1 |
Ahn, N.-S., Kang, J.-Y., Hong, S.-I., Choi, H.-Y., and Park, S.-S. (2007), An Algorithm for the Quay Assignment Scheduling Problem in Shipbuilding Industry, Proceedings of 2007 KIIE Fall Conference.
|
2 |
Imai, A., Nishimura, E., and Papadimitriou, S. (2003), Berth Allocation with Service Priority, Transportation Research, Part B 37, 437-457.
DOI
|
3 |
Jung, I., Yeo, S., Wang, G., Han, K., and Lee, J. (2008), Generating Heuristic Rule for Efficient Quay Assignment of Ships. International Conferences on Computational Intelligence for Modeling, Control and Automation; Intelligent Agents, Web Technologies and Internet Commerce; and Innovation in Software Engineering, 726-731.
|
4 |
Ha, B.-H. and Kim, S.-S. (2012), A* Algorithm for Optimal Intra-bay Container Pre-marshalling Plan, Journal of the Korean Institute of Industrial Engineers, 38(2), 157-172.
과학기술학회마을
DOI
ScienceOn
|
5 |
Kim, K.-H. and Moon, K.-C. (2003), Berth Scheduling by Simulated Annealing, Transportation Research, Part B 37, 541-560.
DOI
|
6 |
Kim, Y.-M. (2009), An Optimization of Ship Building Mix under N Different Docks, IE Interfaces, 22(1), 38-43.
과학기술학회마을
|
7 |
Koh, S.-G., Jang, J.-H., Choi, D.-W., and Woo, S-B. (2011), Spatial Scheduling for Mega-block Assembly Yard in Shipbuilding Company, IE Interfaces, 24(1), 78-86.
과학기술학회마을
DOI
ScienceOn
|
8 |
Lee, D.-H. and Bae, H.-R. (2013), Analysis Framework using Process Mining for Block Movement Process in Shipyards, Journal of the Korean Institute of Industrial Engineers, 39(6), 577-586.
과학기술학회마을
DOI
|
9 |
Lee, S.-H., Kim, J.-O., and Moon, I.-K. (2011), Deployment Planning of Blocks from Storage Yards Using a Tabu Search Algorithm, Journal of the Korean Institute of Industrial Engineers, 37(3), 198-208.
과학기술학회마을
DOI
|
10 |
Lee, S.-W. (2011), A Genetic Algorithm for the Container Pick-Up Problem, IE Interfaces, 24(4), 362-372.
과학기술학회마을
DOI
|
11 |
Lim, A. (1998), The Berth Planning Problem, Operation Research Letters, 22, 105-110.
DOI
|
12 |
Moccia, L., Cordeau, J. F., Gaudioso, M., and Laporte, G. (2006), A Branch-and-Cut Algorithm for the Quay Crane Scheduling Problem in a Container Terminal, Naval Research Logistics, 53, 45-59.
DOI
|
13 |
Nishimura, E., Imai, A., and Papadimitriou, S. (2001), Berth Allocation Planning in the Public Berth System by Genetic Algorithms, European Journal of Operational Research, 131, 282-292.
DOI
|
14 |
Park, C.-G. and Seo, J.-Y. (2009), On the Assembly Block Storage Location Assignment Problem, IE Interfaces, 22(2), 116-125.
과학기술학회마을
|
15 |
Park, Y.-M. and Kim, K.-H. (2003), A Scheduling Method for Berth and Quay Cranes, OR Spectrum, 25, 1-23.
DOI
|