• 제목/요약/키워드: work schedule

검색결과 591건 처리시간 0.029초

중일정계획을 고려한 선체 생산설계 작업할당 시뮬레이션 (Job Assignment Simulation of Ship Hull Production Design in Consideration of Mid-Term Schedule)

  • 손명조;김태완
    • 대한조선학회논문집
    • /
    • 제50권5호
    • /
    • pp.334-342
    • /
    • 2013
  • In this paper, we analyze the procedure of the design manager for the enhancement of the hull production design process by use of the simulation method. Normally, design manager assigns design jobs according to various methods and estimates the corresponding results. When the construction drawing which is the output of the detail design where a design is dealt by zones, the design manager identifies blocks and analyzes their work difficulties, and assigns jobs to design engineers who are different in capabilities. These processes including the design engineer who can be modeled with man-hours evaluation model are represented in detail as a simulation model. As the high-level modeling for the discrete-event system, we use Event Graph model. And we implemented the simulation using Simkit which is open simulation engine for the discrete-event system. We made the simulation scenario to be written by a user in the scenario generator which is separated from the simulation model, and made the simulation result to be visualized in the form of Gantt chart in a Web. In the scenario of the irregular issuance for various construction drawings which contain different numbers of blocks, we performed the Monte-Carlo simulation according to various assignment methods to find the assignment result that satisfies the mid-term schedule.

디스패칭 룰 기반의 Advanced Planning and Scheduling (APS) 시스템 활용 사례연구 (A Case Study on Application of Dispatching Rule-Based Advanced Planning and Scheduling (APS) System)

  • 이재용;신문수
    • 산업경영시스템학회지
    • /
    • 제38권3호
    • /
    • pp.78-86
    • /
    • 2015
  • Up-to-date business environment for manufacturers is very complex and rapidly changing. In other words, companies are facing a variety of changes, such as diversifying customer requirements, shortening product life cycles, and switching to small quantity batch production. In this situation, the companies are introducing the concept of JIT (just-in-time) to solve the problem of on-time production and on-time delivery for survival. Though many companies have introduced ERP (enterprise resource planning) systems and MRP (material requirement planning) systems, the performance of these systems seems to fall short of expectations. In this paper, the case study on introducing an APS (advanced planning and scheduling) system based on dispatching rules to a machining company and on finding a method to establish an efficient production schedule is presented. The case company has trouble creating an effective production plan and schedule, even though it is equipped with an MRP-based ERP system. The APS system is applied to CNC (computer numerical control) machines, which are key machines of the case company. The overall progress of this research is as follows. First, we collect and analyze the master data on individual products and processes of the case company in order to build a production scheduling model. Second, we perform a pre-allocation simulation based on dispatching rules in order to calculate the priority of each order. Third, we perform a set of production simulations applying the priority value in order to evaluate production lead time and tardiness of pre-defined dispatching rules. Finally, we select the optimal dispatching rule suitable for work situation of the case company. As a result, an improved production schedule leads to an increase in production and reduced production lead time.

모바일 기기를 활용한 조선 생산 실행계획 지원 시스템 개발 : 판넬라인 개발 사례를 중심으로 (Development of Shipbuilding Execution Scheduling Support System using Mobile Device : A Case Study for a Panel Block Assembly Shop)

  • 황인혁;송정규;백명기;류철호;이광국;신종계
    • 대한조선학회논문집
    • /
    • 제50권4호
    • /
    • pp.262-271
    • /
    • 2013
  • Owing to the development of mobile communication technology during the last a few years, the number of users of mobile devices such as the smartphone and the tablet PC has increased rapidly. As a result, the range of applications of the mobile devices has also been greatly expanded from an application for the convenience of daily life to an application for assisting the operations of industrial fields. Especially, portability of mobile devices can provide great help in collecting and using information on the production site. In shipbuilding production processes, it is difficult to collect changes of circumstance in the field and reflect the changes to schedule due to the low production automation rate and frequent changes in schedule. In this study, we propose a system to solve the problems of shipbuilding production processes such as the ones described above by using mobile devices. First of all, we organize the production information and production processes of the panel line through the analysis of shipyard panel line operations. Next, we have developed a system that can support the production execution plan of the panel line and monitor the production processes in the field. The system was developed utilizing application virtualization to allow access to the system from various platforms of mobile devices and PC's. The system was implemented using ooCBD methodology considering the future expansion of the system and ease of maintenance.

사이드 펄링과 최적 토크스케줄을 고려한 소형 풍력터빈 해석 프로그램 개발 (Development of an Analysis Program for Small Horizontal Wind Turbines Considering Side Furling and Optimal Torque Scheduling)

  • 장현무;김동명;백인수
    • 한국태양에너지학회 논문집
    • /
    • 제38권2호
    • /
    • pp.15-31
    • /
    • 2018
  • A program to design a small capacity wind turbine blade is proposed in this study. The program is based on a matlab GUI environment and designed to perform blade design based on the blade element momentum theory. The program is different from other simulation tools available in a point that it can analyze the side-furling power regulation mechanism and also has an algorithm to find out optimal torque schedule above the rated wind speed region. The side-furling power regulation is used for small-capacity horizontal axis wind turbines because they cannot use active pitch control due to high cost which is commonly used for large-capacity wind turbine. Also, the torque schedule above the rated wind speed region should be different from that of the large capacity wind turbines because active pitching is not used. The program developed in this study was validated with the results with FAST which is the only program that can analyze the performance of side-furled wind turbines. For the validation a commercial 10 kW wind turbine data which is available in the literature was used. From the validation, it was found that the performance prediction from the proposed simple program is close to those from FAST. It was also found that the optimal torque scheduling from the proposed program was found to increase the turbine power substantially. Further experimental validation will be performed as a future work.

원격진료 보수지불체계 설정방향에 관한 연구 (Development of a Payment System for Telemedicine)

  • 염용권;명희봉;이윤태;김동욱;서원식;이관익
    • 보건행정학회지
    • /
    • 제7권2호
    • /
    • pp.65-88
    • /
    • 1997
  • In Korea, telemedicine is still under the beginning stage, but we expect that the developing 'Information Highway' will make this technology more common place and more easily used in coming soon. Currently, three hospitals are providing telemedicine services with their subsidiary hospitals which are far away from their remote place. However, the fee schedule of telemedicine services are not well-settled down, of course not reimbursed through current health insurance system. This study aims to develop new payment system for medical services provided through telemedicaine system. To design appropriate fee schedule for telemedicine services, we, first, review the current insurance payment system and telemedicine system both in domestic and foreign countries focusing on its payment system. A framework of telemedicine payment system is proposed in following steps based on information we acquired from this stage. Second. We decide the span of cost items which should be covered by telemedicine payment scheme. In hear, we suggest payment method for telemedicine services should be designed as dual structure which are telemedicine fee that should be reimbursed through payment scheme and any costs related to capital investment that should not be covered by payment system. Which is, payment system for telemedicine services should cover only service-related costs and any costs related to capital investment should be generated through third party such as government, health insurance association, etc. Finally, we suggest new fee schedules for telemedicine services. The key issues on developing telemedicine fee schedules are related with the determination of appropriate additional rate($\alpha$). The reasonable additional rate($\alpha$) must determine through careful evaluation of any additional efforts(e. g. : additional work hours which are related to providing telemedicine services). This study shows the process of how to determine appropriate additional rate($\alpha$).

  • PDF

무엇이 정보시스템 프로젝트 일정을 지연시키는가? (What Factors Make the Delay of the Information System Project Implementation?)

  • 성병욱;박상철;고준
    • 지식경영연구
    • /
    • 제22권1호
    • /
    • pp.1-19
    • /
    • 2021
  • 대규모 병원정보시스템 프로젝트가 계획 대비 지연되는 경우가 종종 발생하고 있다. 따라서 프로젝트 관리 측면에서 일정 지연을 촉발하는 원인을 검토하고 지연 유발 요인들 간 인과관계 분석이 필요하다. 본 연구는 근거이론 방법론을 활용하여 병원정보시스템 개발 프로젝트 사례에 대한 일정 지연 요인을 발견하고 이들 간의 인과관계를 파악하고자 한다. 연구 결과, '비현실적 일정 수립'은 도미노 현상과 같이 전반적인 일정 지연에 영향을 미치고, '기존 시스템 분석 미흡'은 분석 품질의 저하를 야기하는 반면 '서브시스템 통합 인터페이스 부실'은 설계 품질의 저하로 이어졌다. 본 연구는 학술적인 측면에서 프로젝트 지연에 영향을 미치는 요인을 찾아내고 지연 요인들 간의 인과 관계를 분석하였으며, 실무적 관점에서는 System Integration (SI) 기업, 병원, 프로젝트 관리자 입장에서 프로젝트 일정 지연을 최소화할 수 있는 방안을 제시한 점에 의의가 있다.

건설공사 공기지연 영향분석을 통한 책임일수 산정체계 구축방안 (Estimating System for Responsible Days of Schedule Delay for Construction Projects through Time Impact Analysis)

  • 강인석;권중희
    • 대한토목학회논문집
    • /
    • 제28권5D호
    • /
    • pp.685-694
    • /
    • 2008
  • 최근의 건설공사는 복잡한 공정으로 이루어진 대형공사가 점차 증가되고 있다. 이에 따라 클레임 발생 빈도가 증가하고 있으며 이 중에서 공기지연을 사유로 한 클레임은 가장 많은 비중을 차지하고 있다. 이를 해결하기 위하여 공기지연사유를 분석하여 책임일수를 산정하는 기법들이 국내외에서 다양하게 연구되고 있으며, 복잡한 지연 분석과정을 자동화하여 책임일수 산정결과를 손쉽게 도출할 수 있는 시스템 개발도 요구되고 있다. 본 연구에서는 신뢰성이 있는 시간경과에 따른 분석방법을 기반으로 결과론적 분석방법과 단축일수를 고려한 방법론을 도출하였다. 이를 바탕으로 책임일수 산정 시스템을 구축하고 사례 데이터를 적용하여 실제 분석정보와 비교함으로써 활용성을 검증하였다.

A Quasi-optimal Restaurant Work Scheduling Based-on Genetic Algorithm with Fuzzy Logic

  • Watanabe, Makoto;Nobuhara, Hajime;Kawamoto, Kazuhiko;Yoshida, Shin-ichi;Hirota, Kaoru
    • 한국지능시스템학회:학술대회논문집
    • /
    • 한국퍼지및지능시스템학회 2003년도 ISIS 2003
    • /
    • pp.517-520
    • /
    • 2003
  • A quasi-optimization algorithm for generating a chain restaurant work scheduling (WS) is proposed based on Genetic Algorithm with fuzzy logic, where the whole weekly chain restaurant WS problem is decomposed to 7 daily WS problems and a combined weekly WS problem. Experimental result shows that a weekly schedule for 15 workers and 24 hours in a chain restaurant is produced in 6 minutes using the proposed algorithm implemented with C++ and executed on a PC(Athlon XP 1900+), where the quality of WS is satisfactorily evaluated by professional experts.

  • PDF

Distributed Multimedia Scheduling in the Cloud

  • Zheng, Mengting;Wang, Wei
    • Journal of Multimedia Information System
    • /
    • 제2권1호
    • /
    • pp.143-152
    • /
    • 2015
  • Multimedia services in the cloud have become a popular trend in the big data environment. However, how to efficiently schedule a large number of multimedia services in the cloud is still an open and challengeable problem. Current cloud-based scheduling algorithms exist the following problems: 1) the content of the multimedia is ignored, and 2) the cloud platform is a known parameter, which makes current solutions are difficult to utilize practically. To resolve the above issues completely, in this work, we propose a novel distributed multimedia scheduling to satisfy the objectives: 1) Develop a general cloud-based multimedia scheduling model which is able to apply to different multimedia applications and service platforms; 2) Design a distributed scheduling algorithm in which each user makes a decision based on its local information without knowing the others' information; 3) The computational complexity of the proposed scheduling algorithm is low and it is asymptotically optimal in any case. Numerous simulations have demonstrated that the proposed scheduling can work well in all the cloud service environments.

쪼그려 앉은 작업자세에서의 작업부하 평가 (Workload evaluation of squat sitting postures)

  • 이인석;정민근
    • 대한인간공학회:학술대회논문집
    • /
    • 대한인간공학회 1997년도 춘계학술대회논문집
    • /
    • pp.90-94
    • /
    • 1997
  • Many workers like welders are working in squat sitting postures with te object on the ground for an entire work shift. It is suspected that such prolonged squat sitting without any supporting stool would gradually cause musculoskeletal injuries to workers. This study is to quantitatively evaluate the physical stress caused by the prolonged squat sitting and to recommend a safe work/rest schedule for the task with squat sitting posture based on the lab experiment. In this study, 8 healthy student subjects participated in the experiment. They maintained a squat sitting posture for 16 minutes with 4 different stool height conditions: no stool, 10cm hight, 15cm height, 20cm height. Every 2 minutes, the discomfort was subjectively assessed using the magnitude estimation method for the whole body, lower back, upper leg and lower leg. Based on discomfort rating, we found that 10cm height stool relieved the workload most. Discomfort rating results also indicated that 20cm height stool showed the heghest workload, and that there was no difference in workload between 15cm height and no stool. We recommend to provide the workers with 10cm height stool for prolonged squat sitting tasks.

  • PDF