• Title/Summary/Keyword: work schedule

Search Result 591, Processing Time 0.024 seconds

Job Assignment Simulation of Ship Hull Production Design in Consideration of Mid-Term Schedule (중일정계획을 고려한 선체 생산설계 작업할당 시뮬레이션)

  • Son, Myeong-Jo;Kim, Tae-Wan
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.50 no.5
    • /
    • pp.334-342
    • /
    • 2013
  • In this paper, we analyze the procedure of the design manager for the enhancement of the hull production design process by use of the simulation method. Normally, design manager assigns design jobs according to various methods and estimates the corresponding results. When the construction drawing which is the output of the detail design where a design is dealt by zones, the design manager identifies blocks and analyzes their work difficulties, and assigns jobs to design engineers who are different in capabilities. These processes including the design engineer who can be modeled with man-hours evaluation model are represented in detail as a simulation model. As the high-level modeling for the discrete-event system, we use Event Graph model. And we implemented the simulation using Simkit which is open simulation engine for the discrete-event system. We made the simulation scenario to be written by a user in the scenario generator which is separated from the simulation model, and made the simulation result to be visualized in the form of Gantt chart in a Web. In the scenario of the irregular issuance for various construction drawings which contain different numbers of blocks, we performed the Monte-Carlo simulation according to various assignment methods to find the assignment result that satisfies the mid-term schedule.

A Case Study on Application of Dispatching Rule-Based Advanced Planning and Scheduling (APS) System (디스패칭 룰 기반의 Advanced Planning and Scheduling (APS) 시스템 활용 사례연구)

  • Lee, Jae-yong;Shin, Moonsoo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.3
    • /
    • pp.78-86
    • /
    • 2015
  • Up-to-date business environment for manufacturers is very complex and rapidly changing. In other words, companies are facing a variety of changes, such as diversifying customer requirements, shortening product life cycles, and switching to small quantity batch production. In this situation, the companies are introducing the concept of JIT (just-in-time) to solve the problem of on-time production and on-time delivery for survival. Though many companies have introduced ERP (enterprise resource planning) systems and MRP (material requirement planning) systems, the performance of these systems seems to fall short of expectations. In this paper, the case study on introducing an APS (advanced planning and scheduling) system based on dispatching rules to a machining company and on finding a method to establish an efficient production schedule is presented. The case company has trouble creating an effective production plan and schedule, even though it is equipped with an MRP-based ERP system. The APS system is applied to CNC (computer numerical control) machines, which are key machines of the case company. The overall progress of this research is as follows. First, we collect and analyze the master data on individual products and processes of the case company in order to build a production scheduling model. Second, we perform a pre-allocation simulation based on dispatching rules in order to calculate the priority of each order. Third, we perform a set of production simulations applying the priority value in order to evaluate production lead time and tardiness of pre-defined dispatching rules. Finally, we select the optimal dispatching rule suitable for work situation of the case company. As a result, an improved production schedule leads to an increase in production and reduced production lead time.

Development of Shipbuilding Execution Scheduling Support System using Mobile Device : A Case Study for a Panel Block Assembly Shop (모바일 기기를 활용한 조선 생산 실행계획 지원 시스템 개발 : 판넬라인 개발 사례를 중심으로)

  • Hwang, Inhyuck;Song, Jungkyu;Back, Myunggi;Ryu, Cheolho;Lee, Kwangkook;Shin, Jong Gye
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.50 no.4
    • /
    • pp.262-271
    • /
    • 2013
  • Owing to the development of mobile communication technology during the last a few years, the number of users of mobile devices such as the smartphone and the tablet PC has increased rapidly. As a result, the range of applications of the mobile devices has also been greatly expanded from an application for the convenience of daily life to an application for assisting the operations of industrial fields. Especially, portability of mobile devices can provide great help in collecting and using information on the production site. In shipbuilding production processes, it is difficult to collect changes of circumstance in the field and reflect the changes to schedule due to the low production automation rate and frequent changes in schedule. In this study, we propose a system to solve the problems of shipbuilding production processes such as the ones described above by using mobile devices. First of all, we organize the production information and production processes of the panel line through the analysis of shipyard panel line operations. Next, we have developed a system that can support the production execution plan of the panel line and monitor the production processes in the field. The system was developed utilizing application virtualization to allow access to the system from various platforms of mobile devices and PC's. The system was implemented using ooCBD methodology considering the future expansion of the system and ease of maintenance.

Development of an Analysis Program for Small Horizontal Wind Turbines Considering Side Furling and Optimal Torque Scheduling (사이드 펄링과 최적 토크스케줄을 고려한 소형 풍력터빈 해석 프로그램 개발)

  • Jang, Hyeon-Mu;Kim, Dong-Myeong;Paek, In-Su
    • Journal of the Korean Solar Energy Society
    • /
    • v.38 no.2
    • /
    • pp.15-31
    • /
    • 2018
  • A program to design a small capacity wind turbine blade is proposed in this study. The program is based on a matlab GUI environment and designed to perform blade design based on the blade element momentum theory. The program is different from other simulation tools available in a point that it can analyze the side-furling power regulation mechanism and also has an algorithm to find out optimal torque schedule above the rated wind speed region. The side-furling power regulation is used for small-capacity horizontal axis wind turbines because they cannot use active pitch control due to high cost which is commonly used for large-capacity wind turbine. Also, the torque schedule above the rated wind speed region should be different from that of the large capacity wind turbines because active pitching is not used. The program developed in this study was validated with the results with FAST which is the only program that can analyze the performance of side-furled wind turbines. For the validation a commercial 10 kW wind turbine data which is available in the literature was used. From the validation, it was found that the performance prediction from the proposed simple program is close to those from FAST. It was also found that the optimal torque scheduling from the proposed program was found to increase the turbine power substantially. Further experimental validation will be performed as a future work.

Development of a Payment System for Telemedicine (원격진료 보수지불체계 설정방향에 관한 연구)

  • 염용권;명희봉;이윤태;김동욱;서원식;이관익
    • Health Policy and Management
    • /
    • v.7 no.2
    • /
    • pp.65-88
    • /
    • 1997
  • In Korea, telemedicine is still under the beginning stage, but we expect that the developing 'Information Highway' will make this technology more common place and more easily used in coming soon. Currently, three hospitals are providing telemedicine services with their subsidiary hospitals which are far away from their remote place. However, the fee schedule of telemedicine services are not well-settled down, of course not reimbursed through current health insurance system. This study aims to develop new payment system for medical services provided through telemedicaine system. To design appropriate fee schedule for telemedicine services, we, first, review the current insurance payment system and telemedicine system both in domestic and foreign countries focusing on its payment system. A framework of telemedicine payment system is proposed in following steps based on information we acquired from this stage. Second. We decide the span of cost items which should be covered by telemedicine payment scheme. In hear, we suggest payment method for telemedicine services should be designed as dual structure which are telemedicine fee that should be reimbursed through payment scheme and any costs related to capital investment that should not be covered by payment system. Which is, payment system for telemedicine services should cover only service-related costs and any costs related to capital investment should be generated through third party such as government, health insurance association, etc. Finally, we suggest new fee schedules for telemedicine services. The key issues on developing telemedicine fee schedules are related with the determination of appropriate additional rate($\alpha$). The reasonable additional rate($\alpha$) must determine through careful evaluation of any additional efforts(e. g. : additional work hours which are related to providing telemedicine services). This study shows the process of how to determine appropriate additional rate($\alpha$).

  • PDF

What Factors Make the Delay of the Information System Project Implementation? (무엇이 정보시스템 프로젝트 일정을 지연시키는가?)

  • Seoung, Byung Ook;Park, Sang Cheol;Koh, Joon
    • Knowledge Management Research
    • /
    • v.22 no.1
    • /
    • pp.1-19
    • /
    • 2021
  • Large-scaled hospital information system projects are often delayed than originally planned. Regarding project management, it is necessary to examine main factors triggering the schedule delay and to analyze the causality of such delay. This study tries to find the delay factors and causal relationship between them based on the case of the hospital information system development project by using the grounded theory method. It turned out that 'unrealistic scheduling' affects overall schedule delays like domino phenomenon, and 'poor analysis of existing systems' leads to poor quality of work analysis while 'poor subsystem integrated interface' triggers poor design quality. This study found out the factors affecting the delay of a project, analyzing cause-and-effect relationships between them in the academic side. From the practical view, it shows a solution to minimize delays in the project schedule for each of SI companies, hospitals and project managers.

Estimating System for Responsible Days of Schedule Delay for Construction Projects through Time Impact Analysis (건설공사 공기지연 영향분석을 통한 책임일수 산정체계 구축방안)

  • Kang, Leen-Seok;Kwon, Jung-Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.685-694
    • /
    • 2008
  • Recently, construction projects are being gradually changed to large projects with complicated work processes. As a result, claims are increasing as well. Of these, the claims by delayed construction duration are given much weight in the general construction claims. To solve this problem, researches to estimate damages due to delay are carried out in research institutes by analyzing the causes of schedule delay. A system to easily estimate responsible days by analyzing the complicated processes needs for project manager. This study suggests a methodology based on the time impact analysis method, which can utilize the consequential analytical method with the consideration of reduced construction period. The suggested methodology is verified by comparing with actual data of case study by the computerized system for estimating the responsible days.

A Quasi-optimal Restaurant Work Scheduling Based-on Genetic Algorithm with Fuzzy Logic

  • Watanabe, Makoto;Nobuhara, Hajime;Kawamoto, Kazuhiko;Yoshida, Shin-ichi;Hirota, Kaoru
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2003.09a
    • /
    • pp.517-520
    • /
    • 2003
  • A quasi-optimization algorithm for generating a chain restaurant work scheduling (WS) is proposed based on Genetic Algorithm with fuzzy logic, where the whole weekly chain restaurant WS problem is decomposed to 7 daily WS problems and a combined weekly WS problem. Experimental result shows that a weekly schedule for 15 workers and 24 hours in a chain restaurant is produced in 6 minutes using the proposed algorithm implemented with C++ and executed on a PC(Athlon XP 1900+), where the quality of WS is satisfactorily evaluated by professional experts.

  • PDF

Distributed Multimedia Scheduling in the Cloud

  • Zheng, Mengting;Wang, Wei
    • Journal of Multimedia Information System
    • /
    • v.2 no.1
    • /
    • pp.143-152
    • /
    • 2015
  • Multimedia services in the cloud have become a popular trend in the big data environment. However, how to efficiently schedule a large number of multimedia services in the cloud is still an open and challengeable problem. Current cloud-based scheduling algorithms exist the following problems: 1) the content of the multimedia is ignored, and 2) the cloud platform is a known parameter, which makes current solutions are difficult to utilize practically. To resolve the above issues completely, in this work, we propose a novel distributed multimedia scheduling to satisfy the objectives: 1) Develop a general cloud-based multimedia scheduling model which is able to apply to different multimedia applications and service platforms; 2) Design a distributed scheduling algorithm in which each user makes a decision based on its local information without knowing the others' information; 3) The computational complexity of the proposed scheduling algorithm is low and it is asymptotically optimal in any case. Numerous simulations have demonstrated that the proposed scheduling can work well in all the cloud service environments.

Workload evaluation of squat sitting postures (쪼그려 앉은 작업자세에서의 작업부하 평가)

  • 이인석;정민근
    • Proceedings of the ESK Conference
    • /
    • 1997.04a
    • /
    • pp.90-94
    • /
    • 1997
  • Many workers like welders are working in squat sitting postures with te object on the ground for an entire work shift. It is suspected that such prolonged squat sitting without any supporting stool would gradually cause musculoskeletal injuries to workers. This study is to quantitatively evaluate the physical stress caused by the prolonged squat sitting and to recommend a safe work/rest schedule for the task with squat sitting posture based on the lab experiment. In this study, 8 healthy student subjects participated in the experiment. They maintained a squat sitting posture for 16 minutes with 4 different stool height conditions: no stool, 10cm hight, 15cm height, 20cm height. Every 2 minutes, the discomfort was subjectively assessed using the magnitude estimation method for the whole body, lower back, upper leg and lower leg. Based on discomfort rating, we found that 10cm height stool relieved the workload most. Discomfort rating results also indicated that 20cm height stool showed the heghest workload, and that there was no difference in workload between 15cm height and no stool. We recommend to provide the workers with 10cm height stool for prolonged squat sitting tasks.

  • PDF