1 |
Lee, B.H., 2010, "Building and Applying Shipbuilding Ontology for BOM Data Interoperability in Heterogeneous Shipbuilding PLM Systems", Inha university.
|
2 |
Jung, Y.Y., 2005, "Plan implementation pitfalls lifecycle management system (PLM) to build an integrated data environment (IPDE)", Journal of the Society of Naval Architects of Korea Vol.42, No.6, pp.698-709.
DOI
ScienceOn
|
3 |
Lee, C.O., "Development of PLM (Product Lifecycle Management) for Conceptual Design stage in Shipbuilding", Inha university.
|
4 |
Lee, W.J., 2005, "A study of building model for integrated ERP and PLM System in manufacturing industries", Yunsei University.
|
5 |
No, S.D., 2006, "CAD digital and virtual production PLM", 시그마프레스.
|
6 |
Shin, J.G., 2004, "New wave of manufacturing technology", 디지털 매뉴팩처링.
|
7 |
Ikeda, Y., 2006, "PLM Strategy", 한스컨텐츠.
|
8 |
Hong, S.Y., 2009, "Next generation of project management using MS OFFICE PROJECT", 내하출판사.
|
9 |
산업원천 기술 개발 사업, 2011, "20ft-40ft Yacht engineering, integration management and key parts production technology development".
|
10 |
Ministry of Commerce, "Industry and Energy, 2003, Shipbuilding System Details Technology Roadmap".
|
11 |
Ship WEP Base, http://www.zohakuweb.com/zhw-e/.
|
12 |
Lee, J.G., 2002, "Shipbuilding technology information system specification, Korea Ocean Research Institute of Marine Systems".
|
13 |
Shin, S.O., 1996, "CALS for Defense IWSDB gucheuk Study", Journal of the Korea CALS/EC, Vol.1. pp. 93-115.
|
14 |
Lee, S.S., 2004, "Internet-based plan for the ship's support system development", Journal of the Korea CAD/CAM ,Vol.9, No.4, pp. 406-415.
|
15 |
CimDATA, 2008, "Product Lifecycle Management Definition".
|
16 |
Are, T. and Luis, G., 2002, "Internet based Collaboration, an Opportunity to Increase Efficiency in Shipbuilding", Proc. of 11th International Conference on Computer Applications in Shipbuilding, pp. 229-241.
|
17 |
Fernando, A., 2002, "Collaboration Engineering in shipbuilding", Proc. of 11th International Conference on Computer Applications in Shipbuilding, pp. 243-257.
|
18 |
Jim, R., 2002, "Electronic Collaboration in a shipbuilding Environment", Proc. of 11th International Conference on Computer Applications in Shipbuilding, pp. 213-227.
|
19 |
Yamato, H., 2003, "Shio Design, Production and Operation based on Information Technology Infrastructure", Proc. of the 8th International Marine Design Conference, pp. V1-V19.
|
20 |
Choi, D.K., 2010, "An Integrated data model for product planning and product life cycle under PLM (Product Lifecycle Management) system a case study", hanyang university.
|
21 |
Lee, S.S., 2005, "Concurrent engineering based integrated basic ship planning system using internet", busan university.
|
22 |
Lee, J.K., 2006, "PDM, PLM technology and digital virtual production for yacht industry", Journal of the Society of Naval Architects of Korea Vol.43, No.148, pp18-22.
|
23 |
Lee, J.B., 2009, "The structural design of enterprise BOM for effective management of outfitting BOM in shipbuilding", Inha university.
|
24 |
Hwang, I.D., 2010, "The research of procurement work in shipbuilding industry according to applied ERP system", dong-a university.
|
25 |
Kim, B.R., 2010, "Design and Implementation of Implementation of Modeling System for Shipbuilding Process", Seoul National University.
|
26 |
Kim, J.H., 2010, "Derivation of Task based BOM Data Relation Information for Extracting Data from Shipbuilding Integrater BOM for Design Purpose", Seoul National University.
|
27 |
Kim, D.S., 2010, "Integration of shop outfitting BOM with Lifecycle Stages", Inha university.
|
28 |
Lee, J.J., 2010, Data association between design stages for the BOM management of piping in ship design, Inha university.
|
29 |
Oh, D.K., 2008, "A Naval Ship product Model and its Management System Supporting Simulation-Based Acquisition for Naval Ships", Seoul National University.
|