• Title/Summary/Keyword: work schedule

Search Result 586, Processing Time 0.022 seconds

Methods of Reviewing Constructability of Nuclear Power Plants Utilizing a Data-based Technology

  • Kim, Woo Joong;Lim, Byung Ki;Byon, SuJin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.147-149
    • /
    • 2015
  • A nuclear power plant construction project normally involves a large construction work of which the total project cost is over 5 trillion Won, Such a large-scale construction project has the risks of schedule delay and quality degradation due to increase in project cost, because designs are changed due to design errors. The reasons for design changes during installation are 1) insufficient engineering capability of the owner, 2) information discontinuance due to the multiple package method, and 3) inefficient constructability review processes. Accordingly, this study proposes, through problem analysis, a method of developing a constructability review system that utilizes constructability review processes and a data-based technology (3D modeling) that are optimized for nuclear power plant construction projects. It also presents a method of establishing a system for reviewing constructability in which constructability review processes and a Database (3D model, Schedule, Design change Items) are linked each other.

  • PDF

BASIC DESIGN OF A SCHEDULING TOOL FOR SMART DEVICES

  • Myunghoun Jang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.521-524
    • /
    • 2013
  • Schedule management of construction work is important in order to complete construction projects within a given period of time. Many efforts have been made and many tools have been developed in order to manage construction projects by a smart device such as smart phones and smart pads. This research proposed a basic design to manage construction schedules via a smart device using Flash. The interactive and graphic property of Flash enables a field manager to manage schedules easily and efficiently. A basic structure was designed for a user to be able to make and change a schedule by touching the smart device's screen. And a prototype was implemented by Adobe Flash/Flex Builder, it is applied to a sample network in a smart phone.

  • PDF

A Study on Scheduling Periodic Examinations for the Early Detection of Breast Cancer in Korea (유방암 조기진단을 위한 검진주기 결정에 대한 연구)

  • Jeong, Seong-Hwa;Kang, Dae-Ryong;Hur, Nam-Wook;Kim, Jin-Heum;Lee, Soon-Young;Jung, Sang-Hyuk;Nam, Chung-Mo
    • Journal of Preventive Medicine and Public Health
    • /
    • v.39 no.4
    • /
    • pp.346-352
    • /
    • 2006
  • Objectives: The purposes of this study were to propose a screening schedule for the early detection of breast cancer among Korean women, as based on the statistical model, and to compare the efficacy of the proposed screening schedule with the current recommendations. Methods: The development of the screening schedule for breast cancer closely followed the work of Lee and Zelen (1998). We calculated the age-specific breast cancer incidence rate from the Korea Central Cancer Registry (2003), and then we estimated the scheduling of periodic examinations for the early detection of breast cancer, using mammography, and based on the threshold method. The efficacy of the derived screening schedule was evaluated by the schedule sensitivity. Results: For estimating the screening schedule threshold method, we set the threshold value as the probability of being in the preclinical stage at age 35, the sensitivity of mammography as 0.9 and the mean sojourn time in the preclinical stage as 4 years. This method generated 14 examinations within the age interval [40, 69] of 40.0, 41.3, 42.7, 44.1, 45.4, 46.7, 48.0, 49.3, 51.0, 53.2, 55.3, 57.1, 59.0 and 63.6 years, and the schedule sensitivity was 75.4%. The proposed screening schedule detected 85.2% (74.5/87.4) of the cases that could have been detected by annual screening, but it required only about 48.7% (14.0/30.0) of the total number of examinations. We also examined the threshold screening schedules for a range of sensitivities of mammography and the mean sojourn time in the preclinical stage. Conclusions: The proposed screening schedule for breast cancer with using the threshold method will be helpful to provide guidelines for a public health program for choosing an effective screening schedule for breast cancer among Korean women.

Concept Selection of NPP Construction Delay Risk Assessment Methodology Using Systems Engineering Approach

  • Hossen, Muhammed Mufazzal;Kang, Sunkoo;Jung, JC;Kim, Jonghyun
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.11 no.1
    • /
    • pp.9-24
    • /
    • 2015
  • Construction industry faces a lot of inherent uncertainties and issues and the construction phase of nuclear power project is not free from this risk. This paper investigates promising methodologies to be used on nuclear power plant (NPP) construction schedule delay risk assessment by using entry level systems engineering approach. This study contains how the initial concept for the risk assessment methodology has been developed. In this point of view, this work structured on three main phases: needs analysis (NA), concept exploration (CE), and concept definition (CD) through systems engineering (SE) approach. Traditionally, the SE process is applied to technical development programs but this study opens up a new avenue that SE can also be successfully applied to the development and optimization of the risk assessment model. This study provides a rational and systematic process for developing and selecting the best risk assessment model. This paper selects analytic hierarchy process (AHP) method to assess NPP construction schedule delay risk for international project. As conclusion, the proposed concept and selected method can discriminate successfully and clearly among schedule delay risk assessment methods.

Analysis Testing of Sociocultural Factors Influence on Human Reliability within Sociotechnical Systems: The Algerian Oil Companies

  • Laidoune, Abdelbaki;Rahal Gharbi, Med El Hadi
    • Safety and Health at Work
    • /
    • v.7 no.3
    • /
    • pp.194-200
    • /
    • 2016
  • Background: The influence of sociocultural factors on human reliability within an open sociotechnical systems is highlighted. The design of such systems is enhanced by experience feedback. Methods: The study was focused on a survey related to the observation of working cases, and by processing of incident/accident statistics and semistructured interviews in the qualitative part. In order to consolidate the study approach, we considered a schedule for the purpose of standard statistical measurements. We tried to be unbiased by supporting an exhaustive list of all worker categories including age, sex, educational level, prescribed task, accountability level, etc. The survey was reinforced by a schedule distributed to 300 workers belonging to two oil companies. This schedule comprises 30 items related to six main factors that influence human reliability. Results: Qualitative observations and schedule data processing had shown that the sociocultural factors can negatively and positively influence operator behaviors. Conclusion: The explored sociocultural factors influence the human reliability both in qualitative and quantitative manners. The proposed model shows how reliability can be enhanced by some measures such as experience feedback based on, for example, safety improvements, training, and information. With that is added the continuous systems improvements to improve sociocultural reality and to reduce negative behaviors.

New OTP Authentication Approach based on Table Pattern Schedule (테이블 패턴 스케줄 기반 OTP 인증)

  • Balilo, Benedicto B. Jr.;Gerardo, Bobby D.;Medina, Ruji P.;Byun, Yung-Cheol
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.12
    • /
    • pp.1899-1904
    • /
    • 2017
  • This paper presents a new one-time password approach generated based on $4{\times}4$ pattern schedule. It demonstrates generation of passkey from initial seed of random codes and mapping out in table pattern schedule which will produce a new form of OTP scheme in protecting information or data. The OTP-2FA has been recognized by many organizations as a landmark to authentication techniques. OTP is the solution to the shortcomings of the traditional user name/password authentication. With the application of OTP, some have benefited already while others have had second thoughts because of some considerations like cryptographic issue. This paper presents a new method of algorithmic approach based on table schedule (grid authentication). The generation of OTP will be based on the random parameters that will be mapped out in rows and columns allowing the user to form the XY values to get the appropriate values. The algorithm will capture the values and extract the predefined characters that produce the OTP codes. This scheme can work in any information verification system to enhance the security, trust and confidence of the user.

INTEGRATION MODEL OF COST AND SCHEDULE IN STEEL BOX GIRDER BRIDGE PRODUCTION PROCESS

  • Seok Kim;Kyoungmin Kim;Seung-Ho Ha ;Kyong Ju Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1262-1267
    • /
    • 2005
  • It is still difficult to share and utilize the information generated at each phase of a steel box girder production process due to the spatial gap and different level of management information. The physical distance results in the inefficiency of the information transmission, the accidental omission and typos of the relative information, and so on. Various levels of management information make it difficult to embody a new management system. Eventually, these factors incur the loss of cost and schedule and interrupt development of a new management system. This paper analyzes a current process and presents graphical process flow by using IDEF0. Based this analysis, the research for new production process and work breakdown structure (WBS) is conducted. At the end of this paper, the conceptual design of this system is suggested. Through new management system, it is expected that the model proposed in this study will improve the management process in the steel box production, and the improved process will reduce the redundant cost and schedule information, transmission and deposit generated by manual paper.

  • PDF

The Aspects of Skin Disease, Particularly Acne in Nurses on Rotating Shift and Daytime Fixed Work Schedules (면포를 중심으로 한 순환교대근무 간호사와 주간고정근무 간호사의 피부질환 양태에 관한 연구)

  • Ock, Min-Keun;Park, Soo-Eun;Kim, Chang-Hwan;Huh, Yeon-Sik
    • The Journal of Korean Medicine Ophthalmology and Otolaryngology and Dermatology
    • /
    • v.19 no.3 s.31
    • /
    • pp.180-188
    • /
    • 2006
  • Objectives : The purpose of this study is to investigate the differences of skin disease, particularly Acne between the rotating shift work nurses and the nurses on a fixed day schedule. Methods : Questionnaries were distributed to 30 rotating shift work nurses(the rotating group) and 34 nurses on a fixed day schedule(the daytime group). The questionnaris included questions on general health concepts, insomnia skin disease(particularly Acne), gastroenteric trouble, menstrual irregularity. Result : 1. There was significant difference on skin disease(particularly Acne) between two groups. 2. There was no significant relation between Gastroenteric trouble and Acne. But, in particular, there was significant relation between Constipation, Gastritis and Acne. 3. There was no significant relation between menstrual irregularity and Acne. 4. In Acne group, more than 70% felt the necessity of treatment, but only 2.5% used Korean Oriental Medical therapy. Conclusion : Disorder of circadian rhythm affects the skin disease(particularly Acne) more than Gastroenteric trouble and menstrual irregularity. But in this study, the total number of the nurse is not enough. So we need more accurate study about the aspects of skin disease. And about the Acne, publicity of Korean Oriental Medical therapy is required.

  • PDF

A Study on the P.S.M. system for the Construction Safety (건설안전을 위한 P.S.M. 기법에 관한 연구)

  • Lee, Song;Son, Gi-Sang;Choi, Won-Il;Oh, Tae-Sang;Chae, Jum-Sik
    • Journal of the Korean Society of Safety
    • /
    • v.15 no.4
    • /
    • pp.101-111
    • /
    • 2000
  • In order to introduce P.S.M. system adequate to domestic construction first, many cases similar to advanced foreign P.S.M. system have been collected and compared to the domestic situation. Then, the current safety management status of bridges, subways, apartment and office building construction are investigated while visiting interview, using questionnaire at site have being done. The potential hazard and measurement have been investigated for each kind of works, and the domestic introducing method of P.S.M. system is analyzed with expert discussion. In order to represent how to make out P.S.M. plan, the questionnaire is made out using each five place for bridge, subways, apartment and office building. As the weight factor for potential hazard of each work obtained from more than forty site places, is produced and shown. Also, a direction the recommendation is suggested to improve tool in each construction site with work schedule. It is thought that proposed schedule contributed to keeping in safe business administration of each company in decreasing many effort at the construction site.

  • PDF

Apartment house project cost schedule for integrated management BIM-based BoQ application plan (공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안)

  • Zheng, Lianyi;Kim, Woong-Gi;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.11 no.2
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.