Analytical model for transfer length prediction of 13 mm prestressing strand |
Marti-Vargas, J.R.
(Department of Construction Engineering and Civil Engineering Projects, School of Civil Engineering, Polytechnic University of Valencia)
Arbelaez, C.A. (Department of Construction Engineering and Civil Engineering Projects, School of Civil Engineering, Polytechnic University of Valencia) Serna-Ros, P. (Department of Construction Engineering and Civil Engineering Projects, School of Civil Engineering, Polytechnic University of Valencia) Navarro-Gregori, J. (Department of Construction Engineering and Civil Engineering Projects, School of Civil Engineering, Polytechnic University of Valencia) Pallares-Rubio, L. (Department of Construction Engineering and Civil Engineering Projects, School of Civil Engineering, Polytechnic University of Valencia) |
1 | Brearley, L.M. and Johnston, D.W. (1990), 'Pull-out bond tests of epoxy-coated prestressing strand', J. Struct. Eng., ASCE, 116(8), 2236-2252 DOI |
2 | Chen, H. and Wissawapaisal, K. (2001), 'Measurement of tensile forces in a seven-wire prestressing strand using stress waves', J. Eng Mech., ASCE, June, 599-606 |
3 | ACI (1963), Building Code Requeriments for Reinforced Concrete (ACI 318-63), American Concrete Institute, Detroit, MI |
4 | ACI (2005), Building Code Requeriments for Reinforced Concrete (ACI 318-05), American Concrete Institute, Fannington Hills. MI |
5 | AENOR (1997), UNE 36094: Alambres y cordones de acero para armaduras de hormigon pretensado, Asociacion Espanola de Normalizacion y Certificacion, Madrid. (spanish text) |
6 | Balazs, G. (1992), 'Transfer control of prestressing strands', PCI J., 37(6), 60-71 DOI |
7 | Balazs, G. (1993) 'Transfer length of prestressing strand as a function of draw-in and inicial prestress', PCI J., 38(2), 86-93 DOI |
8 | Barnes, R.W., Grove, J.W. and Burns, N.H. (2003), 'Experimental assessment of factors affecting transfer length', ACI Struct. J., 100(6), 740-748 |
9 | CEB (1987), Anchorage Zones of Prestressed Concrete Members, Bulletin d'Infonnation 181, Comite EuroInternational du Beton, Lausanne, Switzerland |
10 | CEB-FIP (1990), CEB-FIP Model Code 1990 (MC90), Bulletin d'Infonnation 213/214, Comite EuroInternational du Beton and Federation Internationale de la Precontrainte, Lausanne, Switzerland |
11 | CEN (1991), Eurocode 2: Design of Concrete Structures - Part 1-1: General Rules and Rules for Buildings, European prestandard ENV 1992-1-1: 1991, Comite Europeen de Nonnalisation, Brussels, Belgium |
12 | CEN (2000), Cement. Part 1: Compositions, Specifications and Conformity Criteria for Common Cements, European standard EN 197-1:2000, Comite Europeen de Nonnalisation, Brussels, Belgium |
13 | CEN (2004), Eurocode 2: Design of Concrete Structures - Part 1-1: General Rules and Rules for Buildings, European standard EN 1992-1-1 :2004:E, Comite Europeen de Nonnalisation, Brussels, Belgium |
14 | Cousins, Th. E., Johnston, D.W. and Zia, P. (1990), 'Transfer and development length of epoxy-coated and uncoated prestressing strand', PCI J., 35(4), 92-103 DOI |
15 | Linger, D.A. and Bhonsle, S.R. (1963), 'An investigation of transfer length in pretensioned concrete using photoelasticity', PCI J., 8(4), 13-30 DOI |
16 | Deatherage, J.H., Burdette, E. and Chew, Ch.K. (1994), 'Development length and lateral spacing requirements of prestressing strand for prestressed concrete bridge girders', PCI J., 39(1), 70-83 |
17 | den Uijl, J.A. (1998), Bond Modelling of Prestressing Strand. Bond and development of reinforcement, SP 180-7, ACI International, Farmington Hills. MI |
18 | Evans, R.H. and Robinson, W.R. (1955), 'Bond stresses in prestressed concrete from x-ray photographs', P. I. Civil Eng PT l, 6(14), 212-235 |
19 | Marti, J.R. (2003), Experimental Study on Bond of Prestressing Strand in High-strength Concrete, PhD Thesis, Polytechnic University of Valencia, ProQuest Information and Learning Company, UMI Number 3041710, MI. (spanish text) |
20 | Mahmoud, Z.I., Rizkalla, S.H. and Zaghloul, E.R. (1999), 'Transfer and development lengths of carbon fiber reinforcement polymers prestressing reinforcing', ACl Struct. J., 96(4), 594-602 |
21 | Fu, X. and Chung, D.D.L. (1998), 'Effects of water-cement ratio, curing age, silica fume, polymer admixtures, steel surface treatments, and corrosion on bond between concrete and steel reinforcing bars', ACI Mater. J., 95(6), 725-734 |
22 | Janney, J. (1954), 'Nature of bond in pretensioned prestressed concrete', ACI J., 25(9), 717-737 |
23 | FIB (2000), Bond of Reinforcement in Concrete. State of the Art Report, Bulletin d'Information 10, Federation Internationale du Beton, Lausanne, Switzerland |
24 | Guyon, Y. (1953), Beron precontrainte. Etude theorique et experimentale, Ed. Eyrolles, Paris, France |
25 | Thorsen, N. (1956), 'Use of large tendons in pretensioned concrete', ACI J., Feb., 649-659 |
26 | Zia, P. and Mostafa, T. (1977), 'Development length of prestressing strands', PCI J., 22(5), 54-65 DOI |
27 | Shahawy, M., Moussa, I. and Batchelor, B. (1992), 'Strand transfer lengths in full scale aashto prestressed concrete girders', PCI J., 37(3), 84-96 |
28 | Shahawy, M. (2001), 'A critical evaluation of the AASHTO provisions for strand development length of prestressed concrete members', PCI J., 46(4), 94-117 DOI |
29 | Tabatabai, H. and Dickson, Th. (1993), 'The history of the prestressing strand development length equation', PCI J., 38(5), 64-75 |
30 | Tadros, M.K. and Baishya, M.C (1996), Discussion of 'A review of strand development length for pretensioned concrete members', PCI J., 41(2), 112-127 |
31 | Marti-Vargas, J.R., Serna-Ros, P., Femandez-Prada, M.A., Miguel-Sosa, P.F. and Arbelaez, C.A. (2006), 'Test method for determination of the transmission and anchorage lengths in prestressed reinforcement', Mag. Concrete Res., 58(1), 21-29 DOI ScienceOn |
32 | Russell, B.W and Burns, N.H. (1996), 'Measured transfer lengths of 0.5 and 0.6 in. strands in pretensioned concrete', PCI J., 41(5), 44-65 |
33 | Olesniewicz, A. (1975), Statistical Evaluation of Transmission Length of Strand, Research and design Centre for Industrial Building (BISTYP), Varsaw, Poland |
34 | Mitchell, D., Cook, W.D., Khan, A. and Tham, T. (1993), 'Influence of high strength concrete on transfer and development length ofpretensioning strand', PCI J., 38(3), 52-66 |
35 | Nanni, A., Utsunomiya, T., Yonekura, H. and Tanigaki, M. (1992), 'Transmission of prestressing force to concrete by bonded fiber reinforced plastic tendons', ACl Struct. J., 89(3), 335-344 |
36 | Nijhawam, J.C. (1978), Discussion of 'Development length ofprestressing strand', PCI J., 23(4), 97-107 |
37 | Ratz, E.H., Holmjanski, M.M. and Kolner, V.M. (1958), 'The trasnsmission of prestress to concrete by bond', Proceedings of '58 Federation 1nternationale de la Precontrainte Congress, Berlin, 624-640 |
38 | Bruggeling, A.S.G. and Huyghe, G.F. (1991), Prefabrication with Concrete, Ed. A.A. Balkema/Rotterdam/Brookfield, Netherlands |
39 | Buckner, C.D. (1995), 'A review of strand development length for pretensioned concrete members', PCI J., 40(2),84-105 DOI |