Problems of Working Hours and Shift Work Systems, and Propsed Methods for Their Improvement (근로시간 및 교대근무편성의 문제점과 개선방향)

  • Seo, Yu-Jin;;Park, Yeong-Man;Mun, Se-Geun
    • Journal of the Ergonomics Society of Korea
    • /
    • v.22 no.3
    • /
    • pp.13-26
    • /
    • 2003
  • The purpose of this study is to investigate the present conditions of the night work and shift work systems in the heavy chemical industrial complexes found in Changwon, Masan, and Chinhae. Korea. We will attempt to define and classify their problems; and to discover further ways to improve their systems. Fifty production factories were carefully selected as the subjects for this study. The shift systems were classified into five categories. The consecutive night shifts were long in almost all cases with 6 days (36 factories) and 7 days (13 factories). It was found that the night work of about] 2 hours continues for a long period in the weekly rotation full-day shift systems and the night-including non-full-day shift systems, and there was no holiday during a shift cycle in the continuous full-day shift systems. The work time in most shift systems was longer than the 44-hours/week permitted by Korean law. Considering the characteristics of these various types of shift systems, the most essential thing to reduce the shift workers' work load may be to shorten their working hours and improve the schedule of shift systems. It is highly recommended as a fundamental solution. to reduce the portal-to-portal hours from 12 to 8 in the night-including non-full-day shift systems and the weekly rotation full-day shift systems, and at least to employ a 4-team 3-shift system in the continuous full-day shift systems. In addition to this, it should from now on be taken as a goal to restructure the types of shift systems by taking such measures as avoiding continuous night work if possible, providing sufficient off-duty intervals both before and after night shift, providing increased opportunities for workers to nap during night work. and increasing the number of holidays.

A Study on the Work-time Estimation for Block Erections Using Stacking Ensemble Learning (Stacking Ensemble Learning을 활용한 블록 탑재 시수 예측)

  • Kwon, Hyukcheon;Ruy, Wonsun
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.56 no.6
    • /
    • pp.488-496
    • /
    • 2019
  • The estimation of block erection work time at a dock is one of the important factors when establishing or managing the total shipbuilding schedule. In order to predict the work time, it is a natural approach that the existing block erection data would be used to solve the problem. Generally the work time per unit is the product of coefficient value, quantity, and product value. Previously, the work time per unit is determined statistically by unit load data. However, we estimate the work time per unit through work time coefficient value from series ships using machine learning. In machine learning, the outcome depends mainly on how the training data is organized. Therefore, in this study, we use 'Feature Engineering' to determine which one should be used as features, and to check their influence on the result. In order to get the coefficient value of each block, we try to solve this problem through the Ensemble learning methods which is actively used nowadays. Among the many techniques of Ensemble learning, the final model is constructed by Stacking Ensemble techniques, consisting of the existing Ensemble models (Decision Tree, Random Forest, Gradient Boost, Square Loss Gradient Boost, XG Boost), and the accuracy is maximized by selecting three candidates among all models. Finally, the results of this study are verified by the predicted total work time for one ship among the same series.

Fabrication of copper thin foils with 36 microns by cold rolling (냉간 압연 공정에 의한 두께 $36{\mu}m$ 동극박 제조 공정 해석)

  • Lee, S.H.;Kim, B.M.
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2007.05a
    • /
    • pp.413-416
    • /
    • 2007
  • In general, by means of the electrodepositing technique, a copper foil sample was prepared with a high purity and a high density. But the mechanical properties of the electrodepositing copper foil was lower than it's the rolling copper foil. However, the production of copper foil with approximately 36 microns thick in rolling process was very difficult. This paper describes the outline of the high accuracy cold rolling in 6 high mill which was developed for the purpose of rolling very thin accurate gauge copper foil(36 micron thick), and give several rolling characteristic of 600 mm wide copper foil. a) Large strain can be accumulated pass by pass in industrial multi-pass rolling processing to overcome large critical strain for thickness accuracy through optimization of rolling schedule. b) Also, permissible tension for rolling 0.45 $\sim$ 0.036 mm thick copper strip stably in accordance with the each pass work had been established by FEM simulation results. c) During the plate rolling process, considerable values of the forces of material pressure on the tool occur. These pressures cause the elastic deformation of the roll, thus changing the shape of the deformation region. A numerical simulation of roll deflection during cold rolling is presented in the paper. d) The proposed pass schedule can roll very thin copper foil of 36 micron thickness to a tolerance of ${\pm}1$ microns. The validity of simulated results was verified into rolling experiments on the copper foil.

  • PDF

A Study on the Improvement of Construction Progress Measurement Based on Earned Value Concept (EV기반 RC 공사 진도율산정 개선방안)

  • Choi Tae-Young;Jung Hye-Won;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.307-310
    • /
    • 2003
  • Construction projects include risks due to uncertain factors, so it's important to repeatedly evaluate the performance of on-going work in all aspects of the projects. But construction projects are usually managed focusing on the results of projects. Moreover, cost and schedule are managed separately even though the efficiency of integrated management is very high. Recently many researches about cost and schedule integration methods are in progress according to the increasing of interest and EVMS (Earned Value Management System). Though researchers comment and propose many methods, it's hard to find example to apply it to the real project. So, the purpose of this study is to improve a method of construction Progress measurement Based on Earned value Concept by integration of cost and schedule management. It investigates the previous studies, interviews and performs a case study.

  • PDF

Semantics Aware Packet Scheduling for Optimal Quality Scalable Video Streaming (다계층 멀티미디어 스트리밍을 위한 의미기반 패킷 스케줄링)

  • Won, Yo-Jip;Jeon, Yeong-Gyun;Park, Dong-Ju;Jeong, Je-Chang
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.33 no.10
    • /
    • pp.722-733
    • /
    • 2006
  • In scalable streaming application, there are two important knobs to tune to effectively exploit the underlying network resource and to maximize the user perceivable quality of service(QoS): layer selection and packet scheduling. In this work, we propose Semantics Aware Packet Scheduling (SAPS) algorithm to address these issues. Using packet dependency graph, SAPS algorithm selects a layer to maximize QoS. We aim at minimizing distortion in selecting layers. In inter-frame coded video streaming, minimizing packet loss does not imply maximizing QoS. In determining the packet transmission schedule, we exploit the fact that significance of each packet loss is different dependent upon its frame type and the position within group of picture(GOP). In SAPS algorithm, each packet is assigned a weight called QoS Impact Factor Transmission schedule is derived based upon weighted smoothing. In simulation experiment, we observed that QOS actually improves when packet loss becomes worse. The simulation results show that the SAPS not only maximizes user perceivable QoS but also minimizes resource requirements.

Development of Decision Model and Management System to minimize Pavement Utility Cut for Road Facility (도로시설 재굴착 방지를 위한 의사결정모델 및 관리시스템 개발)

  • Cho, Jin-Young;Jang, Oun-Sung;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.164-171
    • /
    • 2013
  • In urban planning, road facility is used not only for the transportation purpose but also for the utility line space purpose such as electrical, gas, tele communication, heating, water, sewer, and so on. However, since these utilities are built by many different groups, it becomes very difficult to communicate each other. Delay in one party can cause another party's schedule delay but they don't commuicate often. Also, some delay in utility work can cause frequent pavement cut. And, this will impact on construction cost, schedule delay, low quality, user complain and cost. This study developed spatiotemporal decision model to prevent prequent utility cut for mega project such as new urban development project. In addition, this study developed utility cut management system to manage utility cut schedule under pavement. Finally, developed system was applied to new urban development project and verified there effectiveness.

Job Assignment Simulation of Ship Hull Production Design in Consideration of Mid-Term Schedule (중일정계획을 고려한 선체 생산설계 작업할당 시뮬레이션)

  • Son, Myeong-Jo;Kim, Tae-Wan
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.50 no.5
    • /
    • pp.334-342
    • /
    • 2013
  • In this paper, we analyze the procedure of the design manager for the enhancement of the hull production design process by use of the simulation method. Normally, design manager assigns design jobs according to various methods and estimates the corresponding results. When the construction drawing which is the output of the detail design where a design is dealt by zones, the design manager identifies blocks and analyzes their work difficulties, and assigns jobs to design engineers who are different in capabilities. These processes including the design engineer who can be modeled with man-hours evaluation model are represented in detail as a simulation model. As the high-level modeling for the discrete-event system, we use Event Graph model. And we implemented the simulation using Simkit which is open simulation engine for the discrete-event system. We made the simulation scenario to be written by a user in the scenario generator which is separated from the simulation model, and made the simulation result to be visualized in the form of Gantt chart in a Web. In the scenario of the irregular issuance for various construction drawings which contain different numbers of blocks, we performed the Monte-Carlo simulation according to various assignment methods to find the assignment result that satisfies the mid-term schedule.

A Case Study on Application of Dispatching Rule-Based Advanced Planning and Scheduling (APS) System (디스패칭 룰 기반의 Advanced Planning and Scheduling (APS) 시스템 활용 사례연구)

  • Lee, Jae-yong;Shin, Moonsoo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.3
    • /
    • pp.78-86
    • /
    • 2015
  • Up-to-date business environment for manufacturers is very complex and rapidly changing. In other words, companies are facing a variety of changes, such as diversifying customer requirements, shortening product life cycles, and switching to small quantity batch production. In this situation, the companies are introducing the concept of JIT (just-in-time) to solve the problem of on-time production and on-time delivery for survival. Though many companies have introduced ERP (enterprise resource planning) systems and MRP (material requirement planning) systems, the performance of these systems seems to fall short of expectations. In this paper, the case study on introducing an APS (advanced planning and scheduling) system based on dispatching rules to a machining company and on finding a method to establish an efficient production schedule is presented. The case company has trouble creating an effective production plan and schedule, even though it is equipped with an MRP-based ERP system. The APS system is applied to CNC (computer numerical control) machines, which are key machines of the case company. The overall progress of this research is as follows. First, we collect and analyze the master data on individual products and processes of the case company in order to build a production scheduling model. Second, we perform a pre-allocation simulation based on dispatching rules in order to calculate the priority of each order. Third, we perform a set of production simulations applying the priority value in order to evaluate production lead time and tardiness of pre-defined dispatching rules. Finally, we select the optimal dispatching rule suitable for work situation of the case company. As a result, an improved production schedule leads to an increase in production and reduced production lead time.

Development of Shipbuilding Execution Scheduling Support System using Mobile Device : A Case Study for a Panel Block Assembly Shop (모바일 기기를 활용한 조선 생산 실행계획 지원 시스템 개발 : 판넬라인 개발 사례를 중심으로)

  • Hwang, Inhyuck;Song, Jungkyu;Back, Myunggi;Ryu, Cheolho;Lee, Kwangkook;Shin, Jong Gye
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.50 no.4
    • /
    • pp.262-271
    • /
    • 2013
  • Owing to the development of mobile communication technology during the last a few years, the number of users of mobile devices such as the smartphone and the tablet PC has increased rapidly. As a result, the range of applications of the mobile devices has also been greatly expanded from an application for the convenience of daily life to an application for assisting the operations of industrial fields. Especially, portability of mobile devices can provide great help in collecting and using information on the production site. In shipbuilding production processes, it is difficult to collect changes of circumstance in the field and reflect the changes to schedule due to the low production automation rate and frequent changes in schedule. In this study, we propose a system to solve the problems of shipbuilding production processes such as the ones described above by using mobile devices. First of all, we organize the production information and production processes of the panel line through the analysis of shipyard panel line operations. Next, we have developed a system that can support the production execution plan of the panel line and monitor the production processes in the field. The system was developed utilizing application virtualization to allow access to the system from various platforms of mobile devices and PC's. The system was implemented using ooCBD methodology considering the future expansion of the system and ease of maintenance.

Development of an Analysis Program for Small Horizontal Wind Turbines Considering Side Furling and Optimal Torque Scheduling (사이드 펄링과 최적 토크스케줄을 고려한 소형 풍력터빈 해석 프로그램 개발)

  • Jang, Hyeon-Mu;Kim, Dong-Myeong;Paek, In-Su
    • Journal of the Korean Solar Energy Society
    • /
    • v.38 no.2
    • /
    • pp.15-31
    • /
    • 2018
  • A program to design a small capacity wind turbine blade is proposed in this study. The program is based on a matlab GUI environment and designed to perform blade design based on the blade element momentum theory. The program is different from other simulation tools available in a point that it can analyze the side-furling power regulation mechanism and also has an algorithm to find out optimal torque schedule above the rated wind speed region. The side-furling power regulation is used for small-capacity horizontal axis wind turbines because they cannot use active pitch control due to high cost which is commonly used for large-capacity wind turbine. Also, the torque schedule above the rated wind speed region should be different from that of the large capacity wind turbines because active pitching is not used. The program developed in this study was validated with the results with FAST which is the only program that can analyze the performance of side-furled wind turbines. For the validation a commercial 10 kW wind turbine data which is available in the literature was used. From the validation, it was found that the performance prediction from the proposed simple program is close to those from FAST. It was also found that the optimal torque scheduling from the proposed program was found to increase the turbine power substantially. Further experimental validation will be performed as a future work.