PRODUCTIVITY PREDICTION MODEL BASED ON PRODUCTIVION INFLUENCING FACTORS: FOCUSED ON FORMWORK OF RESIDENTIAL BUILDING

  • Byungki Kwon;Hyun-soo Lee;Moonseo Park;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.58-65
    • /
    • 2011
  • Construction Productivity is one of the most important elements in construction management. It is used in construction process scheduling and cost management, which are significant sector in construction management. It is important to make appropriate schedule and monitor how works are done within schedule. But construction project contains uncertainty and inexactitude, modifying construction schedule is being an issue to manage construction works well. Even though prediction and monitoring of productivity can be principal activity, it is hard to predict productivity with manager's experience and a standard of estimate. A large number of factors influencing productivity, such as drawing, construction method, weather, labor, material, equipment, etc. But current calculation of productivity depends on empirical probability, not consider difference of each influencing factor. In this research, the aim is to present a productivity predicting regression model of form work, which includes effectiveness of influences factors. 5 variables existed inside form work are selected by interview and site research based on literature review of existed various productivity influencing factors. The effectiveness and correlation of productivity influencing factors are analyzed by statistical approach, and it is used to make productivity regression model. The finding of this research will improves monitoring and controlling of project schedule in construction phase.

  • PDF

Development of CPAM(Construction Process Analysis Model) based on Lean Construction Principles (린 건설 원리에 기초한 건설 생산 공정 분석 모델에 관한 연구)

  • Kim Chan Hun;Kim Chang Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.48-61
    • /
    • 2001
  • This study aims at improving work reliability. It proposes a way to overcome the limitations of current scheduling methods by providing a new framework, CPAM(Construction Process Analysis Model) based on the lean principles. It suggests methods which improve work reliability and production effectiveness with variability control methods. Also it suggests methods which reduce inventories of materials and equipment and WIP(Work In Process) using two techniques; Lookahead Schedule and Weekly Work Plan. The contribution of this research also includes that it assumes planning as a process of reducing uncertainty and maximizing throughput, counter-posing plan reliability to resource redundancy as alternative strategies for managing in conditions of uncertain work flow.

  • PDF

The Effects of Human Touch on Turnover Intention of Airport Ground Handling Employees (휴먼터치가 지상조업 종사자의 이직의도에 미치는 영향)

  • Lee, Min-Hoo;Lee, Yung-Kil;Kim, Ki-Woong;Choi, Youn-Chul;Park, Sung-Sik
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.24 no.2
    • /
    • pp.31-46
    • /
    • 2016
  • The purpose of this study is to examine the effects of human touch on turnover intention of ground handling employees at airport. Additionally, this study examines a comprehensive mediating effect of the work schedule and workload between human touch and turnover intention. To examine them, over 700 ground handling employees from six international airports of South Korea were surveyed using the simple random sampling method. The instrument for data collection was a questionnaire, and it was developed based on previous research results. The methodology adopted in this study is the structural equation modeling (SEM). According to SEM analysis, it was proven that both psychological and physical human touch have a significant effect on turnover intention of the employees. Work schedule played a mediating role among all three factors of human touch and turnover intention. However, workload has a mediating effect only between communication human touch and turnover intention. Based on the above findings, theoretical and practical implications are also discussed.

Construction Delay Analysis Using Daily Work Report Data for Short Construction Seasons

  • Jamal, Md Shah;Abdelaty, Ahmed;Shrestha, K. Joseph
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.616-623
    • /
    • 2022
  • Some regions and states, such as Wyoming, have harsh weather conditions, forcing most transportation projects to be completed under tight schedules. However, construction projects are not only delayed by weather conditions, but also delayed by other factors such as contractor's competency, resource availability, coordination issues, and safety. Also, the construction method, geographical location of the projects, and inability to follow baseline schedules accurately due to the contractor's resource allocation are also reasons for the delay. This paper discusses the main reasons for the delay in the public transportation projects based on Daily Work Reports (DWRs) from five different transportation projects of the last three years in Wyoming. This paper focuses on the inconsistencies of the contractor's schedules to complete the project according to the baseline schedule. First, the authors collected DWRs and baseline schedules from the Wyoming Department of Transportation (WYDOT). Second, the DWR data are compared against the baseline schedules to determine the reasons for delaying their significance. Finally, the paper presents the recommendations to mitigate the effects of delays on public transportation projects as well as to improve the documentation process of DWR data.

  • PDF

A Genetic Algorithm and Discrete-Event Simulation Approach to the Dynamic Scheduling (유전 알고리즘과 시뮬레이션을 통한 동적 스케줄링)

  • Yoon, Sanghan;Lee, Jonghwan;Jung, Gwan-Young;Lee, Hyunsoo;Wie, Doyeong;Jeong, Jiyong;Seo, Yeongbok
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.36 no.4
    • /
    • pp.116-122
    • /
    • 2013
  • This study develops a dynamic scheduling model for parallel machine scheduling problem based on genetic algorithm (GA). GA combined with discrete event simulation to minimize the makespan and verifies the effectiveness of the developed model. This research consists of two stages. In the first stage, work sequence will be generated using GA, and the second stage developed work schedule applied to a real work area to verify that it could be executed in real work environment and remove the overlapping work, which causes bottleneck and long lead time. If not, go back to the first stage and develop another schedule until satisfied. Small size problem was experimented and suggested a reasonable schedule within limited resources. As a result of this research, work efficiency is increased, cycle time is decreased, and due date is satisfied within existed resources.

Overemployment of Workers in Penang, Malaysia: An Empirical Analysis

  • Fernandez, Jacqueline Liza;Shiang, Lim Ee
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.4 no.4
    • /
    • pp.17-26
    • /
    • 2017
  • Many workers today encounter the problem of overemployment which occurs when actual working hours exceed preferred or desired working hours. Overemployed workers desire to work fewer hours although this may entail a concomitant decline in earnings. This research is conducted to examine the likelihood of overemployment among employees in a particular state in Malaysia, that is, Penang. This study uses primary data that was collected in a survey encompassing a total of 525 employees in the state. A logit model is used to analyse the relationship between the likelihood of overemployment and various socio-demographic, household and work-related variables. The factors that are significantly related to overemployment are ethnicity, age, education, number of children in the household, occupation, hours of work and control over work schedule. Based on the findings of this paper, it is suggested that policies such as offering part-time jobs or job-sharing options to older workers, implementing family-friendly policies, adopting decent working time measures and strategies that give workers more control over their work schedule are some possible ways to deal with the issue of overemployment.

ACTIVITY-BASED STRATEGIC WORK PLANNING AND CREW MANAGEMENT IN CONSTRUCTION: UTILIZATION OF CREWS WITH MULTIPLE SKILL LEVELS

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;SangHyun Lee;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.359-366
    • /
    • 2013
  • Although many research efforts have been conducted to address the effect of crew members' work skills (e.g., technical and planning skills) on work performance (e.g., work duration and quality) in construction projects, the relationship between skill and performance has generated a great deal of controversy in the field of management (Inkpen and Crossan 1995). This controversy can lead to under- or over-estimations of the overall project schedule, and can make it difficult for project managers to implement appropriate managerial policies for enhancing project performance. To address this issue, the following aspects need to be considered: (a) work performances are determined not only by individual-level work skill but also by the group-level work skill affected by work team members, each member's role, and any working behavior pattern; (b) work planning has significant effects on to what extent work skill enhances performance; and (c) different types of activities in construction require different types of work, skill, and team composition. This research, therefore, develops a system dynamics (SD) model to analyze the effects of both individual-and group-level (i.e., multi-level) skill on performances by utilizing the advantages of SD in capturing a feedback process and state changes, especially in human factors (e.g., attitude, ability, and behavior). The model incorporates: (a) a multi-level skill evolution and relevant behavior development mechanism within a work group; (b) the interaction among work planning, a crew's skill-learning, skill manifestation, and performances; and (c) the different work characteristics of each activity. This model can be utilized to implement appropriate work planning (e.g., work scope and work schedule) and crew management policies (e.g., work team composition and decision of each worker's role) with an awareness of crew's skill and work performance. Understanding the different characteristics of each activity can also support project managers in applying strategic work planning and crew management for a corresponding activity, which may enhance each activity's performance, as well as the overall project performance.

  • PDF

A Heuristic Approach to the Shift-scheduling Considering the Balance of Work-load in Nuclear Power Plants (호텔 요리사의 인간공학적 작업 위험성 평가)

  • Kim, Dae-Ho;Yun, Young-Su;Lee, Yong-Hee
    • Journal of the Ergonomics Society of Korea
    • /
    • v.25 no.4
    • /
    • pp.1-7
    • /
    • 2006
  • The purpose of this study is to develop an efficient algorithm for the management of the shift schedule in nuclear power plants in consideration with the ergonomic criteria and the regulatory codes. The ergonomic criteria considered are the work hours, overtime-work frequency and working time, start and finishing time of works, allocation of rest times and duty-offs, rotating of shifts, etc. to comply with the regulations such as the Labor Standard Act, the ILO Convention No. 171, 178, "the detailed content of a periodic safety review," enforcement regulations 19-2 of the Atomic Energy Act. The developed algorithm for the shift schedule program adopts a heuristic method to minimize the difference the workload for shift workers in nuclear power plants.

Development of Activity and WBS for Integrated Cost and Schedule Control Process in Bridge Works (공정$\cdot$공사비 통합관리를 위한 Activity 및 WBS 구축 방안 -교량공사 예시)

  • Kim Jung-Ki;Lee Young-Dae;Kim Soo-Yong;Park Hyeo;Kim Sung-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.406-409
    • /
    • 2001
  • This study refers to development of WBS(Work Breakdown Structure) and Activity sample for integrated cost and schedule control system of sample bridge work in the field. The conclusions from this study may be summarized as following 1. It showed that the level of detail to network's activities depend upon schedule's intended purpose. 2. It is more effective 'activity to cost package model' than 'activity to resource model', for integrated cost and schedule control reflect the characteristics of domestic construction industry.

  • PDF

Maintenance Staff Scheduling at Afam Power Station

  • Alfares, H.K.;Lilly, M.T.;Emovon, I.
    • Industrial Engineering and Management Systems
    • /
    • v.6 no.1
    • /
    • pp.22-27
    • /
    • 2007
  • This paper describes the optimization of maintenance workforce scheduling at Afam power station in Nigeria. The objective is to determine the optimum schedule to satisfy growing maintenance labour requirements with minimum cost and highest efficiency. Three alternative maintenance workforce schedules are compared. The first alternative is to continue with the traditional five-day workweek schedule currently being practiced by Afam power station maintenance line. The second alternative is to switch to a seven-day workweek schedule for the morning shift only. The third alternative is to use a seven-day workweek schedule for all three work shifts. The third alternative is chosen, as it is expected to save 11% of the maintenance labour cost.