• Title/Summary/Keyword: wall construction

Search Result 1,862, Processing Time 0.028 seconds

A study on the characteristic and designing condition of Curtain wall (Curtain Wall의 특성 및 설계조건에 관한 연구)

  • Jeong, Eul-Gyu;Im, Chil-Sun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.3
    • /
    • pp.125-131
    • /
    • 2004
  • Nowadays, it seems we are in the high time of construction design because development of construction technology widen the option of construction exterior closing materials and deepen the high-tech construction method with all various materials. When we see the flow of construction market, the mainstream is the high-rise intelligent building, which makes the best use of the small midtown area efficently. Therefore, Alum curtain wall is becoming the main material of exterior construction, the concept of which is changing from just a simple window frame to an outer wall which has comprehensive function and capability. As we think of the importance of Curtain wall as a comprehensive outer wall, We should do thorough technical examination and verification at the stage of construction design and plan of carrying out construction.

Development of the construction specification framework for skyscraper outer wall cleaning robot (외벽청소로봇의 가이드레일 시공기준체계 구축에 관한 연구)

  • Park, Su-Yeul;Kim, Kyoon-Tai;Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.292-294
    • /
    • 2013
  • When the number of skyscrapers are increased in the domestic, it has increased the need of the outer wall cleaning robot. However, it does not exist the construction specification of the outer wall cleaning robot in the domestic. it is difficult to apply in the domestic that the outer wall cleaning robot. For this reason, it raised the need of the construction specification. And it is urgent that the construction specification of the outer wall cleaning robot is needed to develop in the domestic. Therefore, this study aims to propose the construction specification framework of the outer wall cleaning robot. In the future, this study will be based on the development of the construction specification on the outer wall cleaning robot.

  • PDF

STUDY OF NEW CAST-IN-PLACE MORTAR WALL FOR HOUSE CONSTRUCTION COMPARED TO BRICK AND MORTAR-BLOCK SYSTEM (A SIMULATION IN DIFFERENT AREAS)

  • Arief Setiawan Budi Nugroho;Shin-ei Takano
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.196-202
    • /
    • 2009
  • Study from Yogyakarta earthquake reconstruction program, cast-in-place wall using fix-size formwork system (Old-CIP) has offered a good alternative for house construction. A simulation has also confirmed that this system using mortar as the main material can provide cheapest cost and lowest total man power compared to conventional wall construction technique: brick or mortar-block wall. This paper presents the new wall construction technique: full size cast-in-place wall (New-CIP). The detail of how this new technique implemented is described. In addition, considering that material and labor cost in one area is different to others, cost analysis for different resources prices and wages of three cities are taken into a simulation. The analysis is aimed to distinguish the implementation feasibility of New-CIP system compared to the four common wall systems. Finally, its implementation resistance is also discussed.

  • PDF

Post Evaluation on the Constructibility of the Lightweight Wall in Long Life Housing through Interview Survey (설문조사를 통한 장수명주택의 경량벽체 시공성 사후평가)

  • Lee, Hak-Ju
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.188-189
    • /
    • 2014
  • Recently, structural system of apartment building is changing from wall type to column type to accommodate various life styles of residents in Korea. Reinforced-concrete bearing wall structures have been mainly used in apartment construction since 1980's. It is impossible to remove the bearing wall in case of remodeling a house, so that the lightweight wall is needed to apply to the column type structure of the Long Life Housing. Therefore, the purpose of this study is to evaluate the construction performance of the wall. Constructibility reviews are performed throughout interview survey from builders who charge with managing the construction of the lightweight wall in field. This paper present that constructor prefer the bearing wall rather than the lightweight wall because of the schedule delay, difficulty of management, and lack of skilled labor. The results indicate what we should improve on the lightweight wall from now on.

  • PDF

A study on the quantity of shear-wall by seismic retrofit of wall-type apartment (벽식 아파트 내진보강을 위한 신설벽체 벽량에 관한 연구)

  • Jung, Woo-Kyung;Hong, Geon-Ho;Song, Jin-Gyu
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.11a
    • /
    • pp.169-172
    • /
    • 2006
  • Wall construction apartment built before 1988 years need internal examination reinforcement according to existing laws ans regulations at remodeling because do not earthquake resistant design. Established newly wall to interest paid back at the same time a the principal direction for wall construction apartment internal examination reinforcement, and satisfied internal examination standard because uses width displacement between floor. This study analyzes displacement value such as latitude and presented position of efficient reinforcement wall and wall quantity at earthquake resistant design of wall construction apartment.

  • PDF

Economic Evaluation according to Construction and Curtain Wall Mullion as a Rail (멀리온을 레일로 활용한 커튼월의 시공에 따른 경제성 평가)

  • Jung, Ui-In;Hong, Sang-Hun;Kong, Hee-Min;Kim, Bong-Joo;Yeom, Sang-Su;Kang, Hui-Tae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.17-18
    • /
    • 2016
  • Today, many kind of buildings are higher than those of previous generations, and Curtain Wall is adapted broadly as an outer wall material. But weather and environmental condition could cause problems in curtain wall construction in most construction projects. High wind speed and unplanned lifting equipment's allocation could cause construction delay and cost increase. To solve these problems, we suggest using a curtain wall mullion as a rail to lift curtain wall which is less affected wind speed. And we would like to show a preliminary data of its economic advantage evaluation.

  • PDF

Characteristics and Applicability of CWS(Continuous Wall System)II Method (CWS(Continuous Wall System)II 공법의 특성 및 적용성)

  • Lim, In-sig;Lee, Jeong-bae;Kim, Jae-dong;Lee, Jai-ho;Woo, Sung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.43-47
    • /
    • 2008
  • CWSII method was developed to overcome the problems of frequent occurrence in the application of existing downward construction methods, especially in the case of using slurry wall instead of SCW or CIP as a retaining wall. By the improvements in connecting steel beams with the wall, CWSII method is able to ensure the settlement of a steel beam and the diaphragm effect of a slab while reducing the degree of difficulty and the term of works and the cost of construction. As the desired results, CWS method can be applied as a practical downward construction method regardless of the type of retaining wall. In this paper, besides the concept and features of CWSII method, it can be seen that the method can provide reliable and economical performances by comparing with existing methods.

  • PDF

The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction (벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究))

  • Kim Joon-Ho;Kim Gwang-Hee;Cho Hyung-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.79-86
    • /
    • 2006
  • Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.

Productivity Improvement Method of Wall Rebar Work in Apartment House Construction (공동주택 벽 철근 조립 생산성 향상 방안에 관한 연구)

  • Kim, Min-Kyu;Kim, Young-Kil;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.159-160
    • /
    • 2019
  • Reinforced concrete construction is one of the labor intensive construction projects and its productivity is very low. It is necessary to increase the productivity of rebar construction for improving the productivity of construction work. Therefore, in this study, the rebar drawings of apartment buildings are analyzed to prefabricate wall rebar unit shaped mesh in the factory and installing it on site. If the proposed wall rebar unit is applied to apartment construction working time of wall rebar can be reduced by 50% or more.

  • PDF

A Study on Structural Maintenance of 'Old Wall' Designated as National Registered Cultural Heritage (국가등록문화재로 지정된 옛 담장의 정비 양상)

  • So, Hyun-Su;Jeong, Myeong-Seok
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.41 no.1
    • /
    • pp.21-34
    • /
    • 2023
  • This study identified the materials and construction methods of 'Old Wall' in 13 villages which were designated as National Registered Cultural Heritage at the time of designation and examined the their structural changes based on field survey. The results are as follows: First, the 'Old Wall' consisted of 10 Soil-Stone Wall and 5 Stone Wall. At the time of designation, Stone Wall, which was built irregularly by dry-construction of natural stones, is similar in shape, but Soil-Stone Wall showed difference by the construction method of making used stones, joints, and faces. Second, the study extracted the changes of 'Old Wall' by repair and examined the changes of construction methods as well as the substitution and addition of materials of structure. The wall-roof was built with cement roof-tile and asbestos slate which have the advantage improve durability and cost-effectiveness. In addition, tile-mouth soil was added to korean traditional roof-tile to prevent rainwater from flowing in. Besides, to improve constructional convenience, the natural stone of the wall-body was replaced with blast stone, float stone and cut stone. Cement block, cement brick and cement mortar were frequently used to repair as well. As Soil-Stone Wall was transformed from irregular pattern-construction to comb pattern-construction and wet-construction was changed to dry-construction, it caused landscape and structural problems. Also, the layer of cement mortar applied to wall-foundation blocked the flow of rainwater that was induced by dry-construction of natural stones. Third, the study regarded that the problem with the repair of 'Old Wall' may occur as it is located in living space, because the owner of the wall could repair for the minor damages without technical knowledge. In addition, it is difficult for repair companies in charge of maintenance of Cultural Heritage to supply local materials, and it is differential construction specifications are not applied.