• Title/Summary/Keyword: wheel/rail force

Search Result 182, Processing Time 0.03 seconds

A model for investigating vehicle-bridge interaction under high moving speed

  • Liu, Hanyun;Yu, Zhiwu;Guo, Wei;Han, Yan
    • Structural Engineering and Mechanics
    • /
    • v.77 no.5
    • /
    • pp.627-635
    • /
    • 2021
  • The speed of rail vehicles become higher and higher over two decades, and China has unveiled a prototype high-speed train in October 2020 that has been able to reach 400 km/h. At such high speeds, wheel-rail force items that had previously been ignored in common computational model should be reevaluated and reconsidered. Aiming at this problem, a new model for investigating the vehicle-bridge interaction at high moving speed is proposed. Comparing with the common model, the new model was more accurate and applicable, because it additionally considers the second-order pseudo-inertia forces effect and its modeling equilibrium position was based on the initial deformed curve of bridge, which could include the influences of temperature, pre-camber, shrinkage and creep deformation, and pier uneven settlement, etc. Taking 5 km/h as the speed interval, the dynamic responses of the classical vehicle-bridge system in the speed range of 5 km/h to 400 km/h are studied. The results show that ignoring the second-order pseudo-inertia force will underestimate the dynamic response of vehicle-bridge system and make the high-speed railway bridge structure design unsafe.

Effect of Metal Removal and Traction Force on Contact Fatigue Life (견인력과 접촉표면 제거가 접촉피로수명에 미치는 영향)

  • Seo Jung-Won;Hur Hun-Mu;Choi Jae-Boong;Kim Young-Jin
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.29 no.10 s.241
    • /
    • pp.1384-1391
    • /
    • 2005
  • Damage often occurs on the surface of railway wheels due to wheel-rail contact fatigue. It should be removed before reaching wheel failure, because wheel failure can cause derailment with loss of life and property. The increase or decrease of the contact fatigue lift by the metal removal of the contact surface were investigated by many researchers, but they have not considered initial residual stress and traction force. The railway wheel has the initial residual stress formed during the manufacturing process, and the residual stress is changed by thermal stress induced by braking. The traction force and residual stress are operated on wheels of locomotive and electric motor vehicle. In this study, the effect of metal removal depth on the contact fatigue life for a railway wheel has been evaluated by applying lolling contact fatigue test. The effect of the traction force and metal removal on the contact fatigue life has been estimated by finite element analysis. It has been found that the initial residual stress determines the amount of metal removal depth if the traction coefficient is less than 0.15. If the traction coefficient is greater than 0.2, however, the amount of metal removal depth is independent on the intial residual stress.

Experimental Study to analyze Effect of Rail Corrugation Reduction according to Rail Grinding (레일연마에 따른 레일 파상마모 저감 효과 분석을 위한 실험적 연구)

  • Choi, Jung-Youl;Jeong, Cheon-Man;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.4
    • /
    • pp.801-806
    • /
    • 2021
  • Rail corrugation is continuously increasing due to the lack of maintenance regulations for the amount of rail irregularities. Rail corrugation is causing various problems, such as a decrease in ride comfort and an increase in the amount of track maintenance. In this paper, the effect of rail corrugation on the track force was analyzed by measuring the rail irregularities before and after rail grinding and the track measurements (dynamic wheel load, displacement, and acceleration) for the section where the rail corrugation occurred. In addition, it was experimentally proven that the rail grinding performed to reduce the corrugation of the rail was very effective in reducing the additional forces on the track.

Influence of Initial Clamping Force of Tension Clamp on Performance of Elastic Rail Fastening System (텐션클램프의 초기 체결력이 탄성레일체결장치의 성능에 미치는 영향)

  • Lee, Dong Wook;Choi, Jung Youl;Baik, Chan Ho;Park, Yong Gul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.1243-1251
    • /
    • 2013
  • The purpose of this study is to investigate the influence of initial clamping force of tension clamp on the performance of an elastic rail fastening system used in sharp curve track. In this study, the initial clamping force and the increasing lateral wheel loads were conducted in the analytical and experimental study, i.e., finite element analysis, laboratory and field test. Using the analytical and experimental results, the performance of the tension clamp was investigated. It was found that the stress of tension clamp depends on the initial clamping force. Therefore the initial clamping force appeared to directly affect the compression stress of the tension clamp. It was found that the compression stress of tension clamp was transferred to the tensile stress by applied the lateral wheel load in service sharp curve track. Further, it was concluded that the initial clamping force was applied on the strengthening force for the tension clamp and then the appropriate initial clamping force was important to ensure a stable performance and long term endurance of tension clamp.

Dynamic response characteristics of ballast track according to rail corrugation (레일의 단.장파장 결함에 따른 궤도의 동적응답 변화특성 분석)

  • Choi, Jin-Yu;Hwang, Man-Ho;Yang, Shin-Chu;Hwang, Sung-Ho
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1293-1298
    • /
    • 2006
  • A numerical analysis was performed to verify how much additional force is induced by short or long pitch rail corrugations in track. The rail corrugations assumed as sine wave having various pitches and depths. The variation of wheel force, displacement and acceleration of rail and sleeper was investigated. In the results, it was shown that each item of the investigation was increased as the pitches and depths become large. It is expected that the results of the parametric study can be used as a preliminary data for the determination of economical maintenance criteria for rail corrugation in the future

  • PDF

A Study on Derailment Possibility that can Analogize from Vibration and Displacement of Rolling Stocks (철도차량의 진동과 변위로부터 유추할 수 있는 탈선가능성에 관한 연구)

  • Hong, Yong-Ki;Ham, Young-Sam
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.743-748
    • /
    • 2007
  • The important factor to evaluate the running safety of a railway vehicle would be the interaction force between wheel and rail(derailment coefficient), for which is one of important factors to check the running safety of a railway vehicle that may cause a tragic accident. Especially, a newly developed vehicle that first runs commercially requires necessarily the measurement and evaluation of derailment coefficient for securing the safety of a vehicle while measuring the derailment coefficient in view of securing running safety could be the more important factor than any other factors. In this paper, examined possibility that can forecast derailment possibility to behavior of only vibration and displacement by measuring vibration acceleration and displacement in vehicles that travel actuality rail track, and compares with data of wheel load/lateral force result.

  • PDF

The Parametric Study Effecting on the Fatigue Life of Rail on High Speed Railway (고속철도 레일의 피로수명에 영향을 미치는 매개변수 연구)

  • Park, Yong-Gul;Kang, Yoon-Suk;Go, Dong-Chun;Sung, Deok-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.3
    • /
    • pp.396-404
    • /
    • 2009
  • With developing the next generation high speed railway, there need to be plans to make sure of running safety though researchs on the crack and break of rail by rolling contact fatigue. Therefore, this study performed the parametric analysis effecting on the fatigue life of rail using simplified equations. It analyzed the internal stress of rail according to the track quality, train velocity, wheel radius, track stiffness, sleeper space, wheel load. For the more, via the finite element method, it analyzed shear force on the rail head which could be changed by the early length of crack, angle of crack and temperature. As a result, this study continued the main parameter effecting on the fatigue life of rail.

The Development of Program for Time Domain Simulation of Railway Dynamics (철도차량 동역학의 시간영역 시뮬레이션 프로그램 개발)

  • No, Chang-Su
    • 한국기계연구소 소보
    • /
    • s.18
    • /
    • pp.87-97
    • /
    • 1988
  • The algorithm for relation of contact status, track shift, and contact force caused from wheel/rail contact geometry is presented. Grafting this algorithm into a algorithm of general program analyzing mechanical system, the program for time domain simulation of railway vehicle dynamics, called CASOTD, was developed. In addition, as applied example of CASOTD, the dynamic simulation of railway vehicle running on a rail joint and a irregularly alinemented rail is done in this paper.

  • PDF

Wheel-Railway Adhesion Characteristics Experiment Machine on Traction System (견인시스템에 대한 점착특성 시험장치)

  • 이사영;오봉환;이복구;김봉희;전지용;김길동;박현준
    • Proceedings of the KIPE Conference
    • /
    • 1999.07a
    • /
    • pp.130-133
    • /
    • 1999
  • It is one of the most effective methods for improving the performance of electric railway vehicles to make better the wheel-railway adhesion characteristics. The purpose of this paper is to develop the equivalent reduction machine to experiment on the adhesion system. The experiment system makes it possible to change the wheel-rail adhesion force with various adhesion parameters, and therewith to test the adhesion control system with the reduction machine in a laboratory.

  • PDF

Parameteric Analysis for Up-lifting force on Slab track of Bridge (교량상 slab궤도의 상향력 민감도분석)

  • Choi, Sung-Ki;Park, Dae-Geun;Han, Sang-Yoon;Kang, Young-Jong
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1188-1195
    • /
    • 2007
  • The vertical forces in rail fasteners at areas of bridge transitions near the embankment and on the pier will occur due to different deformations of adjoining bridges caused by the trainloads, the settlement of supports, and the temperature gradients. The up-lifting forces is not large problem in the blast track because the elasticity of blast and rail pad buffs up-lifting effect. But, it is likely to be difficult to ensure the serviceability of the railway and the safety of the fastener in the end in that concrete slab track consist of rail, fastener, and track in a single body, delivering directly the up-lifting force to the fastener if the deck is bended because of various load cases, such as the end rotation of the overhang due to the vertical load, the bending of pier due to acceleration/braking force and temperature deviation, the settlement of embankment and pier, the temperature deviation of up-down deck and front-back pier, and the rail deformation due to wheel loads. The analysis of the rail fastener is made to verify the superposed tension forces in the rail fastener due to various load cases, temperature gradients and settlement of supports. The potential critical fasteners with the highest uplift forces are the fastener adjacent to the civil joint. The main influence factors are the geometry of the bridge such as, the beneath length of overhang, relative position of bridge bearing and fastener, deflection of bridge and the vertical spring stiffness of the fastener.

  • PDF