• Title/Summary/Keyword: work breakdown structure

Search Result 168, Processing Time 0.032 seconds

A Study on Integrated Information System for Marine Leisure Industry (해양레저 산업의 통합 정보 시스템 구축에 관한 연구)

  • Kim, Y.S.;Kim, D.J.
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.16 no.1
    • /
    • pp.17-24
    • /
    • 2013
  • In order to have market competitiveness in local and global areas, Domestic Marine Leisure Industry business, which is a latecomer in the Marine Leisure industry, should retain a strong market adaptability by reducing time and cost that are required for work of planning, designing, and preparation for product development. To meet above requirements, it is essential that integrated system control extensive marine leisure industry. After ensuring integrated information by figuring out the systematic link between related-industries, the core of this research is to secure information classifications that are not just in the flow of simple serial order, but in that of integration and object-oriented information classifications. For this end, we examine other similar cases in industries using real information system applied to industrial production and Product Lifecycle Management (PLM), Product Data Management (PDM), Digital Manufacturing (DM) and applying the same methodology to review practical application in order to construct the information system, and Work Breakdown Structure (WBS), compared with the case studies. Through this basic task for the marine leisure industry classification system configuration (Work Breakdown Structure, WBS) and utilizing information of driving real companies of marine leisure industry, a unique area of MLWBS (Marine Leisure Work Breakdown Structure, MLWBS) is configured. This Marine Leisure Work Breakdown Structure can be used in various areas of applications like products, design information, engineering, production, purchasing, sales, marketing, AS, utilizing various forms of customer support.

Analysis on the Problems of Construction Temporary Work through Review on Technology System

  • Park, Junmo;Kim, Okkyue;Kim, Jinlee;Lim, NamGi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.716-717
    • /
    • 2015
  • A construction temporary work is main process and importance trade section. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study reviews literature researches and can verify that changes to a comprehensive technology system for construction site. In addition, it suggests a breakdown structure of new standards for temporary construction technology based on views of construction site managers. Meanwhile, temporary construction technology in Korea has changed with a specification of construction temporary work which had been revised in 2014. However, the revision is merely dividing the design and building off of construction temporary technology. It is lacking in many ways to change this in a new standard system for temporary construction technology. Henceforth, it needs to develop a standard system for temporary construction technology and a professional system that is appropriate for different purposes by detail trade sections.

  • PDF

Breakdown Structures for Physical Asset Management in Built Environment (건설 산업의 시설물 자산관리를 위한 분류체계 역량)

  • Gebremichael, Dagem Derese;Moon, Kyeongpil;Lee, Yunsub;Jung, Youngsoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.305-306
    • /
    • 2021
  • Breakdown structure (BS) is a tool used to allocate information packages for various management functions and drive computerized information systems. Although several BS exists, work breakdown structures (WBS) and cost breakdown structures (CBS) are the most widely studied and used in previous literature. Nevertheless, heterogeneity of BS and respective management capabilities in current practices are not adequately addressed. In this context, this paper compared the management capabilities of various BS in both building and plant industries through systematic literature. Management requirements and applications scope, in terms of life cycle and stakeholder, were analyzed, respectively. Finally, finding and lesson-learned are outlined.

  • PDF

Simulation Study on the Breakdown Characteristics of InGaAs/InP Composite Channel MHEMTs with an InP-Etchstop Layer (InP 식각정지층을 갖는 MHEMT 소자의 InGaAs/InP 복합 채널 항복 특성 시뮬레이션)

  • Son, Myung Sik
    • Journal of the Semiconductor & Display Technology
    • /
    • v.12 no.4
    • /
    • pp.21-25
    • /
    • 2013
  • This paper is for enhancing the breakdown voltage of MHEMTs with an InP-etchstop layer. The fully removed recess structure in the drain side of MHEMT shows that the breakdown voltage enhances from 2 V to 4 V in the previous work. This is because the surface effect at the drain side decreases the channel current and the impact ionization in the channel at high drain voltage. In order to increase the breakdown voltage at the same asymmetric gate-recess structure, the InGaAs channel structure is replaced with the InGaAs/InP composite channel in the simulation. The simulation results with InGaAs/InP channel show that the breakdown voltage increases to 6V in the MHEMT as the current decreases. In this paper, the simulation results for the InGaAs/InP channel are shown and analyzed for the InGaAs/InP composite channel in the MHEMT.

Manufacturing Process of the Ti-6Al-4V Billet by the Open-die Forging (자유형 단조 공정에 의한 Ti-6Al-4V 빌렛 제조기술)

  • Kim, K.J.;Choi, S.S.;Hwang, C.Y.;Kim, J.S.;Yeom, J.T.;Lee, J.S.
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2006.05a
    • /
    • pp.377-380
    • /
    • 2006
  • Manufacturing process of Ti-6Al-4V alloy billet was investigated with FEM simulation and experimental analysis. Before the breakdown process of Ti-6Al-4V alloy ingot, FEM simulation for the breakdown processes of Ti-6Al-4V alloy ingot was used to calculate the forging load and state variables such as strain, strain rate and temperature. In order to breakdown the ingot structure and make an equiaxed structure billet, two different processes were employed for a VAR/VAR processed Ti-6Al-4V alloy ingot. Firstly, the ingot was cogged in single-phase $\beta$ field at the temperature of $1,100^{\circ}C$. In the process, the coarse and inhomogeneous structure developed by the double melting process was broken down. The second breakdown was performed by upsetting and cogging processes in $\alpha+\beta$ phase field to obtain the microstructure of fine equixed $\alpha$ structure in the matrix of transformed $\beta$. Finally, the mechanical properties of Ti-6Al-4V alloy billet made in this work were compared with those of other billet and ring product.

  • PDF

Apartment house project cost schedule for integrated management BIM-based BoQ application plan (공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안)

  • Zheng, Lianyi;Kim, Woong-Gi;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.11 no.2
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.

Project Management Information System Using Work Breakdown Structure (업무분할체계를 이용한 사업관리정보시스템)

  • 이정구
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 1997.11a
    • /
    • pp.303-320
    • /
    • 1997
  • In A institute, project managers present quarterly project performance report according to institute's law. In quarterly project performance report, progress of project performance and budget expended should be written. Progress of project performance and progress of budget expended are key management factors in A institute. Because financial database system Is already constructed, progress of budget expended is got from information system. But the progress of project performance that project manager estimate subjectively can not be judged of its correctness because there is not project management information system that is able to calculate the progress of project performance systematically. In this study, we present the project management system assign all activities to every project participator according to their work share rate using WBS(Work Breakdown Structure) and calculate the progress of project performance systematically Also we construct project management information system for above project management system implementing.

  • PDF

Reliability Design Using FMEA for Pressure Control Regulator of Aircraft Fuel System (항공기용 연료계통 압력조절밸브의 FMEA를 적용한 신뢰성 설계)

  • Bae, Bo-Young;Lee, Jae-Woo;Byun, Yung-Hwan
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.17 no.1
    • /
    • pp.24-28
    • /
    • 2009
  • The reliability assessment is performed for Pressure Control Regulator of Aircraft Fuel System using reliability procedure which consists of the reliability analysis and the Failure Modes and Effects Analysis(FMEA). The target reliability as MTBF(Mean Time Between Failure) is set to 5000hr. During the reliability analysis process, the system is categorized by Work Breakdown Structure(WBS) up to level 3, and a reliability structure is defined by schematics of the system. Since the components and parts that have been collected through EPRD/NPRD. The predicted reliability to meet mission requirements and operating conditions is estimated as 4375.9hr. To accomplish the target reliability, the components and parts with high RPN have been identified and changed by analyzing the potential failure modes and effects. By changing the configuration design of components and parts with high-risk, the design is satisfied target reliability.

  • PDF

A study on Deployment of the Optimized WBS and Effective Small and Medium Enterprise Informatization System using Standardized PSDM (표준화된 PSDM을 사용한 최적의 WBS 및 효과적인 중소기업 정보화 시스템 구축에 관한 연구)

  • Yoon, KyungBae;Kwon, HeeChoul
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.14 no.6
    • /
    • pp.199-205
    • /
    • 2014
  • We would like to study and develop the optimized WBS(Work Breakdown Structure) considering project's range, schedule, cost and human resources management with defining phased work in main task and preceding and escorting relationships for effective small and medium enterprises' informatization through standardized PSDM(Production System Development Methodology). For more systemic and effective system built-up, it introduces production information with WBS study which is appropriate for the small and medium enterprises with setting up management items for enhancing system's reliability, quality, productivity, smooth communication among the participated enterprises such as the small and medium enterprises, IT enterprises, and supervision enterprises, and operational support including maintenance of the built system. This study is purpose of helping a lot of the small and medium enterprises and IT enterprises to build up the systems more effective and reliable within planned schedule using the standardized methodology.

The Development Method of IFC Extension Elements using Work Breakdown Structure in River Fields (작업분류체계를 활용한 하천분야 IFC 확장 개발방안)

  • Won, Jisun;Shin, Jaeyoung;Moon, Hyoun-Seok;Ju, Ki-Beom
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.4
    • /
    • pp.77-84
    • /
    • 2018
  • As the application of BIM (Building Information Modeling) to the civil sector has become practical, and mandatory for road projects, the standardization, development of systems, etc. for the application and operation of BIM are required. In particular, it is important to develop BIM data standards for producing, sharing and managing the lifecycle data of civil facilities because they are commonly national public facilities. The BIM data standards have been developed by utilizing or extending IFC (Industry Foundation Classes), which is an international standard, but schema extensions of river facilities has not been developed thus far. This study proposes an approach to an IFC extension for river facilities using the WBS (Work Breakdown Structure) as a fundamental study for IFC-based schema extension in the river field. For this purpose, the research was carried out as follows. First, the IFC extension development method was selected to represent the river facilities by analyzing the existing IFC structure and previous research cases for the IFC extension. Second, extended elements of the river facilities were identified through an analysis of the WBS and classified according to the high-level structure of the IFC schema. Third, the classified elements were arranged based on the IFC hierarchy and the IFC schema extension for river facilities was established. Based on the suggested extension method of IFC schema, this study developed the schema by defining the element components and parts of river facilities, such as distribution flow elements and deriving their detailed types and properties.