• Title/Summary/Keyword: value of time

Search Result 14,751, Processing Time 0.053 seconds

A Study on the Value of U-Book Design in the Immediate and Ultimate Viewpoints (즉시와 항상적인 관점에서의 U-북디자인 가치 연구)

  • Kim, Nam-Hyoung
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2006.11a
    • /
    • pp.853-855
    • /
    • 2006
  • Today, the Publishing world goes to meet 'U-Publishing' which means the time of 'Ubiquitous Publishing 'in the Latin language. The concept of book evolves into the concept of U-Book beyond the concept of e-book from the concept of paper media book of the past Although the concept of book changes according to the times and media, there are design values which is changing and which isn't changing. We can regard these points of views as the immediate and the ultimate value. The immediate value means the values of the present time which explains the sprit of the time, and the ultimate value means what will not change beyond the time in spite of the difference of media which delivers design. This paper deals with the design of U-book concept which has been appear since 2n5 from the standpoint of the immediate and the ultimate value.

  • PDF

ON A ROBUST DESIGN OF TIME-VARYING SYSTEM WITH BOUNDED DISTURBANCE

  • Suzumura, Fumihiro;Xu, Hau;Mizukami, Koichi
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1990.10b
    • /
    • pp.852-857
    • /
    • 1990
  • The purpose of this paper is to design a robust controller for a class of time-varying systems with bounded disturbance described by the differential equation. The robust desiging method proposed in this paper, called "incentive design method" is different from developed designing methods in the past, and has following properties. The robust control law designed by this method can guarantee a certain value of the cost functional no matter how the disturbance vary within the given bounds. Here, the certain value of the cost functional may not be a saddle-point value, but is the value selected by a system designer. Therefore, the bounded disturbance has at least no bad effect on the value of the cost functional during finite interval of time. The method is based on the theory of incentive differential games. In addition, the form of control law is constructed by the system designer ahead of time. A numerical illustrative example is given in this paper. It is shown from this derivation and this numerical example that the approach developed in this paper is effective and feasible for some practical control problem.l problem.

  • PDF

A Conceptual Study on the Quantitative Measurement of Digital Data Value (디지털 데이터 가치의 정량적 측정에 대한 개념적 연구)

  • Choi, Sung Ho;Lee, Sang Kon
    • Journal of Information Technology Services
    • /
    • v.21 no.5
    • /
    • pp.1-13
    • /
    • 2022
  • With the rapid development of computer technology and communication networks in modern society, human economic activities in the almost every field of our society depend on various electronic devices. The huge amount of digital data generated in these circumstances is refined by technologies such as artificial intelligence and big data, and its value has become larger and larger. However, until now, it is the reality that the digital data has not been clearly defined as an economic asset, and the institutional criteria for expressing its value are unclear. Therefore, this study organizes the definition and characteristics of digital data, and examines the matters to be considered when considering digital data in terms of accounting assets. In addition, a method that can objectively measure the value of digital data was presented as a quantitative calculation model considering the time value of profits and costs.

3-Phase RMS Voltage Measurement Method of Virtual Frequence using Instantaneous Power Component Concept (순시전력 합성 개념을 이용한 가상주파수 3상 실효전압 계측기법)

  • Park, Seong-Mi;Yang, Ji-Hoon;Park, Sung-Jun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.3
    • /
    • pp.251-257
    • /
    • 2019
  • This paper proposes a new measurement method using virtual power concept to measure the effective value of 3-phase voltage with variable frequency. The conventional effective value measurement method uses a method of integrating data sampled during one or half cycle of the power voltage and averaging it. In this method, since the effective voltage is calculated every cycle, a time delay occurs in the measured effective voltage and it is s a problem to measure the effective value of a device whose frequency varies from time to time, such as a generator. The proposed 3-phase voltage rms measurement method has an advantage that it can measure accurate voltage RMS value regardless of measurement frequency variation. In particular, there is an advantage in that it is possible to measure a 3-phase effective voltage rather than an average value of the effective voltage of each phase in a 3-phase unbalance voltage. In addition, the validity of the proposed method is verified by using the Psim simulation tool and the experimental results are analyzed by applying the proposed measurement algorithm to the actual three phase synchronous generator voltage measurement experiment.

Study on the Behavior and Damage of Pedestrian at Car Body Impact (차체 충돌에 있어서의 보행자의 거동 및 손상에 관한 연구)

  • Cho, Jae-Ung;Han, Moon-Sik
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.20 no.2
    • /
    • pp.157-161
    • /
    • 2011
  • The study for traffic safety improvement is so necessary to minimize the wound of pedestrian at car impact as to prevent pedestrian from this accident. This study aims at analyzing the behavior affected by impact on which car body hits pedestrian. Load and damage of pedestrian are also investigated. This model is the small car body as frame structure. The pedestrian is modeled with dummy by CATIA as Korean standard body style. The ear impacts the side of pedestrian with the speed from 30 to 90km/h. Behavior and damage of pedestrian at impact are analyzed by ANSYS. In case of 30km/h, The maximum pressure of dummy becomes the maximum value of 100MPa after the elapsed time of 0.1second and then seems to remain at 105MPa constantly. In case of 60km/h, its pressure becomes the maximum value of 110MPa at the elapsed time of 0.05second and decreases at 90MPa until the elapsed time of 0.1second. This value fluctuates after the elapsed time of 0.1second. In case of 90km/h, its maximum pressure becomes the maximum value of 155MPa at the elapsed time of 0.07second and fluctuates after the elapsed time of 0.07second until O.3second. This value seems to remain at 100MPa constantly after 0.3second until 0.5second. But this pressure increases suddenly just after 0.5second. Maximum deformations of dummy increase linearly according to elapsed time at hitting velocities of 30, 60 and 90km/h.

A Study on Over-Valuation of Agreed Value in Marine Insurance -Focussed on Comparison of MIA, Japan and Korean Commercial Code- (해상보험에 있어서 협정보험가액의 과대평가에 관한 연구 -영국, 일본, 한국상법의 비교를 중심으로-)

  • Choi, Young-Bong;Park, Won-Hyung
    • International Area Studies Review
    • /
    • v.12 no.2
    • /
    • pp.277-295
    • /
    • 2008
  • Insurable value agreed by the parties shall be presumed specified at the time of the accident. It is nevertheless provided that where agreed value considerably exceeds certain amount evaluated at the time of insured accident, the amount shall be insurable value. It casts doubt on what constitutes such an excess in valuation in marine insurance. Because of the relatively short periods and less volatile economies, maritime insurance, with the statutory insurance value, has deemed insurable value conclusive. In other ways, the provision of default rule substitutes the amount evaluated at the time of insured accident for statutory insurance value. However, over-valuation of agreed value determined by the comparison of statutory insurance value leads to non sequitur in valued policy. Maritime insurance, in the case of over-valuation of agreed value, construes certain amount evaluated at the time of insured accident as insurable value. Accordingly, beyond the application of statutory insurance value, the amount should be considered for over-valuation of agreed value.

Analysis of Influence Factors of Setting Time Estimation System for AI-Based Concrete Finishing Automation System (AI 기반 콘크리트 마감 자동화 시스템용 응결추정계의 영향인자 분석)

  • Han, Soo-Hwan;Hu, Yun-Yao;Kim, Su-Ho;Lim, Gun-Su;Kim, Jong;Han, Min-Cheol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.177-178
    • /
    • 2022
  • As part of the study on the development of the setting time estimation system, this study attempted to confirm the change in hardness values for each influencing factor variable and secure its reliability. According to the research results of this paper, the hardness value of the setting time estimation system tended to gradually decrease in the case of the hardness value of the closing time by curing temperature, and the hardness value increased in the concrete state compared to mortar. Therefore, further research on influencing factors will be conducted in consideration of material and statistical factors in the future.

  • PDF

Forecasting Project Cost and Time using Fuzzy Set Theory and Contractors' Judgment

  • Alshibani, Adel
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.174-178
    • /
    • 2015
  • This paper presents a new method for forecasting construction project cost and time at completion or at any intermediate time horizon of the project duration. The method is designed to overcome identified limitations of current applications of earned value method in forecasting project cost and time. The proposed method usesfuzzy set theory to model uncertainties associated with project performance and it integrates the earned value technique and the contractors' judgement. The fuzzy set theory is applied as an alternative approach to deterministic and probabilistic methods. Using fuzzy set theory allows contractors to: (1) perform risk analysis for different scenarios of project performance indices, and (2) perform different scenarios expressing vagueness and imprecision of forecasted project cost and time using a set of measures and indices. Unlike the current applications of Earned Value Method(EVM), The proposed method has a numberof interesting features: (1) integrating contractors' judgement in forecasting project performance; (2) enabling contractors to evaluate the risk associated with cost overrun in much simpler method comparing with that of simulation, and (3) accounting for uncertainties involved in the forecasting project cost.

  • PDF

A Study on Simulation Analyze on Scheduling Application to Lifetime Value(LTV) (LTV(Lifetime Value)를 적용한 일정계획의 시뮬레이션 분석에 관한 연구)

  • 양광모;박재현;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.1
    • /
    • pp.219-228
    • /
    • 2004
  • We can be acquire the conformation about on the due date of supplier by using the A TP(A vail able to Promise) function of management about real and concurrent access on the supply chain, also decide the affect about product availability due to forecasting or customer's orders through the A TP. Under the these environments, defines the A TP rule that can improve the customer value and data flow related the LTV(Life Time Value) and builds on a algorithm. In this paper, It consolidates the necessity on a LTV (Life Time Value) and analyzes data which is concerned of Customer Value. Under the these environments, defines the LTV rule that can improve the customer value. And then, Scheduling plays an important role in shop floor planning. Therefore, this study tries to proposed that Scheduling by customer needs group for minimizing the problem.

Estimating the Value of Travel Time for Intercity Leisure Trips (지역간 여가통행의 시간가치 산정 연구)

  • Lee, Jang-Ho
    • Journal of Korean Society of Transportation
    • /
    • v.30 no.6
    • /
    • pp.59-70
    • /
    • 2012
  • The relative importance of leisure trip has been increased after adopting the five-day workweek system and considering the higher income level. Thus, the value of travel time for intercity leisure trips should be estimated to conduct a reasonable benefit/cost analysis for railway construction projects. In this paper, the value of travel time was estimated separately for each trip purpose such as business, leisure, and other non-business than leisure. The estimated values of leisure travel time ranged from 5,310 to 14,185 (won/hr) by altering travel mode, and were increased by 42-107% when comparing with those of non-business travel time. Besides, how to apply the value of intercity leisure travel time for B/C analysis of railway projects was suggested. For the construction case of a railway connecting Chuncheon and Sokcho, the estimated benefit was increased by 2.3%.