, it would be more efficient to consider the level of risk for characteristic of work itself and the total number of manpower mobilized in respective construction work, rather than to follow the existing standard of manpower ratio as per the contract amount. Hence, this study aims to propose several plans which enable to improve the existing standard for assignment of safety personnel on construction sites.

A Study on the P.S.M. system for the Construction Safety (건설안전을 위한 P.S.M. 기법에 관한 연구)

  • Lee, Song;Son, Gi-Sang;Choi, Won-Il;Oh, Tae-Sang;Chae, Jum-Sik
    • Journal of the Korean Society of Safety
    • /
    • v.15 no.4
    • /
    • pp.101-111
    • /
    • 2000
  • In order to introduce P.S.M. system adequate to domestic construction first, many cases similar to advanced foreign P.S.M. system have been collected and compared to the domestic situation. Then, the current safety management status of bridges, subways, apartment and office building construction are investigated while visiting interview, using questionnaire at site have being done. The potential hazard and measurement have been investigated for each kind of works, and the domestic introducing method of P.S.M. system is analyzed with expert discussion. In order to represent how to make out P.S.M. plan, the questionnaire is made out using each five place for bridge, subways, apartment and office building. As the weight factor for potential hazard of each work obtained from more than forty site places, is produced and shown. Also, a direction the recommendation is suggested to improve tool in each construction site with work schedule. It is thought that proposed schedule contributed to keeping in safe business administration of each company in decreasing many effort at the construction site.

  • PDF

Preliminary Study for Image-Based Measurement Model in a Construction Site (이미지 기반 건설현장 수치 측정 모델 기초연구)

  • Yoon, Sebeen;Kang, Mingyun;Kim, Chang-Won;Lim, Hyunsu;Yoo, Wi Sung;Kim, Taehoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.287-288
    • /
    • 2023
  • The inspection work at construction sites is one of the important supervisory tasks, which involves verifying that the building is being constructed by the numerical values specified in the design drawings. The conventional measuring method for inspection involves using tools or equipment such as rulers directly by the personnel at the site, and it is usually confirmed by vision. Therefore, this study proposes an model to measure numerical values on images of the construction site. Through the case study to measure the installation interval of jack supports, the proposed algorithm was verified the effiect and validity. The results of this study suggest that it can support inspection work even in the office, which may have been overlooked by on-site inspectors, and contribute to the digitization of inspection work at construction sites.

  • PDF

Analysis and Improvement Plan of Government Support Project for Reducing Disaster in Small Construction Site. (소규모 건설현장의 재해저감을 위한 정부지원 사업 분석 및 개선요구사항 도출)

  • Baek, Nak-Ku;Lee, Mi-Hyeon;Lim, Houng-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.116-117
    • /
    • 2018
  • The government and the Korea Occupational safety & Health Agency have continuously carried out safety activities such as supervision, inspection, technical guidance and financial support in order to reduce safety accidents at the construction site. However, the number of disasters at construction sites is increasing every year. So analyze the results of the supervision and inspection of the Ministry of Employment and Labor, the projects related to the small-scale construction work of the Safety and Health Corporation, and the technical guidance project of the disaster prevention technology guidance organization. It is also necessary to establish an improvement plan for the disaster reduction of the small-scale construction work site for this project.

  • PDF

A Case Study of Caisson Typed Bridge-Foundation Fabrication and Installation in Ul-san Newport Breakwater Project (케이슨식 교량기초 제작 및 거치 시공사례 -울산 신항 방파제현장 시공 사례를 중심으로-)

  • JANG BYUNG-SOO;SIN SUNG-GWEN;KIM DUCK-HO
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2004.11a
    • /
    • pp.45-50
    • /
    • 2004
  • The method of caisson typed bridge-foundation fabrication and installation applied in Ul-san newport breakwater project is throughly carried out to compact QRR mound vibro-hammer step by step to minimize settlement through stability check. Floating Dock was mobilized for caisson fabrication due to limited site area. fabricated caisson on the Floating Dock was towed to the deeper area of 8m water depth to be launched, and Floating Crane assisted launching and installation work of the caisson. finally water filling was done followed by surveying work to permanent installation.

  • PDF

Quantification for Collapsion Probability of Building Structures( I ) (건축구조물 붕괴위험도 정량화에 관한 연구( I ))

  • 손기상
    • Journal of the Korean Society of Safety
    • /
    • v.9 no.1
    • /
    • pp.110-120
    • /
    • 1994
  • The Quantitative analysis for collapsion probability of each construcion work has not been developed, despite of that the one for safety management itself has been reported, up to now. It is concluded that showing critical check points against structure collapsion due to each work at construction site, and Quantifying those could be useful Quality-assuring tool, not to prevent Quality failure. Risk classes of each work at construction site, classified by German Builders Mutual-Aid Association (GEBMAS), and by special instruction rates of Korea Insurance Development Institute, are introduced to compare with the results of this study. As of a study method, total 2,002 sheets of questionwares are distributed directly to new city development areas, which are called, Ilsan 110 points : Pundang 79points and Chungdong 38points, including additional Changwon 125sheets and pusan 60sheets, by four(4) people, for contact with actual site engineers. Total responses of 1,056 sheets, are collected. Interrelationship diagram between experience years of Engrs., and risk rate of responses are also classified, with the criteria of four(4) years. Domestic journals with relation to construction have reported that main building Structure collapsions are mainly shown on apartment buildings and office ones. These two(2) building structures are again classified as five(5) kinds of works. This study takes use of an approach on haying the risk rates for each construction work on the above individual construction work. Additionally, site investigations have been performed to find out any possible unreasonable check items, due to construction method ; Reinforced Concret structure, Pre cast Concrete structure, and Steel structure building. Developed Quality Assurance Analysis Form with the Quantitative danger class, resulted from this study, are verified as it is able to be a good efficiency tool against collapsion of building structures.

  • PDF