This paper presents a new algorithm which evaluates production cost and reliability indices under various constraints of the thermal generation system. In order to consider the operational constraints of thermal units effectively, the proposed algorithm is based on Monte Carlo techniques instead of analytical ones which have difficulty in modelling the units with additional constraints. At that point, generating units are modelled into two types, base load units and peaking units. These generating unit models are used in state duration sampling simulation for which approach can readily consider the peaking unit operating cycles and easily calculates frequency-duration indices. The proposed production simulation algorithm is applied to the IEEE Reliability Test System, and performs the production simulation under the given constraints. The results show that the proposed algorithm is accurate, reliable and useful.
PLC (Power Line Communication) is the communication method using the existing power line installed in houses and offices to convert and transmit high frequency communication signal from tens of KHz to tens of MHz, and receive the filtered signal using high frequency filter The advantage of PLC is that PLC uses the existing power line installed in houses and offices so it does not require separate power line. Easy and convenient access using electric outlets is another advantage of PLC. However, PLC has some disadvantages such as limited transmission power, high load interference and noise, variable signal attenuation, characteristic of impedance, and selective possibility of frequency property. We designed the boiler temperature control system unit by using the PLC modem. We can avoid unnecessary heating of separate temperature control unit, and save the cost accordingly control stability of the proposed system is proven through the experiment.
This paper presents a load sharing method based on the low bandwidth communication (LBC) applied to a DC microgrid in order to balance the state of charge (SOC) of the battery units connected in parallel to the common bus. In this method, SOC of each battery unit is transferred to each other through LBC to calculate average SOC value. After that, droop coefficients of battery units are adjusted according to the difference between SOC of each unit and average SOC value of all batteries in the system. The proposed method can effectively balance the SOC of battery units in charging and discharging duration with a simple low bandwidth communication system.
A simple pendulum shows how efficient gravity is in recovering energy. Any transportation is a linearly oscillating system; every load gains kinetic energy, but loses the same to come to a stop. The Gravity Power Towers comprise of a set of vertically moving heavy masses coupled, through microprocessor controlled continuously variable gear and cable system, to a horizontally rolling unit on wheels either on rail or road. The heavy masses move vertically up against gravity gaining potential energy while stopping a moving mass; move down under gravity force, giving out energy. The Tower thus accelerates or sustains the speed a rolling unit, and while decelerating, recover the kinetic energy. Speeds of 360 kmph can be attained. Recovery of energy varies from 98.5-70%; the longer the distance between stops, the lesser is recovery. The economical, omnipresent & eternal Gravity Power grants energy independence to many a nation. Global warming reduces.
Purpose: Accurate monitoring of information from various agricultural vehicles is one of the most important factors for appropriate management strategy of field operations. While there has been a number of study and design on applications of sensors and actuators for data acquisition and control system in tractor, incompatibility between various customized hardware and software has become a major obstacle to the universal deployment in real field operation. International standard for implementation of electronic control unit (ECU) in agricultural vehicles has becoming a mandatory requirement for inter-operation compatibility in the international trade of agricultural vehicle industries. The ISO 11783 standard is basically based upon well known communication technology designated using the controller area network (CAN) bus. While CAN bus could provide 1.0 Mbps of communication speed, the standard only recommended 250 kbps. Methods: This study presents the implementation and evaluation of ISO 11783 for tractor electronic control units (TECU)with a higher transmission rate from multiple ECU than 250 kbps. Throughput and loss rate of the developed prototype were calculated across manipulated bus load for laboratory experimental tests, and the maximum requirement of transmission rate by ISO 11873 was satisfied with lower than 60% of bus load. Results: Field tests with a TECU implemented to process messages from global positioning system (GPS) receiver resulted that the root mean square error of position information was lower than 4 m with 0.5 m/s as a travelling speed. Conclusions: Results of this study represent the utilization of the international standard ISO 11783 to providepractical developments in terms with the inter-operability of TECU.
Total Maximum Daily Load(TMDL) is a core basin management system to assign total emissions of pollutants to unit basin and emission source within a limit of the target water quality and to secure sustainability. considering "Environment and development" together. By current technical guidance of TMDL, the water quality in the riverbed of which the target water quality is noticed, must achieve the target; and the water quality standard for evaluating achievement of the target should be prescribed as non-excessive probability quality of water on the basis of the pertinent water quality documents. Therefore, the study calculated the target water quality by each unit basin which the target water quality must be noticed through the analysis of probability for water quality documents in rivers at the time of establishing a plan, and the study evaluated the achievement possibility of the target water quality by analyzing and comparing the target water quality plan with the standard water quality to evaluate the achievement of the target water quality. As the result, applying the proposed method to Mihocheon River system, it is concluded that selected the target water quality (Each BOD 3.3mg/1 and BOD 3.0mg/1) in Miho A and Musim A is available. Of course, it showed that the target water quality: BOD 2.5mg/1 in Miho A and BOD 3.0mg/1 in Musim A, could be achieved if the small reduction in B unit area was implemented.
This study was conducted to performance appraisal of Total Maximum Daily Loads (TMDLs), especially in terms of performance on development & reduction plan and water quality status of unit watershed. Because load allocations for pollution sources were predicted redundantly by uncertainty of prediction, TMDLs master plan has been frequently changed to acquire load allocation for local development. Therefore, It need to be developed more resonable prediction techniques of water pollution sources to preventing the frequent change. It is suggested that the reduction amount have to be distributed properly during the planning period. In other words, it has not to be concentrated on the specific year (especially final year of the planning period). The reason why, if the reduction amount concentrate on the final year of the planning period, allotment loading amount could not be achieved in some cases (e.g., insufficiency of budget, extension of construction duration). If the development plan was developed including uncertain developments, it is necessary to be developed reduction plan considered with them. However, some of the plans in the reduction plan could not be accomplished in some case. Because, it is not considered financial abilities of local governments. Consequently, development plan must be accomplished to avoid uncertain developments, and to consider financial assistance to support the implementation of effective plan. Water quality has been improved in many unit watersheds due to the TMDLs, especially in geum river and yeongsang/seomjin river.
In this paper, a grid connected microgrid with multiple inverter-based distributed generators (DGs) is considered. DG in FFC mode regulates the microgrid as a controllable load from the utility point of view as long as its output is within the capacity limit. The transition mode causes a change in frequency of microgrid due to the loss of power transferred between main grid and microgrid. Frequency deviation from the nominal value can exceed the limit if the loss of power is large enough. This paper presents a coordinated control method for inverter-based DGs so that the microgrid is always regulated as a constant load from the utility viewpoint during grid connected mode, and the frequency deviation in the transition mode is minimized. DGs can share the load by changing their control modes between UPC and FFC and stabilize microgrid during transition.
Real-Time applications on Grid environment have several problems in terms of resource management addressed as follows; (1) dynamic resource allocation to provide QoS objectives, (2) heterogeneous resources that is different scale, or capacity in same unit, and (3) resource availability, and resource needs. This paper describes the techniques of resource manager (RM) handling above problems to support QoS of dynamic real-time applications on Grid. The contributions of this paper to solve problems are as follows: unification of dynamic resource requirements among heterogeneous hosts, control of resources in heterogeneous environments, and dynamic load balancing/sharing. Our heuristic allocation scheme works not only 257% better than random, 142% better than round robin, and 36.4% better than least load in QoS sensitivity, but also 38.6% better than random, 28.5% better than round robin, and 31.6% better than least load in QoS.
International Journal of Fuzzy Logic and Intelligent Systems
/
제14권4호
/
pp.305-312
/
2014
This paper discusses real-time peak shaving algorithms for a large-scale battery energy storage system (BESS). Although several transmission and distribution functions could be implemented for diverse purposes in BESS applications, this paper focuses on a real-time peak shaving algorithm for an energy time shift, considering wind power generation. In a high wind penetration environment, the effective load levels obtained by subtracting the wind generation from the load time series at each long-term cycle time unit are needed for efficient peak shaving. However, errors can exist in the forecast load and wind generation levels, and the real-time peak shaving operation might require a method for wind generation that includes comparatively large forecasting errors. To effectively deal with the errors of wind generation forecasting, this paper proposes a real-time peak shaving algorithm for threshold value-based peak shaving that considers fuzzy wind power generation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.