• Title/Summary/Keyword: water level forecasting

Search Result 122, Processing Time 0.025 seconds

DEVELOPMENT OF A REAL-TIME FLOOD FORECASTING SYSTEM BY HYDRAULIC FLOOD ROUTING

  • Lee, Joo-Heon;Lee, Do-Hun;Jeong, Sang-Man;Lee, Eun-Tae
    • Water Engineering Research
    • /
    • v.2 no.2
    • /
    • pp.113-121
    • /
    • 2001
  • The objective of this study is to develop a prediction mode for a flood forecasting system in the downstream of the Nakdong river basin. Ranging from the gauging station at Jindong to the Nakdong estuary barrage, the hydraulic flood routing model(DWOPER) based on the Saint Venant equation was calibrated by comparing the calculated river stage with the observed river stages using four different flood events recorded. The upstream boundary condition was specified by the measured river stage data at Jindong station and the downstream boundary condition was given according to the tide level data observed at he Nakdong estuary barrage. The lateral inflow from tributaries were estimated by the rainfall-runoff model. In the calibration process, the optimum roughness coefficients for proper functions of channel reach and discharge were determined by minimizing the sum of the differences between the observed and the computed stage. In addition, the forecasting lead time on the basis of each gauging station was determined by a numerical simulation technique. Also, we suggested a model structure for a real-time flood forecasting system and tested it on the basis of past flood events. The testing results of the developed system showed close agreement between the forecasted and observed stages. Therefore, it is expected that the flood forecasting system we developed can improve the accuracy of flood forecasting on the Nakdong river.

  • PDF

Real-time Flood Stage Forecasting of Tributary Junctions in Namhan River (남한강 지류 합류부의 실시간 홍수위 예측)

  • Kim, Sang Ho;Hyun, Jin Sub;Kim, Ji-Sung;Jun, Kyung Soo
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.6
    • /
    • pp.561-572
    • /
    • 2014
  • The backwater effect at a tributary junction increases the risk of flood damage such as inundation and levee overflow. In particular, the rapid increase in water level may cause injury to persons. The purpose of this research is the development of the real-time flood forecasting technique as a part of the non-structural flood damage reduction measures. To this end, the factors causing a water level rising at a junction were examined, and the empirical formula for predicting flood level at a junction was developed using the calculated discharge and water level data from the well-constructed hydraulic model. The water level predictions show that average absolute error is about 0.2~0.3m with the maximum error of 1.0m and peak time can be captured prior to 0~5 hr. From the results of this study, the real-time flood forecasting system of a tributary junction can be easily constructed, and this system is expected to be utilized for reduction of flood inundation damage.

Optimal Gate Operation and Forecasting of Innundation Area in the Irrigation Reservoir (관개저수지의 최적수문조작과 침수구역 예측)

  • 문종필;엄민용;김태철
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1999.10c
    • /
    • pp.486-492
    • /
    • 1999
  • One of the purpose of the reservoir operation is minimizing theinnudation area in the downstream reaches during flood period.l To execute the gate operation properly , it requires lots of real-time data such as rainfall, reservoir level, and water level in the downstrea. Gate operation model was developed with the flood discharge obtained from real-time flood forecasting model and the criterion prepared from the past history of gate operation. Water level in the downstream would be increased by the releasing discharge from the spillway and the area of paddy land flooded in a certain detph and time would be estimated usnig GIS map. Gate operation model was applied to the Yedang reservoir, and the flooded area, depth and time in the paddy land was estimaged.

  • PDF

Flood Forecasting and Warning System using Real-Time Hydrologic Observed Data from the Jungnang Stream Basin (실시간 수문관측자료에 의한 돌발 홍수예경보 시스템 -중랑천 유역을 중심으로-)

  • Lee, Jong-Tae;Seo, Kyung-A;Hur, Sung-Chul
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.1
    • /
    • pp.51-65
    • /
    • 2010
  • We suggest a simple and practical flood forecasting and warning system, which can predict change in the water level of a river in a small to medium-size watershed where flash flooding occurs in a short time. We first choose the flood defense target points, through evaluation of the flood risk of dike overflow and lowland inundation. Using data on rainfall, and on the water levels at the observed and prediction points, we investigate the interrelations and derive a regression formula from which we can predict the flood level at the target points. We calculate flood water levels through a calibrated flood simulation model for various rainfall scenarios, to overcome the shortage of real water stage data, and these results as basic population data are used to derive a regression formula. The values calculated from the regression formula are modified by the weather condition factor, and the system can finally predict the flood stages at the target points for every leading time. We also investigate the applicability of the prediction procedure for real flood events of the Jungnang Stream basin, and find the forecasting values to have close agreement with the surveyed data. We therefore expect that this suggested warning scheme could contribute usefully to the setting up of a flood forecasting and warning system for a small to medium-size river basin.

Water Level Tracking System based on Morphology and Template Matching

  • Ansari, Israfil;Jeong, Yunju;Lee, Yeunghak;Shim, Jaechang
    • Journal of Korea Multimedia Society
    • /
    • v.21 no.12
    • /
    • pp.1431-1438
    • /
    • 2018
  • In this paper, we proposed a river water level detection and tracking of the river or dams based on image processing system. In past, most of the water level detection system used various water sensors. Those water sensors works perfectly but have many drawbacks such as high cost and harsh weather. Water level monitoring system helps in forecasting early river disasters and maintenance of the water body area. However, the early river disaster warning system introduces many conflicting requirements. Surveillance camera based water level detection system depends on either the area of interest from the water body or on optical flow algorithm. This proposed system is focused on water scaling area of a river or dam to detect water level. After the detection of scale area from water body, the proposed algorithm will immediately focus on the digits available on that area. Using the numbers on the scale, water level of the river is predicted. This proposed system is successfully tested on different water bodies to detect the water level area and predicted the water level.

Flood Forecasting for Pre-Release of Taech'ong Reservoir (대청댐 예비 방류를 위한 홍수 예보)

  • Lee, Jae-Hyeong;Sim, Myeong-Pil;Jeon, Il-Gwon
    • Water for future
    • /
    • v.26 no.2
    • /
    • pp.99-105
    • /
    • 1993
  • A practical flood forecasting model(FFM) is suggested. The output of the model is the results which the initial condition of meteorological parameters and soil moisture are projected on the future. The physically based station model for rainfall forecasting(RF) and the storage function model for runoff prediction(RP) are adopted respectively. Input variables for FFM are air temperature, pressure, and dew-point temperature at the ground level and the flow at the rising limb(FRL). The constant parameters for FFM are average of optimum values which the past storm events have. Also loss rate of rainfall can predicted by FRL.

  • PDF

Error Forecasting Using Linear Regression Model

  • Ler, Lian Guey;Kim, Byung-Sik;Choi, Gye-Woon;Kang, Byung-Hwa;Kwang, Jung-Jae
    • Journal of Wetlands Research
    • /
    • v.13 no.1
    • /
    • pp.13-23
    • /
    • 2011
  • In this study, Mike11 will be used as the numerical model where a data assimilation method will be applied to it. This paper aims to gain an insight and understanding of data assimilation in flood forecasting models. It will start with a general discussion of data assimilation, followed by a description of the methodology and discussion of the statistical error forecast model used, which in this case is the linear regression. This error forecast model is applied to the water level forecast simulated by MIKE11 to produced improved forecast and validated against real measurements. It is found that there exists a phase error in the improved forecasts. Hence, 2 general formula are used to account for this phase error and they have shown improvement to the accuracy of the forecasts, where one improved the immediate forecast of up to 5 hours while the other improved the estimation of the peak discharge.

Recurrent Neural Network with Multiple Hidden Layers for Water Level Forecasting near UNESCO World Heritage Site "Hahoe Village"

  • Oh, Sang-Hoon
    • International Journal of Contents
    • /
    • v.14 no.4
    • /
    • pp.57-64
    • /
    • 2018
  • Among many UNESCO world heritage sites in Korea, "Historic Village: Hahoe" is adjacent to Nakdong River and it is imperative to monitor the water level near the village in a bid to forecast floods and prevent disasters resulting from floods.. In this paper, we propose a recurrent neural network with multiple hidden layers to predict the water level near the village. For training purposes on the proposed model, we adopt the sixth-order error function to improve learning for rare events as well as to prevent overspecialization to abundant events. Multiple hidden layers with recurrent and crosstalk links are helpful in acquiring the time dynamics of the relationship between rainfalls and water levels. In addition, we chose hidden nodes with linear rectifier activation functions for training on multiple hidden layers. Through simulations, we verified that the proposed model precisely predicts the water level with high peaks during the rainy season and attains better performance than the conventional multi-layer perceptron.

A Development of Inflow Forecasting Models for Multi-Purpose Reservior (다목적 저수지 유입량의 예측모형)

  • Sim, Sun-Bo;Kim, Man-Sik;Han, Jae-Seok
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 1992.07a
    • /
    • pp.411-418
    • /
    • 1992
  • The purpose of this study is to develop dynamic-stochastic models that can forecast the inflow into reservoir during low/drought periods and flood periods. For the formulation of the models, the discrete transfer function is utilized to construct the deterministic characteristics, and the ARIMA model is utilized to construct the stochastic characteristics of residuals. The stochastic variations and structures of time series on hydrological data are examined by employing the auto/cross covariance function and auto/cross correlation function. Also, general modeling processes and forecasting method are used the model building methods of Box and Jenkins. For the verifications and applications of the developed models, the Chungju multi-purpose reservoir which is located in the South Han river systems is selected. Input data required are the current and past reservoir inflow and Yungchun water levels. In order to transform the water level at Yungchon into streamflows, the water level-streamflows rating curves at low/drought periods and flood periods are estimated. The models are calibrated with the flood periods of 1988 and 1989 and hourly data for 1990 flood are analyzed. Also, for the low/drought periods, daily data of 1988 and 1989 are calibrated, and daily data for 1989 are analyzed.

  • PDF

Development of Urban Flood Water Level Forecasting Model Using Regression Method (회귀기법을 이용한 도시홍수위 예측모형의 개발)

  • Jeong, Dong-Kug;Lee, Beum-Hee
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.2
    • /
    • pp.221-231
    • /
    • 2010
  • A regression water level forecasting model using data from stage and rainfall monitoring stations is developed to solve the difficulties which real-time forecasting models could not get the reliabilities by assuming future rainfall duration and intensity. The model could forecast future water levels of maximum 2 hours after using data from monitoring stations in Daejeon area. It shows stable forecasts by its maximum standard deviation is 5 cm, average standard deviations are 1~4 cm and most of coefficients of determination are larger than 0.95. It shows also more researches about the stationary of watershed which assumed in this regression method are necessary.