• Title/Summary/Keyword: value engineering

Search Result 19,885, Processing Time 0.043 seconds

Effect on Purchase Intention in Online Shopping Malls: Focusing on Value Creation Factors (온라인쇼핑몰에서 구매의도에 미치는 영향: 가치창조요소 중심으로)

  • Jwa, In-Yeol;Park, Kwang-Ho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.2
    • /
    • pp.56-64
    • /
    • 2022
  • Many studies have suggested that e-commerce value creation potential depends on four interdependent factors Lock-In, Complementarity, Efficiency, and Novelty. In order to survive in the recent fierce competition, companies have also secured e-Trust that strengthens long-term business relationships by reducing consumer uncertainty. This study, while analyzing the value creation factors (Lock-in, Complementarity, Efficiency, Novelty, e-Trust) of recent e-commerce (online shopping mall) companies from the point of view of purchase intention, customer value (Functional value, Emotional value, Social value) We present an academic proposition that can also examine the mediating effect of value). First, through previous studies on value-based strategy and value creation in e-commerce, various discussions on the theoretical background necessary for effective value-based strategy establishment and strategy execution of e-commerce (online shopping mall) companies were reviewed. Second, it provides academic discussion and practical implications by presenting academic propositions on the value creation factors of e-commerce (online shopping mall) companies, purchase intentions, and customer value, and confirming the basis through empirical analysis.

TRIPLE SOLUTIONS FOR THREE-ORDER PERIODIC BOUNDARY VALUE PROBLEMS WITH SIGN CHANGING NONLINEARITY

  • Tan, Huixuan;Feng, Hanying;Feng, Xingfang;Du, Yatao
    • Journal of applied mathematics & informatics
    • /
    • v.32 no.1_2
    • /
    • pp.75-82
    • /
    • 2014
  • In this paper, we consider the periodic boundary value problem with sign changing nonlinearity $$u^{{\prime}{\prime}{\prime}}+{\rho}^3u=f(t,u),\;t{\in}[0,2{\pi}]$$, subject to the boundary value conditions: $$u^{(i)}(0)=u^{(i)}(2{\pi}),\;i=0,1,2$$, where ${\rho}{\in}(o,{\frac{1}{\sqrt{3}}})$ is a positive constant and f(t, u) is a continuous function. Using Leggett-Williams fixed point theorem, we provide sufficient conditions for the existence of at least three positive solutions to the above boundary value problem. The interesting point is the nonlinear term f may change sign.

Analysis of Important Factors for Value Engineering in Highway Construction (도로건설에서 가치공학을 위한 중요인자 분석)

  • 임영문;최요한
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2002.11a
    • /
    • pp.17-23
    • /
    • 2002
  • Value can be defined as function divided by cost. The ultimate goal of VE (Value Engineering) is to simultaneously reduce cost and to enhance function in given projects. In general, there are eight phases (Selection, Investigation, Speculation, Evaluation, Development. Presentation, Implementation, and Audit) to perform VE. This paper presents analysis of important factors for VE in construction fields using QFD (Quality Function Deployment) technique. QFD was introduced in 1972 to help design supertanker in Mitsubish's shipyards in Kob, Japan and formally defined by the American Supplier Institute in 1987 as a system for translating consumer requirements into appropriate company requirements at every stage, from research, through product design and development, to manufacture, distribution, installation, and marketing, sales and services. The objective of this paper is to provide and analyze the trend on the viewpoint of efficient value engineering of field workers. The data are collected by questionnaires. The samples for this study are chosen from 13 companies in Korea during 2 months (2002. 7 ∼ 2002. 8). The results of this study will play an important role not only for the efficient value engineering but also for preparing of life cycle cost analysis.

  • PDF

Using Real Options to value the flexibility of Engineering Management decisions in Infrastructure Projects

  • Koo, Bonsang
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.1
    • /
    • pp.10-13
    • /
    • 2013
  • Determining on a particular construction method is typically decided in the initial phases of a project. However, changing conditions during actual construction may require a different method or technology to be employed. Providing an option for project managers to change construction provides flexibility that can increase value to the overall project. This research provides the ability to modify construction methods as a real option, which allows its value to be modeled. The research also formalizes a way to integrate a binomial lattice model with the Earned Value Method's S-curve. The integrated model provides a decision support tool that planners can use to determine whether to exercise the option depending on the status metrics provided by EVM.

Public Building Value Evaluation Using Contingent Valuation Method Based on Market Value Estimation

  • PARK, Jieun;YU, Jungho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.367-370
    • /
    • 2015
  • Building deterioration reflects the degradation of basic building performance including structural performance, energy performance, durability, and safety, and it also includes perceived deterioration, which considers a user-based perspective. More than 50% of the existing buildings in Korea are over 15 years old and public buildings compose 2.5% of all buildings domestically. Therefore, there are several different problems, such as poor energy efficiency, structural performance, and safety. To address the challenges of increasing stock in deteriorated buildings, it is necessary to make decisions about reconstruction or renovation. In this study, we propose a new method to evaluate public building value with a contingent valuation method (CVM). By estimating willing-to-pay (WTP) from users of private buildings in similar situation with the public building, it is possible to compare market prices and calculate a correction factor to adjust the WTP data. Finally, we apply the correction factor to the WTP of a public building and estimate market price, willingness to pay (WTP). Finally, we apply the correction factor to willing to pay (WTP) of public building and estimate market price.

  • PDF

Prediction of Fatigue Life in 2024-73 Aluminum Using X-ray half-value breadth

  • Kim, Soon-Ho;Cho, Seok-Swoo;Park, Jung-Hyeon
    • International Journal of Precision Engineering and Manufacturing
    • /
    • v.3 no.2
    • /
    • pp.78-86
    • /
    • 2002
  • In general, X-ray diffraction method detects the changes of crystal lattice under material surface using the angle of diffraction 2$\theta$. This technique which deals with in the presented paper can be applied to a behavior on the slipped band or the micro crack cause to material degradation. The relation between half-value breadth and cycle numbers shows three stages, which consist of rapid decrease in the initial cycle, slight decrease in the middle cycle, and then rapid decrease in the final cycle. The ratio of half-value breadth has a constant value on B/B$\_$0/ - N diagram under the loading condition except early part of fatigue life. The ratio of half-value breadth B/B$\_$0/ - log N$\_$f/ with respect to number of cycle to failure N$\_$f/ has linear behavior on B/B$\_$0/ - log N$\_$f/ diagram. Therefore, the evaluation of fatigue life by the average gradient has much less mean error than the estimation of fatigue life by log B/B$\_$0/ - log N/N$\_$f/ relation.

A Simple and Robustness Algorithm for ECG R- peak Detection

  • Rahman, Md Saifur;Choi, Chulhyung;Kim, Young-pil;Kim, Sikyung
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.5
    • /
    • pp.2080-2085
    • /
    • 2018
  • There have been numerous studies that extract the R-peak from electrocardiogram (ECG) signals. All of these studies can extract R-peak from ECG. However, these methods are complicated and difficult to implement in a real-time portable ECG device. After filtration choosing a threshold value for R-peak detection is a big challenge. Fixed threshold scheme is sometimes unable to detect low R-peak value and adaptive threshold sometime detect wrong R-peak for more adaptation. In this paper, a simple and robustness algorithm is proposed to detect R-peak with less complexity. This method also solves the problem of threshold value selection. Using the adaptive filter, the baseline drift can be removed from ECG signal. After filtration, an appropriate threshold value is automatically chosen by using the minimum and maximum value of an ECG signals. Then the neighborhood searching scheme is applied under threshold value to detect R-peak from ECG signals. Proposed method improves the detection and accuracy rate of R-peak detection. After R-peak detection, we calculate heart rate to know the heart condition.

A study on the atmospheric diffusion of land around the clean center (크린센터 주변 부지 대기확산에 관한 연구)

  • Choi, Hong-Ju;Jeon, Yong-Han
    • Design & Manufacturing
    • /
    • v.15 no.2
    • /
    • pp.49-55
    • /
    • 2021
  • In this study, CALPUFF, a three-dimensional atmospheric diffusion model, was used to predict the degree of influence of pollutants generated during clean center operation on surrounding areas. To drive the CALPUFF model, CALMET, a weather field calculation model, was used. Due to the influence of the wind field, air pollutants from the Clean Center diffused in the southeast direction, increasing the distribution area. SOx satisfies atmospheric environmental standards with an annual average value of 0.02 ppm or less NOx satisfies atmospheric environmental standards with an annual average value of 0.03 ppm or less. Dust (PM-10) satisfies atmospheric environmental standards with an annual average value of 50㎍/m3 or less and 24 hours average value of 100㎍/m3 or less. CO satisfies atmospheric environmental standards with an 8 hours average value of 9 ppm or less and an 1 hour average value of 25 ppm or less.

Analysis on lateral vibration characteristics of the deep-sea mining pipe

  • Xiao, Linjing;Liu, Qiang
    • Structural Engineering and Mechanics
    • /
    • v.83 no.6
    • /
    • pp.835-851
    • /
    • 2022
  • This paper analyzes the variation law of the pipe lateral vibration characteristics, it was treated as a beam model, and was dispersed into several subunits based on the FEM. The corresponding stiffness and mass matrix of the pipe was deduced by using Hermite interpolation function, and the overall dynamic balance equation was established. The lateral vibration under different pipe lengths, thicknesses and towing speeds are solved by integral method. The results show that the pipe vibration trend decreases first and then increases, and the vibration value at the ore bin is larger than that at the pump set, and the value at the top is the largest, and the least value location can change with the length increase. Increasing length and thickness can reduce lateral vibration value, while increasing speed can increase the value. Neither the thickness nor the towing speed will change the location where the least value occurs. The vibration intensity will increase with the decrease of pipe length and thickness and the increase of towing speed.

The Develope Methodology for the Design Value Engineering Checklist by Categorizing the Drawing Information (도면정보의 범주화를 통한 설계VE 점검 체크리스트 개발 방법)

  • Song, Ji-Won;Ha, Young-Seo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.863-867
    • /
    • 2008
  • Value Engineering is one of the most effective too13 to achieve the required cost and time reduction, quality and safety improvement. The role and importance of design value engineering is expected to be high, so the research is needed for its effective accomplishment. Therefore, in this research we have suggested the method of checklist development for the effective accomplishment of design value engineering work. Also, the way of development is that derives major elements from drawing information category and from the base of the derived elements, the research lists up the checklist items. At last, it developed design value engineering checklist based the item that listed up throughout the experts.

  • PDF