• Title/Summary/Keyword: work schedule

Search Result 586, Processing Time 0.026 seconds

Development and Verification of Operation Management Tool for KASS

  • Minhyuk Son;ByungSeok Lee
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.12 no.4
    • /
    • pp.431-436
    • /
    • 2023
  • In order to provide continuous Korea Augmentation Satellite System (KASS) services, the operation organization should continuously and systematically perform operations, maintenance, and technical activities. All subsystems of KASS, all Line Replacement Units (LRUs), and Software Replacement Units (SWRUs) should be operated and maintained continuously. In order to effectively manage these activities, it is necessary to develop an Operation Management Tool (OMT). For this purpose, operation management, operation organization, and operation activities were defined. The defined requirements were divided into general, function, interface, and database for OMT development, and functions and decision-making procedures consisting of site/asset/trouble/work order/schedule management were designed. The OMT developed by reflecting the site and asset information as well as the design content met predefined requirements. The OMT will be actively used in actual KASS operation and will evolve by continuously reflecting the additional requirements of operators. Through this tool, KASS will support continuous service provision.

The Forecasting Model of the Repair Cost in Apartment Housing - Focused roof water proofing and Elevator work - (공동주택 공종별 수선비용 예측모델 연구 - 옥상방수 공사와 승강기 공사를 중심으로 -)

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.15 no.6
    • /
    • pp.63-68
    • /
    • 2015
  • Purpose: Most if buildings need various repair works for preventing or delaying the deterioration which gives rise to affect the living condition or function after constructed. Therefore, a long-term repair schedule should be planned and a repair cost is required. In this paper, it aimed at providing the statistical forecast model for a repair cost in roof water-proofing work and elevator work using statistical approach with three variables such as number of household, management area and a elapsed year. Data are collected in apartment housings which are located in Seoul area and conducted with interview and questionnaire sheet. Each analyzed work is divided into a partly work and fully work. Results of this study are shown that, first, the regression model takes a multiplying type like a Cobb-Douglas function and is changed into the log-linear type to include the three variable simultaneously. Second, the goodness-of-fit of the repair cost forecasting model has a good statistics in determinant's coefficient and Dubin-Watson value. Third, the management area is stronger factor than other the number of household and an elapsed year in roof water-proofing work and elevator work.

Feasibility Study on the Duration of Shiwha Techno-Valley through Simulation (시뮬레이션을 이용한 시화 테크노 벨리 공기 적정성 검토연구)

  • Kim Kyong-Ju;Kim Byeong-Soo;Chun Jin-Ku;Lee Jeong-Hun;Yun Won-Gun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.495-499
    • /
    • 2003
  • As an alternative to overcome the limitations of current popular schedule system such as Bar Chart, PERT, CPM in proving the feasibility of a given project schedule and duration, this research applies simulation to the 'Shiwha Techno-Valley project, and then reviews its usability in time management. Shiwha-Techno-Valley is a gigantic project requiring large number of equipment and resulting in traffic congestion. In particular, project site is located near the Shiwha industrial complex and Daeboo-Do tourist place. Therefore, current traffic needs should not be ignored. This research evaluates whether the project can be finished in a given time even if construction equipment increase in addition to the current traffic. Through the analysis of the simulation output, the research identifies the optimal resource input and the needs on alternative schedule for the project.

  • PDF

Construction Cost-Schedule Integration Management Methodolgy by using Progress Integration Unit (성과측정유닛을 활용한 건설 비용 - 일정 통합관리 방안)

  • Kang, Namhee;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.42-51
    • /
    • 2017
  • Measuring and evaluating project progress and performance are the key element of the construction project success. Construction progress is typically measured quantitatively by evaluating cost and time allocated to the project deliverable, and thus properly integrating cost and time is essential to the project management. This research was performed to propose an alternative methodology to integrate the cost and time and provide a framework for the progress measurement. The researchers developed a typical work process for the cost and schedule planning and also developed an alternative cost-schedule integration method by using progress integration units (PIU). A discipline of a construction phase served as a common level for WBS and CBS integration, so the PIUs'were defined under discipline. A case study project was selected to validate the developed methodology. The result showed the proposed method improved efficiency of cost and time integration. The result also showed the excluding material for the progress measurement purpose significantly reduced the bias of progress measurement.

Applying tools of Six Sigma and PSP for definition and schedule management of process (프로세스 정의 및 일정 관리를 위한 6시그마와 PSP도구의 적용 방안)

  • Choi, Seung-Yong;Kim, Jeong-Ah
    • Journal of KIISE:Software and Applications
    • /
    • v.33 no.11
    • /
    • pp.923-935
    • /
    • 2006
  • As the knowledge-based society has been constructed, the size of work process that has to be done grows bigger and the amount of the information that has to be analyzed increases. So each company is trying to construct more conformable process models in business model. In order to support the process construction of companies practically, in this paper tools of Six Sigma is applied to process definition and tools of PSP is applied schedule management. And to use the proposed tools efficiently, the procedure of process definition and schedule management are suggested. The goal of the proposed method is to achieve the process aim within the Time-To-Market by applying the process management of organizations and persons. And the goal of individuals is to improve personal process with the collected data.

The Efficacy of Visual Activity Schedule Intervention in Reducing Problem Behaviors in Children With Attention-Deficit/Hyperactivity Disorder Between the Age of 5 and 12 Years: A Systematic Review

  • Thomas, Naveena;Karuppali, Sudhin
    • Journal of the Korean Academy of Child and Adolescent Psychiatry
    • /
    • v.33 no.1
    • /
    • pp.2-15
    • /
    • 2022
  • Objectives: Children with attention-deficit/hyperactivity disorder (ADHD) tend to be noisy and violate rules with their disruptive behaviors, resulting in greater difficulties with off-task behaviors and being at risk for social refusal. The visual activity schedule (VAS) intervention program is a frequently used method to teach multiple skills involving on-task, use of schedules, transition behaviors, social initiation, independent play skills, classroom skills, and academic skills. The current systematic review aimed to examine the efficacy of using VAS intervention in reducing problem behaviors in children with ADHD between 5 and 12 years of age. Methods: Systematic searches were conducted using two electronic databases (PubMed and Scopus) to identify relevant studies published in English between 2010 and 2020. Four studies met the inclusion criteria: two studies examined the effect of schedule-based tasks and the use of an iPad on classroom skills, while the other two examined randomized clinical trials (RCTs) of psychosocial treatment for ADHD inattentive type and a cross-sectional study examined the impact of the group size on task behavior and work productivity in children with ADHD. Results: The findings indicate that the interventions used in all four studies could lead to increased satisfaction among participants and parents, as well as a reduction in problem behavior. In terms of the research indicators, the RCT had low quality, while the others were of high quality. Conclusion: A larger number of studies and the ADHD clinical population would help to increase the generalizability of future reviews of treatments in this context.

Risk Factors for Breast Cancer, Including Occupational Exposures

  • Weiderpass, Elisabete;Meo, Margrethe;Vainio, Harri
    • Safety and Health at Work
    • /
    • v.2 no.1
    • /
    • pp.1-8
    • /
    • 2011
  • The knowledge on the etiology of breast cancer has advanced substantially in recent years, and several etiological factors are now firmly established. However, very few new discoveries have been made in relation to occupational risk factors. The International Agency for Research on Cancer has evaluated over 900 different exposures or agents to-date to determine whether they are carcinogenic to humans. These evaluations are published as a series of Monographs (www.iarc.fr). For breast cancer the following substances have been classified as "carcinogenic to humans" (Group 1): alcoholic beverages, exposure to diethylstilbestrol, estrogen-progestogen contraceptives, estrogen-progestogen hormone replacement therapy and exposure to X-radiation and gamma-radiation (in special populations such as atomic bomb survivors, medical patients, and in-utero exposure). Ethylene oxide is also classified as a Group 1 carcinogen, although the evidence for carcinogenicity in epidemiologic studies, and specifically for the human breast, is limited. The classification "probably carcinogenic to humans" (Group 2A) includes estrogen hormone replacement therapy, tobacco smoking, and shift work involving circadian disruption, including work as a flight attendant. If the association between shift work and breast cancer, the most common female cancer, is confirmed, shift work could become the leading cause of occupational cancer in women.

Estimating Relative Risk Level of Construction Work (건설공사 상대적 위험도 산정)

  • Son, Ki-Sang;Yang, Hak-Soo;Gal, Won-Mo
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.5 s.77
    • /
    • pp.53-59
    • /
    • 2006
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. The domestic system of standard safety management costs is not considered in the foreign country, while only related subjective items have been investigated and evaluated for this study. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basial data and material to be systemized.

A Study on Effective Management Plans for Work Schedule of Cooks in Contracted Foodservice Companies (위탁급식업체에서의 조리사 근무 스케줄에 대한 효율적 관리방안에 관한 연구 -'K' 업장의 사례를 중심으로-)

  • Kim, Ha-Yoon;Van, Ju-Won;Cheon, Hee-Sook
    • Culinary science and hospitality research
    • /
    • v.12 no.1 s.28
    • /
    • pp.188-202
    • /
    • 2006
  • With large corporations entering into the foodservice market, competitions among those foodservice providers became intense, leading to differentiated quality services in terms of portioning out the meal, its portion and waiting time, not to mention food quality. The purpose of providing foodservice is to satisfy its customers, to secure optimum level of profits, and attain continuous quality improvement. To have such purpose attained, all other factors affecting the foodservice should be allowed to play a role. The intensity of the work performed by the employees should be maintained at a steady level and systematically controlled. 'Service First’ principles upholding that customer satisfaction comes from good service should be applied at all times; customer satisfaction comes from the satisfaction of the employees. Customer satisfaction through good service will contribute to an increase in revenue which we get by subtracting operating expenses from the total sales, as it will lead to concluding a long-term supply contract or renewing the existing contract. To keep the operating expenses to the minimum level, it is important to effectively perform the cost control. Since personnel expenses occupy a large portion of the operating expenses, it is imperative to effectively control the labor costs. For this reason, this study will present an effective program for disposition of men with a large organization being centered around, where the number of people served at the mess hall varies greatly depending on a day of the week and a mealtime of the day.

  • PDF

Analysis of Excavation Speed and Direct Construction Cost Based on the Operating Productivities of TBM Method Site (TBM 굴착 공법 적용 현장의 생산성 분석을 통한 암질별 굴진속도 및 직접공사비 분석)

  • Song, Young Sun;Park, Hong Tae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.6D
    • /
    • pp.637-643
    • /
    • 2012
  • This research collected work drilling report of TBM method site developed by WRITH company to TBM equipment company in Germany and analyzed work operating productivity. Based Oil the data analyzed TBM operating productivity, This research derived and presented excavation speed (m/day) by TBM diameter (3.0m, 3.5m, 3.8m) and rock. Also, based on the excavation speed (m/day) by TBM diameter, This research estimated a day direct construction cost and total direct construction costs by applying a direct construction cost which spent on per 1m. When we perform a similar geological construction in the future, excavation speed and direct construction cost which were derived by TBM diameter and rock is thinking the effective utilization data to estimate construction cost and plan schedule management before the start of construction.