Background The chest wall defects can be caused by various reasons. In the case of malignant tumor resection of the chest wall, it is essential to reconstruct the chest wall to cover the vital tissue and restore the pulmonary function with prevention of paradoxical motion. With our experience, we analyzed and evaluated the results and complications of the chest wall reconstructions followed by malignant tumor resection. Methods From 2013 to 2022, we reviewed a medical record of patients who received chest reconstruction due to chest wall malignant tumor resection. The following data were retrieved: patients' demographic data, tumor type, type of operation, method of chest wall reconstruction of the soft and skeletal tissue and complications. Results There were seven males and six female patients. The causes of reconstruction were 12 primary tumors and one metastatic carcinoma. The pathological types were seven sarcomas, three invasive breast carcinoma, and three squamous cell carcinomas. The skeletal reconstruction was performed in six patients. The series of the flap were eight pedicled latissimus dorsi (LD) myocutaneous flaps, two pectoralis major myocutaneous flap, two vertical rectus abdominis myocutaneous free flap, and one LD free flap. Among all the cases, only one staged reconstruction and successful reconstruction without flail chest. Most of the complications were atelectasis. Conclusion In the case of accompanying multiple ribs and sternal defect, skeletal reconstruction would need skeletal reconstruction to prevent paradoxical chest wall motion. The flap for soft tissue defect be selected according to defect size and location of chest wall. With our experience, we recommend the reconstruction algorithm for chest wall defect due to malignant tumor resection.
Numerical analysis was carried out in order to simulate the development of the large deformation that took place on the reinforced earth wall, a part of the Tottori expressway planned to pass Hyogo, Japan. Since this reinforced earth wall had experienced unexpected deformation of the wall during construction, the wall was re-constructed twice. However, the wall deformation showed no sign to cease even at the final stage of the construction. Countermeasures to re-stabilize the wall were demanded. In part I of this paper, it was manifested that subsidence of a 3-meter weak soil due to seepage flow was responsible for the large deformation. A part of concrete panel wall was severely damaged due to extremely large pulling force of geotextile induced by the hammock state. As for the countermeasures, "grouting with slag system" was applied to fill voids of the backfill, and also to prevent further development of settlement in the weak soil layer. "Ground anchor" was also considered to achieve the prescribed factor of safety.
Crib wall system은 일반적으로 segmental crib type의 옹벽형식으로 stretcher라는 전 후면 가로보와 세로 방향으로 header라는 버팀보를 연속적으로 쌓아 올리는 공법이다. 이때, stretcher와 header로 구성된 골격 내부에는 흙으로 속채움을 하여 다져, 본 구조체가 일체거동이 가능한 강성체(rigid body)를 형성시킴으로써 배면의 토압에 대하여 저항하는 구조물이다. 따라서, 안정성 해석은 일반적으로 기존의 철근콘크리트 옹벽과 같이 전체 옹벽이 하나의 강성체로 작용한다고 가정하여 토압이론에 의하여 평가하고 있다. 그러나, 변형문제에 있어서 본 구조물은 단순히 하나의 구조체로 가정하여 해석하기가 곤란하다. 왜냐하면, stretcher와 header는 일반 보강토옹벽의 전면 벽체 부재와는 달리 뒷채움재 내에 어떠한 인장 보강재도 삽입되지 않기 때문에 독립된 변위거동을 나타낸다. 또한, 각각의 독립부재로 구성된 재료와 내부채움재의 힘과 변형은 3차원적으로 거동하며 수평토압에 의하여 복합적인 상호거동을 일으키기 때문이다. 따라서, 본 연구는 Crib wall system의 변위경향을 보다 엄밀하게 해석하기 위하여 Brandl(1985)의 full scale 시험 결과를 바탕으로 수치해석 모델을 제시하였다.
Due to the rapid process of industrialization the cities of Korea confront changes of climate, destructions of the habitate and decrease of the green. Recently Seoul and other local governments have implemented policies and projects to improve the environmental surroundings. In reality, however, those policies and projects face difficulties in the course of implementation. The fact that there are no concrete regulations and specific legal procedures turns out to be one of the main difficulties. The aim of this study is to present specific plans and methods of wall-planting and to provide basic guidelines for the future direction of wall-planting and offer ideas of facilitating wall-planting. This study is based on questionnaires from specialists of landscape architecture through individual interviews and/or e-mails. The questionnaire is consisted of following 4 sections. 1. Show the experts current regulations and/or legal procedures and ask them improvements and suggestions. 2. Ask them choose matters of the highest priority by using Ricardo's diagram method. 3. Ask them to make a graded list in terms of the location and method of wall-planting. 4. Study the maketability of the wall-planting products currently in circulation. The city of Seoul and the Ministry of Environment recommend that trellis and/or planting inducement structures be installed on the building wall by regulation. The specialists responded to the questionnaire advocate that green wall without trellis should be allowed as green zone. Therefore regulations concerning the wall-planting should be determined specifically according to the characteristics of individual plants and walls. It has been urged that legal aid and social support must be reinforced to establish rules dealing with wall-planting. The respondents also point out that significant cutting down of the tax is far more effective in accelerating the wall-green instead of administrative support. The highest priority in terms of planting has been given to sound-proof wall, retaining wall and building wall. Concerning the maketability of the wall-planting products, panel products are recommended for early-planting and building planting. It has been suggested that the research and study of new materials and species be done in advance.
Wall-following control problem for a mobile robot is to move it along a wall at a constant speed and keep a specified distance to the wall. This paper proposes wall-following controllers based on Lyapunov function candidate for a two-wheeled mobile robot (MR) to follow an unknown wall. The mobile robot is considered in terms of kinematic model in Cartesian coordinate system. Two wall-following feedback controllers are designed: full state feedback controller and observer-based controller. To design the former controller, the errors of distance and orientation of the mobile robot to the wall are defined, and the feedback controller based on Lyapunov function candidate is designed to guarantee that the errors converge to zero asymptotically. The latter controller is designed based on Busawon's observer as only the distance error is measured. Additionally, the simulation and experimental results are included to illustrate the effectiveness of the proposed controllers.
In shipbuling processes, a quay wall is a major resource for additional operations after an erection operation at dock. A quay wall is becoming a new bottleneck instead of docks, while ship types with long operation time at quay wall are increasing recently. We developed a quay wall scheduling algorithm for the quayside operations of ships in this paper. The objective function is to minimize the sum of not assigned days of ships which have to be assigned to any quay wall under limited numbers of quay walls. The scheduling algorithm is based on an assignment method to assign each ship to a quay wall among its alternative quay walls at the time of launching or moving to another quay wall. The scheduling algorithm is also using Tabu Search algorithm to optimize assignment sequence of ships. The experiment shows that the algorithms in this paper are effective to make schedule of the quayside operations of ships.
Segmental Retaining Wall(SRW) has been variously applying in Civil and Architecture construction. Recently, the application of environmental element in all type's structures came to essential requirement, and the construction cases of retaining wall using reinforced soil and block are more increased than the past. But, this trend more widely was spread environmental element as landscape work for the backside of reinforced retaining wall as well as block itself. New environmental block, Greenstone Block, developed to apply of this tendency. The retaining wall system using Greenstone can be environmental constructing at both block itself and backside of retaining wall. The material tests, the axial compressive strength test of block and bending test of fiber-pipe, exercised to design and construction of vertical SRW, which were satisfied NCMA standard. Through this procedure, Rewall (ver 1.0) was developed, which can be automation design of SRW including internal stability, external stability and local stability. And these can be considered setback of retaining wall, as well the examples of vertical retaining wall using block presented to satisfying the follows; strength of reinforced geotextile, height of retaining wall, surcharge, types of backfill and groundwater level etc. Many problems investigated on after or before of construction were due to local failure, insufficiency of bearing capacity and groundwater level. Especially, the local failure was many occurred to during compaction or after construction, and the cases of SRW construction is similar to the results of model test on vertical SRW.
In the present study, capability of improving the liquid atomization of a high-speed liquid jet by using wall impingement is explored, and its application to a jet engine atomize. is demonstrated. Water is injected from a thin nozzle. The liquid jet impinges on a wall positioned close to the nozzle exit, forming a liquid film. The liquid film velocity and the SMD were measured with PDA and LDSA, respectively. It was shown that the SMD of the droplets was determined by the liquid film velocity and impingement angle, regardless of the injection pressure or impingement wall diameter. When the liquid film velocity was smaller than 300m/s, a smaller SMD was obtained, compared with a simple free jet. This wall impingement technique was applied to a conventional air-blasting nozzle for jet engines. A real-size air-blasting burner was installed in a test rig in which three thin holes were made to accommodate liquid injection toward the intermediate ring, as an impingement wall. The air velocity was varied from 41 to 92m/s, and the liquid injection pressure was varied from 0.5 to 7.5 MPa. Combining wall impinging pressure atomization with gas-blasting produces remarkable improvement in atomization, which is contributed by the droplets produced in the pressure atomization mode. Comparison with the previous formulation for conventional gas-blasting atomization is also made, and the effectiveness of utilizing pressure atomization with wall impingement is shown.
Local deformations in back filling materials of two sands and one glass bead with different particle shapes behind a rigid retaining wall were studied. Two kinds of boundary conditions were compared: active wall translation and active rotation of the wall about its toe. Effect of the speed of active wall translation was also investigated. The digital image correlation method was used to analyze local deformation developments inside the materials. Test results showed that particle shape and density mainly influence the inclination angle and width of the shear band. The general shear band pattern is strongly dependent on the wall movement mode, while it was little influenced by particle shape. Within a limited range of wall speed in this study, shear band became wider and local deformation became larger with increase of wall speed.
A hybrid post and beam shear wall system with structural insulation panel (SIP) infill was developed as a part of a green home 'Han-green' project through post and beam construction for contemporary life style. This project is on-going at the Korea Forest Research Institute to develop a new building system which improves Korean traditional wet-type building system and stimulates industrialized wood construction practice with pre-cut system. Compared to the traditional wet-type infill wall components, the hybrid wall system has benefits, such as, higher structural capacity, better thermal insulation performance, and shorter construction term due to the dry-type construction. To build up the hybrid wall system, in previous, SIP infill wall components can be manufactured at factory, and then inserted and nailed with helically threaded nails into the post and beam members at site. Shear performance of the hybrid wall system was evaluated through horizontal shear tests. The SIP hybrid wall system showed higher maximum shear strength, initial stiffness, ductility, yield strength, specified strength, and the specified allowable strength than those of post and beam with light-frame wall system. In addition to this, the hybrid wall system can provide speedy construction and structural and functional advantages including energy efficiency in the building system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.