• Title/Summary/Keyword: wind generation farm

Search Result 111, Processing Time 0.026 seconds

A Study on Estimation of Wind Power Generation using Weather Data in Jeju Island (기상관측자료를 이용한 제주도 풍력단지의 풍력발전량 예측에 관한 연구)

  • Ryu, Goo-Hyun;Kim, Ki-Su;Kim, Jae-Chul;Song, Kyung-Bin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.12
    • /
    • pp.2349-2353
    • /
    • 2009
  • Due to high oil price and global warming of the earth, investments for renewable energy have been increased a lot continuously. Specially, wind power has been received a great attention in the world. In order to construct a new wind farm, forecasting of wind power generation is essential for a feasibility test. This paper investigates wind velocity measurement data of Gosan weather station which located in Hankyung of Jeju island. This paper presents results of estimation of wind power generation using digital weather forecast provided from Korea meteorological administration, and the accuracy of the wind power forecasting by comparison between forecasted data and actual wind power data.

ARIMA Based Wind Speed Modeling for Wind Farm Reliability Analysis and Cost Estimation

  • Rajeevan, A.K.;Shouri, P.V;Nair, Usha
    • Journal of Electrical Engineering and Technology
    • /
    • v.11 no.4
    • /
    • pp.869-877
    • /
    • 2016
  • Necessity has compelled man to improve upon the art of tapping wind energy for power generation; an apt reliever of strain exerted on the non-renewable fossil fuel. The power generation in a Wind Farm (WF) depends on site and wind velocity which varies with time and season which in turn determine wind power modeling. It implies, the development of an accurate wind speed model to predict wind power fluctuations at a particular site is significant. In this paper, Box-Jenkins ARIMA (Auto Regressive Integrated Moving Average) time series model for wind speed is developed for a 99MW wind farm in the southern region of India. Because of the uncertainty in wind power developed, the economic viability and reliability of power generation is significant. Life Cycle Costing (LCC) method is used to determine the economic viability of WF generated power. Reliability models of WF are developed with the help of load curve of the utility grid and Capacity Outage Probability Table (COPT). ARIMA wind speed model is used for developing COPT. The values of annual reliability indices and variations of risk index of the WF with system peak load are calculated. Such reliability models of large WF can be used in generation system planning.

A Study on the Building of Tuna Farming in Floating Offshore Wind Power Generation Field at East Sea (동해 부유식 해상풍력발전단지 내 참다랑어 양식장 조성에 관한 연구)

  • Choi, Gun Hwan;Kim, Mi Jeong;Jang, Ki Ho;Kim, Hyo Seon
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.33 no.5
    • /
    • pp.179-186
    • /
    • 2021
  • We need measures that can come up with alternative about fishery living zone and enhance local acceptance for responding to the increase in the proportion of renewable energy production and construction of 12GW Offshore wind power according to Korea's Renewable Energy 3020 initiative and Korean-version New Deal. In this study, We suggest that differentiation plans of co-location model in connection with offshore wind power generation suitable for the East Sea. The East Sea is an optimal site for building of a floating offshore wind power generation(FOWPG) field. It is expected that economic effects like energy production, aquatic resource development and tourism industrialization by farming bluefin tuna which is high valued fish and suitable for offshore aquaculture on public waters in FOWPG field. And we can confirm that budget reduction, smart management by sharing operation management technology and increase in fishermen income.

Design and Implementation of EMS for Real-Time Power Generation Control of Wind Farm Based on Wake Effect Optimization (후류 영향 최적화 기반 실시간 풍력발전단지 발전 제어용 EMS의 설계 및 구현)

  • Kim, Joon-Hyoung;Sung, Ki-Won;Jung, Sung-Hwan
    • Journal of Korea Multimedia Society
    • /
    • v.25 no.8
    • /
    • pp.1097-1108
    • /
    • 2022
  • This paper aimed to design and implement an EMS for real-time power generation control based on wake effect optimization of wind farm, and then to test it in commercial operating wind farm. For real-time control, we proposed the wake band-based optimization and setting the wake effect distance limit, and when the wake effect distance limit was set to 7D in the actual wind farm layout, the calculation time was improved by about 93.94%. In addition, we designed and implemented the script-based EMS for flexible operation logic management in preparation for unexpected issues during testing, and it was installed and tested on a wind farm in commercial operation. However, three issues arose during the testing process. These are the communication interface problem of meteorological tower, the problem of an abnormal wake effect, and the problem of wind turbine yaw control. These issues were solved by modifying the operation logic using EMS's script editor, and the test was successfully completed in the wind farm in commercial operation.

Study of Wind Farm Model Configuration for WFMS simulation (WFMS 모의를 위한 풍력발전단지 모델 구성 연구)

  • Kim, Hyunwook;Jung, Seungmin;Hwang, Pyeong-Ik;Yoo, Yeuntae;Song, Sungyoon;Jang, Gilsoo
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.247-248
    • /
    • 2015
  • Wind turbines causes instabilities on the grid as their penetration increase. To mitigate harmful effects from wind turbines, transmission system operator(TSO) set up some requirements to obligate for wind generation operator for grid connection. So wind farm management system(WFMS) has important role to follow requirement from TSO, WFMS calculates available real power by considering wake effects, and dispatches real power order to each wind turbine in wind farm to optimize for decreasing load fatigue. To verify operation of WFMS, real-time simulator(RTS) is necessary. This paper deals with RTS configuration to verify WFMS operation. RTS includes wind farm model and power flow code. Normally, wind farm equivalent simple model makes wind turbines in wind farm to one wind turbine mode which cannot verify power flow in wind farm and WFMS operation. Thus, this paper makes wind farm model using simple wind turbine model with transfer function. Matlab is used for make power flow code and wind farm model to impose RTS and those model is certified by PSCAD/EMTDC.

  • PDF

Factors Influencing Critical Clearing Time in Network Connected to Wind Generation System (풍력발전시스템이 연계된 계통의 임계 제거시간에 미치는 요인)

  • Kim, Se-Ho;Kim, Ho-Chan;Yang, Ik-June
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.20 no.10
    • /
    • pp.41-46
    • /
    • 2006
  • Generation of electricity using wind power has received considerable attention worldwide in recent years. In order to investigate the impacts of the integration of wind farm into utilities' network, various studies have been investigated. One such impact is related to the Critical Clearing Time (CCT) of wind power generation system. This paper reports investigation into the factors that influence the transient behavior of the wind power generation system following network fault conditions. It is shown that CCT can be affected by various factors contributed by the network. Such factors include capacity of wind power, power factor, the length of the interfacing line, etc. This investigation is conducted on a simulated grid-connected wind farm using Digsilent Power Factory.

Voltage quality and Network Interconnection Standard Suitability in Jeju-Hangwon Wind Power Generation Farm (제주행원 풍력발전단지의 전압품질 및 연계기준 적합성 분석)

  • Kim, Se-Ho;Kim, Eel-Hwan;Huh, Jonhg-Chul
    • Journal of the Korean Solar Energy Society
    • /
    • v.26 no.2
    • /
    • pp.53-59
    • /
    • 2006
  • The number of wind generation installations are growing substantially in Jeju, Korea. Many of these installations are significant in size and directly connected to the distribution system. Utility grid interconnection standards for interconnecting non-utility distributed generation systems are essential to both power system company and generation company. These interconnection standards are important to utilities, customers, wind generation manufactures and nation. In this paper, it is investigated the voltage quality and the suitability of Jeju-Hangwon wind power generation farm by network interconnection technology standard.

Hardware-in-the-loop Simulation Method for a Wind Farm Controller Using Real Time Digital Simulator

  • Kim, Gyeong-Hun;Kim, Jong-Yul;Jeon, Jin-Hong;Kim, Seul-Ki;Kim, Eung-Sang;Lee, Ju-Han;Park, Minwon;Yu, In-Keun
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.5
    • /
    • pp.1489-1494
    • /
    • 2014
  • A hardware-in-the-loop simulation (HILS) method for a wind farm controller using a real time digital simulator (RTDS) is presented, and performance of the wind farm controller is analyzed. A 100 MW wind farm which includes 5 MW wind power generation systems (WPGS) is modeled and analyzed in RSCAD/RTDS. The wind farm controller is implemented by using a computer, which is connected to the RTDS through transmission control protocol/internet protocol (TCP/IP). The HILS results show the active power and power factor of the wind farm, which are controlled by the wind farm controller. The proposed HILS method in this paper can be effectively utilized to validate and test a wind farm controller under the environment in practice without a real wind farm.

Modified Differential Protection for Transformers in Wind Farms

  • George, Sujo P.;Ashok, S
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.1
    • /
    • pp.78-88
    • /
    • 2018
  • The liberalization of electricity market and environmental concerns are the major driving forces for the development of Distributed Generation (DG). The mode of grid-connected wind power generation is becoming popular and has matured as a reliable DG technology. The voltage generated by the wind generator is stepped up to the higher voltage by the transformers before connecting to the grid. Operating algorithm of the differential relays for transformer protection used in the wind farms need to be modified to take care of the dynamic nature of fault current caused by the intermittent nature of the wind power. An algorithm for the differential relay is proposed in which dual slope characteristics are adjusted with varying fault level situation according to the wind generator in service as well as with the wind speed. A case study conducted for a typical wind farm shows that the proposed method avoids mal-operation of the differential relay in varying wind power conditions.