• Title/Summary/Keyword: upper strand

Search Result 12, Processing Time 0.031 seconds

Analytical model for transfer length prediction of 13 mm prestressing strand

  • Marti-Vargas, J.R.;Arbelaez, C.A.;Serna-Ros, P.;Navarro-Gregori, J.;Pallares-Rubio, L.
    • Structural Engineering and Mechanics
    • /
    • v.26 no.2
    • /
    • pp.211-229
    • /
    • 2007
  • An experimental investigation to determine the transfer length of a seven-wire prestressing strand in different concretes is presented in this paper. A testing technique based on the analysis of bond behaviour by means of measuring the force supported by the prestressing strand on a series of specimens with different embedment lengths has been used. An analytical bond model to calculate the transfer length from an inelastic bond stress distribution along the transfer length has been obtained. A relationship between the plastic bond stress for transfer length and the concrete compressive strength at the time of prestress transfer has been found. An equation to predict the average and both the lower bound and the upper bound values of transfer length is proposed. The experimental results have not only been compared with the theoretical prediction from proposed equations in the literature, but also with experimental results obtained by several researchers.

Pillar stability in very near-twin tunnels (초근접 병설터널의 필라 안정성 확보)

  • Kim, Donggyou;Koh, Sungyil;Lee, Jeongyong;Lee, Chulhee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.699-714
    • /
    • 2022
  • The objective of this study is to suggest a safe and economical pillar reinforcement method when very near-twin tunnels with a minimum interval of 1 m passes through a soft zone such as weathered soil or weathered rock. A standard cross-sectional view of a two-lane road tunnel was applied to suggest a pillar reinforcement method for the very near-twin tunnels. The thickness of the pillar was 1 m. The ground condition around the tunnel was weathered soil or weathered rock. There were four reinforcement methods for pillar stability evaluation. These were rock bolt reinforcement, pre-stressed steel strand reinforcement, horizontal steel pipe grouting reinforcement, horizontal steel pipe grouting + prestressed steel strand reinforcement. When the ground condition was weathered soil, only the pillar reinforced the horizontal steel pipe grouting + prestressed steel strand did not failed. When the ground condition was weathered rock, there were no failure of the pillar reinforced the horizontal steel pipe grouting or the horizontal steel pipe grouting + prestressed steel strand. It is considered that the horizontal steel pipe grouting reinforcement played a role in increasing the stability of the upper part of the pillar by supporting the upper load applied to the upper part of the pillar.

Single -portal Subscapualrs tendon repair

  • Choe, Chang-Hyeok;Kim, Sin-Geun;Jang, Ho-Jin;Chae, Seong-Beom
    • The Academic Congress of Korean Shoulder and Elbow Society
    • /
    • 2008.03a
    • /
    • pp.179-179
    • /
    • 2008
  • For a partial tear of the subscapularis tendon, the presenting technique requires only the anterior portal for preparing the footprint and suture management, as well as the subclavian portal for placing the suture anchor and suture hook without inserting a cannula. It provides both a good angle for anchor placement and sufficient space for managing the upper portion of a subscapularis tendon tear. A spinal needle was inserted through the subclavian portal in order to identify the appropriate angle for placing the suture anchor. A 3-mm incision was made for the subclavian portal and a biosuture anchor was placed on the footprint portion of the subscapularis tendon. In order to avoid crowding, each limb of both strands of the biosuture anchor were passed through the tendon- posteromedial side first, and anterolateral side second, using a switching technique with suture hook embedded with no.1 PDS. A suture tie was applied in a reverse sequence (the lateral strand first and the medial strand second) through the anterior cannula using a sliding technique.

  • PDF

Moistureproof Characteristics of Woodboard Types with Surface Thermal Changes (목질 보드류의 표면 열변화에 따른 접촉각(방습) 특성)

  • Shin, Sang-Ho;Liim, Nam-Gi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.161-162
    • /
    • 2020
  • In this study, as part of securing related data, water droplets were dropped on the upper part of the wooden board for flooring in an environment such as floor heating, and the degree of absorption according to the surface temperature change was tested. The test results showed that the contact angle of the surface was low (25℃→40℃) or the droplet was absorbed into the small plate and disappeared. The contact angle of the OSB and MDF was decreased within 30 minutes, but the surface water droplet was maintained longer than the plywood. This is because the surface is coated with hydrophobicity unlike the plywood, but moisture absorption in the cross section after the second processing will not be prevented and it will lead to defect occurrence problem.

  • PDF

Behavior Analysis of PPWS Sockets for Suspension Bridges Considering Frictional Contact (마찰 접촉을 고려한 현수교 PPWS용 소켓의 거동 해석)

  • Yoo, Hoon;Lee, Sung-Hyung;Seo, Ju-Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1281-1293
    • /
    • 2013
  • A sophisticated finite element model is illustrated to analyze the behavior of Prefabricated Parallel Wire Strand(PPWS) sockets for main cables of suspension bridges. An orthotropic model is proposed for the casting material by considering both effects of individual wires and a casting alloy, and the contact between surfaces of a socket and a casting alloy is idealized by using the Coulomb friction and the surface-based contact model. The proposed FE model is verified by comparing the strain distributions obtained from the tensile test and FE analysis. The mechanical behavior of a socket is investigated with respect to the variation of the frictional coefficient. The result shows that the friction between surfaces significantly diminishes the stress concentration of a socket and a casting alloy, and the normal stress from the design equation represents the averaged value of the upper and lower quartiles in the distribution of contact stresses between a socket and a casting alloy.

Flexural Behaviors of High Performance Hollow Core Slabs with Upper Strands (상부강선을 갖는 고성능 중공슬래브의 휨거동)

  • 김인규;박현석;유승룡
    • Journal of the Korea Concrete Institute
    • /
    • v.14 no.2
    • /
    • pp.156-163
    • /
    • 2002
  • Hollow core slabs generally have not been used for a bridge or a parking slab in Korea. In this study, high performance hollow core slabs, which have been the most thick one in domestic are re-designed and examined for practical use. Flexural tests were performed on four 315mm deep hollow core slabs to investigate adaptability for high vehicle live loadings and composite action with topping concrete. The precast slabs were pre-tensioned with ten strands of 1/2 inch diameter at the lower of slab and four strands of 1/2 inch diameter at the upper of slab, and cast with 80 mm deep topping concrete. Tested hollow core slabs showed ductile failure behaviors which were conformed to the current Ultimate Strength Design Method for a span of 10m up to the live load of 1,000 kgf/㎡. The rectangular md round shear cotters which were used for the composite action between precast and topping concrete, developed sufficient strengths because cracking, even micro had not been developed at the end of slabs up to the pure flexural tensile failure.

Behavior and Improvement of Construction Crack occurred on Anchorage of PSC-edge Girder Rahmen Bridge (PSC-Edge 거더 라멘교의 정착부에 발생한 시공 균열 거동과 개선)

  • Ok, Jae-Ho;Yhim, Sung-Soon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.5
    • /
    • pp.569-576
    • /
    • 2019
  • PSC-Edge Rahmen Bridge makes low thickness and long span by introducing prestressed force to the edge girder and reducing positive moment. In the bridge, diagonal tension cracks occurred in the direction of $45^{\circ}$ to outer side of the girder after the temporary bent supported on the lower part of the upper slab and the secondary strand is tensioned on the girder. Researches on stress distribution and burst crack behavior of pre-stress anchorage has been conducted, it is difficult to analyze an obvious cause due to difference between actual shape and boundary condition. This study performed 3D frame analysis with additional boundary condition of temporary bent, the maximum compression stress occurred in the girder and there was a limit to identify the cause. It performed 3D Solid analysis with LUSAS 16.1 and the maximum principal tensile stress occurred at the boundary between the girder and the slab. As analyzing required reinforcement quantity at obtuse angle of the girder with the maximum principal tensile stress and directional cosine, reinforcement quantity was insufficient. Additional bridges have increased reinforcement quantity and extended area and crack was not occurred. It is expected that cracks on the girder during construction could be controlled by applying the proposed method to PSC-Edge Rahmen Bridge.

Investigations of Application of Anchor Type Nail Using Experiments and Numerical Analysis (모형실험 및 수치해석을 이용한 앵커형 네일의 적용성 검토)

  • Kim, Donggun;Jeong, Gilsu;Jo, Kwangjun;Yoo, Namjae;Um, Jaekyung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.11
    • /
    • pp.19-26
    • /
    • 2012
  • In the present study, anchor type nail with PC-strand which can add up the pre-stress at the nailing to increase the resistance and shear stress in the whole ground has been investigated. Load-displacement and wall displacement have been analyzed by experimental model and numerical analysis of anchor type nail, nailing, and non-nailing to examine the behavior of anchor type nail. From the experimental results, it was found that horizontal displacement is considerably decreased according to increasing the load in case of anchor type nail added pre-tension. Especially, it was observed that resistance of displacement at the upper wall is increased. The results of numerical analysis show the same results of experimental results.

Model Tests on the Lateral Behavior of Steel Pipe Piles(I) in the Nak -dong River Sand (강관말뚝의 수평거동에 대한 모형실험 연구(I) -대구지역 낙동강 모래에 대하여)

  • 김영수;허노영
    • Geotechnical Engineering
    • /
    • v.13 no.5
    • /
    • pp.59-74
    • /
    • 1997
  • This paper shows the results of a series of model bests on the behavior of single steel pipe pile which is subjected to lateral load in Nak-dong river sand. The purpose of the present paper is to estimate the effect of Non -homogeneous soil, constraint condition of pile head, lateral load velocity, relative density of soil, embedded pile length, and flexural stiffness of pile on the behavior of single pile which is embedded in Nak-dong river strand. These effects can be quantined only by the results of model tests. The nonlinear responses of lateral loadieflection relationships are fitted to 2nd polynomial equations by model tests results. Also, the lateral load of a deflection, yield and ultimate lateral load max. bending moment, and yield bending moment can be expressed as exponential function in terms of relative density and deflection ratio. By comparing Brom's results with model results on the lateral ultimate load, it is found that short and long pile show the contrary results with each other. The contrary results are due to the smaller assumed soil reaction than the soil reaction of the Nakiong river sand at deep point. By comparing lateral behavior on the homogeneous soil with non-homogeneous soil, it is shown that lateral loadieflection relationship is very dependent on the upper relative density. This phenomenon is shown remarkably as the difference between upper and lower relative density increases.

  • PDF

Erection Method for Marine Section of Double Deck Warren Truss in Young Jong Grand Bridge (영종대교 복층 Warren Truss 해상구간 가설공법)

  • Kim Jeong-Woong;Seo Jea-Hwa;Yang Mu-Seok;Yuk Il -Dong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.232-239
    • /
    • 2001
  • Young Jong Grand Bridge is approach traffic road of New Inchon International Airport which covers hub airport function in northeast asia. The total span length of this bridge is $4,420{\cal}m$ and this main bridge type is, the first in the world, Double Deck Self Anchored Suspension Bridge, designed as double deck systems to be arranged by road and railroad. Approach bridges to be connected with main span also are composed double deck steel truss and steel box girder to consider a continuity with this span. Our company erected $1,375{\cal}m$(about 60,000tons) of double deck steel truss bridge type which is composed by 6 traffic lane on upper deck and 4 traffic lane and Double track railroad on lower deck. The original installation method of this bridge was planed to install about 75 meters bridge blocks to use floating crane, after temporary bent was constructed between permanent piers. But this method which had to construct many temporary bents in the sea had the matter that construction periods can become lengthen and construction cost can be risen. To overcome the uncertainty to ensure high qualify of bridge and economic project execution, our company developed new bridge erection method to assure both quality control and economic construction work. The new erection method which was developed by us was one that could transport and install long bridge block, $120{\cal}m$ unit at a time and that temporary bent was not required. We hope that this paper is used as technical data which will erect bridge in the western sea and others marine region.

  • PDF