• 제목/요약/키워드: work schedule

검색결과 591건 처리시간 0.029초

Measuring productivity improvement by Machine Guidance through work sampling in earthwork

  • Eom, Julee;Kang, Youngcheol;Lee, Yongsei;Choi, Pyungho
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.409-416
    • /
    • 2020
  • This paper proposes a study measuring productivity improvement by using a type of technology called "Machine Guidance" through work sampling in earthwork. Earthwork is the activity typically on the critical path, indicating that productivity for the activity is critical for managing schedule on time. Thanks to the development of sensing and information system technologies, productivity for earthwork has been improved. While there have been many studies investigating the application of a certain type of technology to earthwork, few studies have measured the productivity improvement and presented how the technology leads to productivity improvement. Based on the thorough literature review, it is hypothesized that Machine Guidance contributes to improving productivity of earthwork by reducing indirect workhours spent for information waiting and inspection. In addition to the literature review, this paper presents a research model to test the hypothesis by using the work sampling technique. By proving and quantifying the productivity improvement from the technology use, this study can help practitioners justify the investment for technology use, which will contribute to the deployment of technology and more effective execution of earthwork.

  • PDF

자동차공장 교대작업 근로자들의 건강상태평가 (Health Assessment of Shift Workers in a Automobile Manufacturing Plant)

  • 이중정;정종학
    • Journal of Preventive Medicine and Public Health
    • /
    • 제28권1호
    • /
    • pp.103-121
    • /
    • 1995
  • 교대작업이 근로자의 육체적, 정신적 및 사회적 건강에 미치는 영향을 조사하고자 1993년 5월 한 달간 경상남도 울산시 소재 모 자동차 공장 생산직 근로자 659명(교대작업자 : 544, 주간작업자 : 115)을 대상으로 설문조사 및 면접조사를 실시하였다. 조사시점에서 현재 교대작업을 하고 있으며 자신의 근무기간 중 80% 이상을 교대작업에 참여한 근로자를 지속적인 교대작업자로 간주하였으며, 조사 당시 교대작업에 참여하고 있지 않고 과거에도 교대 작업에 참여한 경험이 전혀 없었던 근로자룰 주간작업자로 하였다. 교대작업군과 대조군의 일반적인 특성 및 작업과 관련된 특성은 자기기입식 설문지를 이용하여 조사하였으며, 교대작업에 관련된 내용은 면접을 통한 자기기입식 설문지를 이용하여 조사하였다. 근로자의 수면양상과 식사형태에 관한 설문은 National Institute for Occupational Safety and Health에서 개발된 항목을 이용하여 조사하였으며, 위장관계질환의 자각증상에 관하여서도 자기기입식 설문지를 이용하여 조사하였다. 근로자의 일반적인 안녕 상태와 장해는 미국의 Health and Nutrition Examination Survey에서 개발된 자기기입식 설문인 General Well-Being Schedule(GWB)에 의해 측정되었다. 교대작업자에서 자신이 원하는 수면시간보다 1시간 이상 수면이 모자란다고 호소한 근로자가 56.8%로 주간작업군의 50.0%보다 높았으며, 수면 중 2회 이상 잠을 깨는 근로자의 비율, 잠에서 깨었다 다시 잠들기가 힘들다고 호소한 근로자의 비율, 일주일에 2일 이상 작업 중 피곤하거나 졸리다고 호소한 근로자의 비율, 일주일에 2일 이상 작업이 끝난 후에도 피곤하거나 졸리다고 호소한 근로자의 비율은 주간 작업자보다 교대작업자에서 현저하게 높았으며(p<0.01), 교대작업자에서 자고 일어난 후에도 피로감을 호소하는 율도 교대작업군에서 53.1%로 주간작업자의 40.0%보다 높았다(p<0.05). 수면의 형태를 보면 교대작업자에서는 각 교대작업 때마다 다른 형태의 수면을 취하는 근로자가 35.9%로 가장 많은 비율을 차지하였으며, 잠을 잘 못 잔다고 호소하는 근로자도 12.3%로 주간작업자의 6.1%보다 훨씬 많은 비율을 차지하였다. 잠을 자기 위해 약물을 상습적으로 복용하는 근로자도 주간작업자에서 1.7%, 교대작업자에서 2.8%를 차지하였다. 교대작업자들과 주간작업자는 다른 형태의 식사형태를 보였으나 유의한 차이는 없었으며, 식욕은 주간작업자의 13.0%에서 아주 좋다라고 응답한 반면 교대작업자에서는 6.6%만이 식욕이 아주 좋다라고 응답하였으며, 식욕이 매우 나쁘다라고 응답한 비율도 5.0%로 주간작업자의 2.5%보다 높았다. 교대작업자와 주간작업자의 위장관계 자각증상 호소율은 교대작업군에서 높았으며(p<0.01), 배변습관의 변화와 체중감소 호소율도 교대작업자에서 주간작업자에 비해 유의하게 높았다(p<0.05). 근로자의 일반적인 안녕 상태와 장해는 HANES I에서 개발된 General Well-Being Schedule(GWB)에 의해 측정되었는데 불안척도, 우울척도, positive well-being척도, 활력척도에서는 교대작업군에서 통계적으로 유의하게 낮았으며(p<0.05). 자기제어력척도, 일반건강척도도 교대 작업자에서 낮았으나 유의한 수준은 아니었다. 이상의 결과를 종합해 볼 때, 교대작업자에서 생체리듬의 부조화로 인한 수면, 식사, 위장관계장해 등의 일련의 자각증상에 대한 호소율이 주간작업자에 비해 전반적으로 높았으며, 일반적인 건강 장해 호소율도 교대작업자에서 높았다.

  • PDF

CMMI기반의 XP를 위한 3단계 EVM 적용 지침 개발 (Development of 3 layer EVM(Earned Value Management) Guideline for XP(eXtreme programming) based on CMMI)

  • 정미서;한혁수
    • 인터넷정보학회논문지
    • /
    • 제9권6호
    • /
    • pp.155-163
    • /
    • 2008
  • 소프트웨어 프로젝트가 착수 후 성공적으로 종료되기 위해서는, 계획에 따라 프로젝트가 잘 진행이 되고 있는지의 여부를 주기적으로 검토하고 만약 문제가 있을 경우에는 적절한 시정 조치를 취하는 프로젝트 통제활동이 필수적이다. 프로젝트 통제활동은 주간회의나 마일스톤 회의 등과 같이 주기적으로 수행되는 보고회의를 통해 이루어지는데, 이때 프로젝트 관리자는 일정, 비용, 작업성과 등을 검토해 봄으로써 프로젝트의 진행 상태를 파악할 수 있다. 프로젝트 통제활동을 지원하는 방법으로 가장 많이 쓰이고 있는 EVM(Earned Value Management)은 일정과 작업성과에 관한 측정치를 비용으로 산정하여, 일정, 비용, 작업성과를 하나의 그래프에 표현하는 방법이다. 프로젝트 관리자는 EVM을 통하여 비용이라는 하나의 단위로 프로젝트의 작업 성취도와 진도율을 정량적으로 관리 할 수 있다. EVM은 전체작업을 단위작업으로 나누어 각 단위작업의 작업 기간과 작업량을 비용으로 환산하여 관리하는데, 주로 프로젝트의 범위가 초반에 정의되고 단위작업의 크기가 큰 경우에 적용이 쉽고 관리가 편하다. 이러한 이유로 폭포수(Waterfall) 기반의 프로젝트에 주로 적용되고 있다. 그러나 XP(eXtreme Programming)기반의 프로젝트에서는 요구사항이 프로젝트 초반에 완벽히 정의되기가 어렵고 단위작업의 크기가 작아, 프로젝트 초반에는 상위레벨 수준으로만 범위가 정의 되고 반복이 진행되면서 점점 상세한 범위가 정의되기 때문에 EVM이 활용되고 있지 않다. 따라서 본 논문에서는 XP에 EVM을 적용할 수 있는 방안인 3단계(Layer) EVM을 제시하고, 조직이 이를 구축하도록 지원하기 위해 CMMI(Capability Maturity Model Integration)의 PMC(Project Monitoring and Control) 프로세스 영역을 기반으로 프로세스를 정립하고, 그에 따른 적용 지침을 개발하였다.

  • PDF

근로시간 및 교대근무편성의 문제점과 개선방향 (Problems of Working Hours and Shift Work Systems, and Propsed Methods for Their Improvement)

  • 서유진;;박영만;문세근
    • 대한인간공학회지
    • /
    • 제22권3호
    • /
    • pp.13-26
    • /
    • 2003
  • The purpose of this study is to investigate the present conditions of the night work and shift work systems in the heavy chemical industrial complexes found in Changwon, Masan, and Chinhae. Korea. We will attempt to define and classify their problems; and to discover further ways to improve their systems. Fifty production factories were carefully selected as the subjects for this study. The shift systems were classified into five categories. The consecutive night shifts were long in almost all cases with 6 days (36 factories) and 7 days (13 factories). It was found that the night work of about] 2 hours continues for a long period in the weekly rotation full-day shift systems and the night-including non-full-day shift systems, and there was no holiday during a shift cycle in the continuous full-day shift systems. The work time in most shift systems was longer than the 44-hours/week permitted by Korean law. Considering the characteristics of these various types of shift systems, the most essential thing to reduce the shift workers' work load may be to shorten their working hours and improve the schedule of shift systems. It is highly recommended as a fundamental solution. to reduce the portal-to-portal hours from 12 to 8 in the night-including non-full-day shift systems and the weekly rotation full-day shift systems, and at least to employ a 4-team 3-shift system in the continuous full-day shift systems. In addition to this, it should from now on be taken as a goal to restructure the types of shift systems by taking such measures as avoiding continuous night work if possible, providing sufficient off-duty intervals both before and after night shift, providing increased opportunities for workers to nap during night work. and increasing the number of holidays.

Stacking Ensemble Learning을 활용한 블록 탑재 시수 예측 (A Study on the Work-time Estimation for Block Erections Using Stacking Ensemble Learning)

  • 권혁천;유원선
    • 대한조선학회논문집
    • /
    • 제56권6호
    • /
    • pp.488-496
    • /
    • 2019
  • The estimation of block erection work time at a dock is one of the important factors when establishing or managing the total shipbuilding schedule. In order to predict the work time, it is a natural approach that the existing block erection data would be used to solve the problem. Generally the work time per unit is the product of coefficient value, quantity, and product value. Previously, the work time per unit is determined statistically by unit load data. However, we estimate the work time per unit through work time coefficient value from series ships using machine learning. In machine learning, the outcome depends mainly on how the training data is organized. Therefore, in this study, we use 'Feature Engineering' to determine which one should be used as features, and to check their influence on the result. In order to get the coefficient value of each block, we try to solve this problem through the Ensemble learning methods which is actively used nowadays. Among the many techniques of Ensemble learning, the final model is constructed by Stacking Ensemble techniques, consisting of the existing Ensemble models (Decision Tree, Random Forest, Gradient Boost, Square Loss Gradient Boost, XG Boost), and the accuracy is maximized by selecting three candidates among all models. Finally, the results of this study are verified by the predicted total work time for one ship among the same series.

Prostate cancer in workers exposed to night-shift work: two cases recognized by the Korean Epidemiologic Investigation Evaluation Committee

  • Sungkyun Park;Seongwon Ma;Hoekyeong Seo;Sang Gil Lee;Jihye Lee;Shinhee Ye
    • Annals of Occupational and Environmental Medicine
    • /
    • 제35권
    • /
    • pp.52.1-52.13
    • /
    • 2023
  • Background: In 2019, the International Agency for Research on Cancer re-evaluated the carcinogenicity of night-shift work and reported that there is limited evidence that night-shift work is carcinogenic for the development of prostate cancer. Therefore, in 2020 and 2021, the Korean Epidemiologic Investigation Evaluation Committee concluded that 2 cases of prostate cancer were occupational diseases related to the night-shift work. Here, we report the 2 cases of prostate cancer in night-shift workers which were first concluded as occupational diseases by the Korean Epidemiologic Investigation Evaluation Committee. Case presentation: Patient A: A 61-year-old man worked as a city bus driver for approximately 17 years, from 2002 to 2019, and was exposed to night-shift work during this period. In March 2017, the patient was diagnosed with high-grade prostate cancer through core-needle biopsy after experiencing stinging pain lasting for 2 months. Patient B: A 56-year-old man worked as an electrician and an automated equipment operator in a cement manufacturing plant for 35 years from 1976 to 2013 and was exposed to night-shift work during this period. In 2013, the patient was diagnosed with high-grade prostate cancer through core needle biopsy at a university hospital because of dysuria that lasted for 6 months. Conclusions: The 2 workers were diagnosed with high-grade prostate cancer after working night shifts for 17 and 35 years respectively. Additionally, previous studies have reported that high-grade prostate cancer has a stronger relationship with night-shift work than low or medium-grade prostate cancer. Therefore, the Korean Epidemiologic Investigation Evaluation Committee concluded that night-shift work in these 2 patients contributed to the development of their prostate cancer.

냉간 압연 공정에 의한 두께 $36{\mu}m$ 동극박 제조 공정 해석 (Fabrication of copper thin foils with 36 microns by cold rolling)

  • 이상호;김병민
    • 한국소성가공학회:학술대회논문집
    • /
    • 한국소성가공학회 2007년도 춘계학술대회 논문집
    • /
    • pp.413-416
    • /
    • 2007
  • In general, by means of the electrodepositing technique, a copper foil sample was prepared with a high purity and a high density. But the mechanical properties of the electrodepositing copper foil was lower than it's the rolling copper foil. However, the production of copper foil with approximately 36 microns thick in rolling process was very difficult. This paper describes the outline of the high accuracy cold rolling in 6 high mill which was developed for the purpose of rolling very thin accurate gauge copper foil(36 micron thick), and give several rolling characteristic of 600 mm wide copper foil. a) Large strain can be accumulated pass by pass in industrial multi-pass rolling processing to overcome large critical strain for thickness accuracy through optimization of rolling schedule. b) Also, permissible tension for rolling 0.45 $\sim$ 0.036 mm thick copper strip stably in accordance with the each pass work had been established by FEM simulation results. c) During the plate rolling process, considerable values of the forces of material pressure on the tool occur. These pressures cause the elastic deformation of the roll, thus changing the shape of the deformation region. A numerical simulation of roll deflection during cold rolling is presented in the paper. d) The proposed pass schedule can roll very thin copper foil of 36 micron thickness to a tolerance of ${\pm}1$ microns. The validity of simulated results was verified into rolling experiments on the copper foil.

  • PDF

EV기반 RC 공사 진도율산정 개선방안 (A Study on the Improvement of Construction Progress Measurement Based on Earned Value Concept)

  • 최태영;정혜원;구교진;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.307-310
    • /
    • 2003
  • 건설프로젝트는 불확실한 요소들로 인해 많은 위험을 가지고 있다. 그래서 프로젝트의 다양한 측면에서 현장 수행사항을 계속해서 측정관리하는 것이 매우 중요하다. 그러나 건설공사는 주로 결과에 초점을 맞춰 수행되어지며 게다가 비용과 일정은 통합 관리되었을 때의 효율성이 뛰어남에도 서로 분리되어 관리되고 있다. 최근 EVMS(Earned Value Management System)에 대한 관심 때문에 많은 연구들이 발표되고 있지만 실제 건설현장에 적용할 수 있는 예를 찾기가 쉽지 않다. 이 논문의 목적은 비용과 일정의 통합관리에 의한 EV개념을 기반으로 한 건설공사 진도울 산정의 개선방안을 도출함에 있다.

  • PDF

다계층 멀티미디어 스트리밍을 위한 의미기반 패킷 스케줄링 (Semantics Aware Packet Scheduling for Optimal Quality Scalable Video Streaming)

  • 원유집;전영균;박동주;정제창
    • 한국정보과학회논문지:시스템및이론
    • /
    • 제33권10호
    • /
    • pp.722-733
    • /
    • 2006
  • 계층적 압축 기법을 지원하는 스트리밍 시스템 응용은 제한된 네트워크 자원의 효과적인 활용과 사용자가 느끼는 화질을 최대로 해야 한다. 이를 위해서는 적절한 전송 계층의 선택 및 패킷 인터벌 결정이 이루어져야 한다. 본 논문에서는 계층이 갖는 화질의 영향력을 바탕으로 패킷 인터벌 결정 및 계층 선택 알고리즘 SAPS를 제시한다. 인터-프레임 압축 기법을 사용하는 비디오 스트리밍 시스템에서 패킷 손실의 감소만으로는 재생 화질의 향상을 이룰 수 없고, 재생 화질에 높은 영향력을 가진 패킷의 복원율이 높아질 때, 비로소 재생 화질이 향상된다. SAPS는 패킷의 의존성 그래프를 바탕으로 전송 계층을 결정하며, 이렇게 결정된 전송 계층은 사용자가 느끼는 서비스의 품질을 최대로 만든다. 또한, 선택된 계층에 대한 패킷의 인터벌 조절을 통해 계층 선택에 의한 효과가 유지되도록 한다. 실험을 통해 SAPS 알고리즘이 사용자가 느끼는 서비스 품질의 향상뿐만 아니라, 네트워크 자원 활용도 효과적으로 이루고 있음을 보여준다.

도로시설 재굴착 방지를 위한 의사결정모델 및 관리시스템 개발 (Development of Decision Model and Management System to minimize Pavement Utility Cut for Road Facility)

  • 조진영;장운성;이민재
    • 한국건설관리학회논문집
    • /
    • 제14권4호
    • /
    • pp.164-171
    • /
    • 2013
  • 도시개발에 있어 도로의 건설은 교통의 목적 외에 전기, 가스, 통신, 난방, 하수, 상수, 오수 등의 도시 편의시설을 위한 공간으로도 활용되고 있다. 하지만 현재 도로 시공과정에서 각 기능에 따른 관련 주체들이 진행되는 공사수행일정에 대한 의사소통이 충분히 이루어지지 않아 재굴착 작업이 빈번히 이루어지고 있으며 이로 인해 예산의 중복투입, 공사기간 지연, 품질저하, 이용자의 불편 등 여러 가지 문제점들이 나타나고 있다. 본 연구에서는 신도시 개발과 같은 대규모의 프로젝트에서 도로 재굴착으로 인한 문제를 사전에 예방하기 위해 시간과 공간데이터를 활용한 재굴착 방지 프로세스 모델을 개발하였으며, 이를 활용하여 도시기반시설 건설주체간 원활한 협의를 돕기 위한 재굴착방지시스템을 개발하였다. 아울러, 개발된 시스템을 개발중인 신도시 건설사업에 활용하여 그 적용성을 검토하였다.