The problems associated with constructing high-speed concrete track embankments over soft compressible soil has lead to the development and/or extensive use of many of the ground improvement techniques used today. Drains, surcharge loading, and geosynthetic reinforcement, have all been used to solve the settlement and embankment stability issues associated with construction on soft soils. However, when time constraints are critical to the success of the project, owners have resorted to another innovative approach. Especially, the design criteria of residual settlement is limited as 30mm for concrete track embankment, it is very difficult to satisfy this standard using the former construction method. Pile net method consist of vertical columns that are designed to transfer the load of the embankment through the soft compressible soil layer to a firm foundation and one or more layers of geosynthetic reinforcement placed between the top of the columns and the bottom of the embankment. This paper will present the guidelines for the design of pile net method to supported embankments. These guidelines were developed based on a review of current design methodologies and a parametric study of design variables using numerical modeling.
Performance of ground improvement project using prefabricated vertical drains of condition, in which approximately 10m dredged fill overlies original soft foundation layer in the coastal area has been conducted. From field monitoring results, excessive ground settlement compared to predicted settlement in design stage developed during the following one year. In order to predict the final consolidation behavior, recalculation of consolidation settlements and back analysis using observed settlements were conducted. Field monitoring results of surface settlements were evaluated, and then corrected because large shear deformation was occurred by construction events in the early stages of consolidation. To predict the consolidation behavior, material functions and in-situ conditions from laboratory consolidation test were re-analyzed. Using these results, height of additional embankment is estimated to satisfy residual settlement limit and maintain an adequate ground elevation. The recalculated time-settlement curve has been compared to field monitoring results after additional surcharge was applied.
The problems associated with constructing high-speed concrete track embankments over soft compressible soil has lead to the development and/or extensive use of many of the ground improvement techniques used today. Drains, surcharge loading, and geosynthetic reinforcement, have all been used to solve the settlement and embankment stability issues associated with construction on soft soils. Geosynthetic-reinforced embankment supporting piles method consist of vertical columns that are designed to transfer the load of the embankment through the soft compressible soil layer to a firm foundation and one or more layers of geosynthetic reinforcement placed between the top of the columns and the bottom of the embankment. In the paper, the evaluations of a seismic performance of geosynthetic-reinforced embankment piles for a ultra soft ground during earthquake were studied. the equivalent linear analysis was performed by SHAKE for soft ground. A seismic performance analysis of Piles was performed by GROUP PILE and PLAXIS for geosynthetic-reinforced embankment piles. Guidelines is required for pile displacement during earthquake. Conclusions of the studies come up with a idea for soil stiffness, conditions of pile cap, pile length and span.
본 연구는 현재 시공중인 사업부지를 선정하여 시험시공중에 있는 연약지반에서 페이퍼 드레인 공법에 의하여 처리한 지반에서 드레인의 타입간격별 침하거동을 파악하고, 실내시험과 현장계측치로부터 구한 압축지수와 압밀계수를 비교분석하여 배수성능의 우수성을 평가한 것으로 그결과를 요약하면 다음과 같다. 1. 실측침하량($S_m$)과 설계침하량($S_t$)의 관계 및 실측압밀도($U_m$)와 설계압밀도($U_t$)와의 관계는 드레인 타입간격 1.0m에서는 $S_m=(1.0{\sim}1.1)S_t$, $U_m=(1.13{\sim}1.17)U_t$로 나타났고, 드레인 타입간격 1.5m에서는 $S_m=(0.7{\sim}0.8)S_t$, $U_m=0.92{\sim}0.99)U_t$의 범위로 나타났다. 2. 현장압축지수($Cc_{Field}$)와 처녀압축지수($V_{CC_{lab.}}$)와의 관계는 $Cc_{Field}=(1.0{\sim}1.2)V_{CC_{lab.}}$로 나타났으나, 처녀압축지수의 결정밥법과 최종예상 침하량의 적용방법에 따른 오차를 감안하면 거의 동일한 것으로 판단된다. 3. 계측치로부터 역산한 현장압밀계수는 실내시험에서 구한 압밀계수보다 크게 나타났고, 압밀계수비($C_h/C_v$)는 드레인 타입간격 1.0m에서는 $C_h=(2.4{\sim}3.0)C_v$, 드레인 타입간격 1.5m에서는 $C_h=(3.5{\sim}4.3)C_v$의 범위로 타입간격이 넓을수록 크게 나타났다. 4 드레인 타입간격에 따른 드레인 자재별 배수성능 평가기준을 압밀계수비의 결과를 기초로 판단하여 보면, 드레인 타입간격 1.0m에서는 Mebra 드레인, 드레인 타입간격 1.5m에서는 Amer드레인이 약간 우수한 것으로 나타났으나, 동일한 타입간격에서는 재질간의 큰차이가 발생되지 않아 모두 동일한 배수성능을 갖는 것으로 판단된다.
개발사업과 산업발달로 인하여 발생되는 유해화학물질과 유류사용량이 늘면서 화학물질과 유류를 저장하는 지하저장탱크에서의 오염물질 유출로 토양 및 지하수 오염이 심각해지고 있다. 또한, 산업지역, 공장지대가 밀집된 매립 지반에서는 투수계수가 낮아 오염물질 추출에 한계가 있다. 이러한 문제해결 방안의 하나로 연약지반 개량공법에서 사용되고 있는 연직배수재를 이용하여 기존의 복원기술인 토양세정공법의 효율을 증진시킨 연직배수시스템에 대한 연구를 수행하였다. 오염된 지반의 복원을 목적으로 사용한 연직배수시스템의 적용성 평가를 위하여 오염토양 복원시 오염지반에 영향을 주는 인자에 대한 유효성 등을 분석하였다. 본 연구에서는 연직배수시스템의 적용성을 위하여 오염토양 복원시 오염지반에 영향을 주는 인자에 대한 공학적 특성을 바탕으로 파일럿 규모의 실내 오염복원 실험을 통한 오염물질의 복원효율 등을 분석하였다. 또한, 염화나트륨을 복원실험의 추적자로 사용하였고, 도출된 결과를 바탕으로 SEEP/W와 CTRAN/W 유한요소해석 프로그램을 이용하여 압력수두와 지속시간에 따른 농도변화, 각각의 지반조건에 대한 복원률의 오염물질 흐름 해석을 통한 유효성을 평가하였다. 결과, 오염지반의 투수계수는 흐름속도와 연직배수재를 통한 추출률과 관계되며, 흐름속도와 추출률은 분산지수에 영향을 미치게 되어 결국 원위치 오염복원 과정시 중요한 역할을 하게 된다.
연직배수공법은 연약지반과 준설매립지반의 압밀을 촉진시키고, 강도를 증진시키는데 가장 널리 사용되는 공법중의 하나이다. 토목섬유로 제작된 연직배수재(PVD)를 활용하여 지지력이 부족한 지반을 개량하는 경우, 배수재의 통수능력이 매우 중요한 요인으로 작용한다. 일반적으로 통수능력 실험은 고무 멤브레인으로 구속압력을 가하여 행해지고 있으나, 이는 현장에서 발생할 수 있는 여러 통수능력 저하 영향인자를 충분히 반영하지 못하고 있는 실정이다. 현장조건에서 연직배수재는 해성점토나 실트질 사질토에 의해서 구속되어 배수재가 휘어지거나, 접히거나 하여 배수성능이 저하되기 때문이다. 따라서, 본 연구에서는 연직배수재를 활용하여 연약지반을 개량할 경우 현장조건을 고려한 통수능력을 평가하기 위하여 소형 통수능력 실험장치와 대형 통수능력 실험장치를 이용하여 배수재, 토사종류 및 측압, 상재하중, 동수경사의 실험조건을 설정하여, 연직배수재의 종방향 통수능력 실험을 수행하였다. 분석 결과, 배수재 종류에 따른 통수능력은 포켓식 배수재가 접착식에 비하여 크게 도출되었다. 토사종류에 따른 통수능력은 점토보다 준설토지반에서 더 크며, 하중과 동수경사, 가압시간의 증가에 따라 통수능력이 감소하는 것으로 나타났다. 포켓식 배수재가 점토지반에 타입되었을 경우, 하모니카형 코어를 가진 배수재가 요철형보다 통수능력이 크며, 준설토 지반에 타입된 경우에는 초기 배수면적비와 통수능력비가 거의 비례하는 것으로 나타났다.
Incheon Bridge, 18.4 km long sea-crossing bridge, will be opened to the traffic in October 2009 and this will be the new landmark of the gearing up north-east Asia as well as the largest & longest bridge of Korea. Incheon Bridge is the integrated set of several special featured bridges including a magnificent cable-stayed girder bridge which has a main span of 800 m width to cross the navigation channel in and out of the Port of Incheon. Incheon Bridge is making an epoch of long-span bridge designs thanks to the fully application of the AASHTO LRFD (load & resistance factor design) to both the superstructures and the substructures. A state-of-the-art of the geotechnologies which were applied to the Incheon Bridge construction project is introduced. The most Large-diameter drilled shafts were penetrated into the bedrock to support the colossal superstructures. The bearing capacity and deformational characteristics of the foundations were verified through the world's largest static pile load test. 8 full-scale pilot piles were tested in both offshore site and onshore area prior to the commencement of constructions. Compressible load beyond 30,000 tonf pressed a single 3 m diameter foundation pile by means of bi-directional loading method including the Osterberg cell techniques. Detailed site investigation to characterize the subsurface properties had been carried out. Geotextile tubes, tied sheet pile walls, and trestles were utilized to overcome the very large tidal difference between ebb and flow at the foreshore site. 44 circular-cell type dolphins surround the piers near the navigation channel to protect the bridge against the collision with aberrant vessels. Each dolphin structure consists of the flat sheet piled wall and infilled aggregates to absorb the collision impact. Geo-centrifugal tests were performed to evaluate the behavior of the dolphin in the seabed and to verify the numerical model for the design. Rip-rap embankments on the seabed are expected to prevent the scouring of the foundation. Prefabricated vertical drains, sand compaction piles, deep cement mixings, horizontal natural-fiber drains, and other subsidiary methods were used to improve the soft ground for the site of abutments, toll plazas, and access roads. Light-weight backfill using EPS blocks helps to reduce the earth pressure behind the abutment on the soft ground. Some kinds of reinforced earth like as MSE using geosynthetics were utilized for the ring wall of the abutment. Soil steel bridges made of corrugated steel plates and engineered backfills were constructed for the open-cut tunnel and the culvert. Diverse experiences of advanced designs and constructions from the Incheon Bridge project have been propagated by relevant engineers and it is strongly expected that significant achievements in geotechnical engineering through this project will contribute to the national development of the longspan bridge technologies remarkably.
진공압밀공법은 성토재하압밀공법과는 달리 성토재료가 불필요하며, 급격한 재하에 의한 전단 파괴에 대한 위험이 없다는 공법원리상의 장점을 지니고 있으나, 시공상의 어려움으로 국내외적으로 활발하게 적용되지는 않았다. 그러나 최근들어 진공막 설치기술 및 강력한 진공펌프등의 등장으로 시공기술이 발전되면서 진공압밀공법은 미국, 유럽, 일주등지에서 적극적으로 활용되기 시작했고, 국내에서도 광양, 김해등지의 연약지반에 개량공법으로 적용된바 있다. 일반적으로 진공에 의한 부압을 가상성토하중으로 환산하고 이를 압밀이론에 적용하여 진공압밀시의 지반 거동을 예측하고 있다. 그러나 진공압을 가상성토하중으로 모델링할 경우 진공압밀공법적용시 지반내 전응력변화없이 유효응력만이 증가하는 현상을 적절히 모델링 할 수 없다. 즉 진공압에 대한 가상성토하중 모델링은 지반거동에 중요한 영향을 미치는 응력 경로를 실제와는 달리 고려하게 된다. 진공압 가상성토하중 모델링(model 1)의 적합성을 검토하기 위하여, 김해지역의 하수처리장 부지조성을 위하여 진공압밀공법이 적용된 지반에 대한 예측을 수행하였다. 일반적으로 Model 1은 진공압밀하에서의 지반침하에 대하여서는 합리적으로 예측할 수 있으나 진공부압 을 가상성토하중으로 가정하기 때문에 과잉간극수압의 크기 및 소산양상을 예측하는데는 적용 할 수 없다는 단점이 있다. 본 연구에서는 진공압밀하에서의 실제와 같이 지반의 응력경로를 고려할 수 있도록, 진공에 의한 부압을 지표면 수압의 경계 치로서 모델링(model 2)하는 해석기법을 제안하였다. 현장계측치와 비교결과, Model 2는 압밀 침하량 및 침하시간뿐 아니라 과잉 간극 수압의 크기 및 소산양상 등 진공압밀하에서의 실 지반거동이 매우 유사하게 예측되었다.
This paper is an experimental result of investigating lateral soil movements at piled bridge abutments by using the centrifuge model facility. Three different centrifuge model experiments, changing the methods of ground improvement at bridge abutment on the soft clayey soil (no improvement, preconsolidation and plastic board drains (PBD), sand compaction pile (SCP) + PBD), were carried out to figure out which method is the most appropriate for resisting against the lateral soil movements. In the centrifuge modelling, construction process in field was reconstructed as close as possible. Displacements of abutment model, ground movement, vertical earth pressure, cone resistance after soil improvement and distribution of water content were monitored during and after centrifuge model tests. As results of centrifuge model experiments, preconsolidation method with PBD was found to be the most effective against the lateral soil movement by analyzing results about displacements of abutment model, ground movement and cone resistance. Increase of shear strength by preconsolidation method resulted in increasing the resistance against lateral soil movement effectively although SCP could mobilize the resistance against lateral soil movement. It was also found that installment with PBD beneath the backfill of bridge abutment induced effective drainage of excess pore water pressure during the consolidation by embanking at the back of the abutment and resulted in increasing the shear strength of clay soil foundation and eventually increasing the resistance of lateral soil movement against piles of bridge abutment.
투수성 중간복토재로 인한 침출수 흐름 거동과 누적수위 저감을 위해 양수정을 이용한 수직배수공법의 적용 가능성을 흐름 수치해석 프로그램인 MODFLOW를 이용하여 분석하였다. 현장 양수시험과 순간충격시험으로부터 획득한 투수계수와 저류계수를 이용하여(장연수 외, 1999) 현장의 수리상황을 수치적으로 검증한 후, 매립지에서 누적수위를 저감하기 위한 양수정의 최적양수율, 영향반경, 수평드레인의 효용성을 분석하였다. 본 수치해석 결과 대상지역의 지반조사결과(장연수 외, 1999)에서도 나타났던 저투수성의 중간 복토재로인한 매립지내의 수직흐름을 방해하는 차수효과가 다시 확인되었다. 단정 양수시 120 ton/day까지 가능하였던 양수율은 수평드레인 추가후 300 ton/day까지 증가하였으나 드레인 길이가 시간-수위강하 곡선에 큰 영향을 주지는 않았다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.