Although recently revised building code requires 15~20% increased thermal insulation performance for window systems, since the code is focusing on winter heat loss, it is not satisfactory to contribute on reducing rapidly rising cooling load in summer. Window systems have great impact on building heat gain and loss. Therefore technological development for window system specialized in shading solar gain in summer is an urgent matter. This study evaluates the performance of sun shading and thermal insulation for blind integrated window system. Also, computer simulation evaluates the effect of heating and cooling energy consumption reduction for an individual unit(floor area of $85m^2$) of a multi-family housing. Physibel Voltra, a heat transfer analysis software, was used to analyse the effect of energy consumption reduction, and the energy load was converted to the cost to compare the actual effect of economical benefit.
This paper describes the result of structure analysis of secondary bogie frame. The purpose of the analysis is to evaluate an safety which secondary bogie frame shall be considered fully sufficient rigidity so as to satisfy proper system function under maximum load. Secondary bogie system consist of bogie frame, suspensions, wheel-sets, and brake system. Among these component, the bogie frame is most significant component subjected to the vehicle and passenger loads. The evaluation method is used the JIS E 4207 specification throughout the FEM analysis. The analysis results have been very safety and stable for design load conditions.
As development of industry is accelerated, most electricity load system requires power supply that could be high precision and effective control. Among supply and control unit of suitable power supply in these load characteristic, inverter systems of constant current regulate is used widely control of lighting & beaconing of aerodromes and electric heating system. Therefore, in this paper proposed a inverter systems of constant current regulate that using improved measurement and switching techniques. Proposed measure techniques that used moving average method of instantaneous r.m.s. for measuring current sensing improved response and precision. Also, in this paper proposed improved high effectiveness switching techniques that get high efficiency of inverter by the double-carrier modulation. Results of an experiment proved effect of proposed system.
The design of Intelligent Energy Saving Power System Controller (IESPSC) for Telecom DC power plants is proposed and presented in this paper. From the past experience. rectifiers for Telecom DC power plants have been operated inefficiently at light loads. IESPSC offers "novel load sharing" approach based on the knowledge of each unit's efficiency of paralleled rectifiers. Neural networks is used for identifying each rectifier's efficiency characteristic curve corresponding to load currents, which is in turn utilized to produce a system efficiency close to the maximum under all operating conditions. In addition, by limiting the number of operating units to the minimum while maintaining high efficiency at the determined loads, a drastic savings in operating cost can be achieved.
To cope with increasing power demand in metropolitan area, the power system in Korea has equipped with unit generator of large capacity, high density and uneven distribution, and transmission line of long distance, large capacity and high voltage. As the power system growing up enormous, it has become difficult to maintain the standard voltage in case of radical fluctuation of load or severe change of voltage by power system fault for its weakness of responsive characteristics although the power condenser has been installed to solve the unstability by lack of reactive power. Consequently, we review harmonic wave production and control characteristics to solve unstability problem of voltage in northern metropolitan, to reduce transmission restriction cost and to minimize load shedding by relocation of SVC (Static Var Compensator), which is highly effective for improvement of responsive characteristics for radical voltage fluctuation.
이기종 워크스테이션 클러스터링은 병렬 응용 처리에 유용하며 비용 측면에서 효과적이다. 이기종 워크스테이션 클러스터링 환경에서 최소의 전체 작업 반환 시간이 되도록 하기 위해서는 부하 균형 시스템이 필요하다. 다른 사용자들, 그룹들, 다른 작업 요구들, 그리고 다른 처리능력을 가지는 각 워크스테이션들은 클러스터링 환경의 다른 그것과 상대적이다. 기존 방식은 각 워크스테이션의 처리능력에 가중치를 미리 부여하는 정적 방식이거나 각 워크스테이션의 상대적 처리능력을 얻기 위해서 벤치마크 프로그램을 수행하는 동적 방식이다. 수행되는 응용과는 관계없는 벤치마크 프로그램은 계산시간을 소비하고 전체 작업 반환 시간을 지연시킨다. 이 논문은 효과적 작업 분배 방식을 제안하고 이기종 워크스테이션 클러스터링 환경에서 부하 균형 시스템을 구현한다. 이 논문에서 제안한 방식의 전체 작업 반환 시간은 부하 균형을 하지 않은 방식뿐만 아니라 벤치마크 프로그램에 의한 부하균형 방식과도 비교한다. 실험을 통하여 비교한 방식보다 제안 방식의 결과가 우수함을 보인다.
본 논문에서는 $0.35{\mu}m$ CMOS 공정을 이용하여 태양 에너지 하베스팅을 위한 에너지 관리 시스템을 설계하였다. 태양 에너지 관리 시스템은 ISC(Integrated Solar Cell), voltage booster, MPPT(Maximum Power Point Tracker) control unit으로 구성된다. ISC의 개방전압은 약 0.5V이고, 단락 전류는 약 $15{\mu}A$이다. Voltage booster는 뒷단에 약 1.5V로 승압된 전압을 공급한다. MPPT control unit은 ISC가 MPP점에 도달 하였을 때, load로 전력이 전달될 수 있도록 pMOS 스위치를 동작시킨다. SEMU(Solar Energy Management Unit)의 크기는 패드를 포함하여 $360{\mu}m{\times}490{\mu}m$이다. ISC의 면적은 $500{\mu}m{\times}2000{\mu}m$이다. 제작된 칩을 측정한 결과 설계된 SEMU가 ISC에서 수확된 에너지에 대해 MPPT control 동작을 제대로 수행하는 것을 확인하였다. 측정된 MPP 전압범위는 약 370mV∼420mV이다.
우리나라에서 시행중인 수질오염총량관리제도는 수계 내 모든 유역을 단위유역으로 구분하고 단일 공통 오염물질과 유량조건을 고려하여 본류 중심으로 관리하고 있다. 이러한 수질오염총량관리제도는 지역 및 단위유역의 특성 변화를 반영하지 못하며 관리수계 내 목표수질을 유지한다고 하더라도 각 단위유역에서의 수질변화 여건에 따라서 지류에서 발생되는 오염물질의 부하량 변화를 직접적으로 반영하기 어려운 실정이다. 이를 개선하기 위해서 오염도가 높은 지류의 총량관리를 위한 지류총량제도의 추가 도입이 필요한 실정이다. 본 연구에서는 지류에서의 수질변화 양상이 본류에 미치는 영향을 분석하기 위해서 팔당수계내 3개의 주요 중권역인 남한강 하류, 경안천, 북한강 유역을 대상으로 53개의 소유역으로 구축하여 유역유출모형인 HSPF (Hydrological Simulation Program-Fortran) 모형을 적용하였다. 모의결과 BOD는 0.17 mg/L - 4.30 mg/L의 범위로 전반적으로 지류에서 높게 생성되어 하류 유역으로 갈수록 낮아졌다. T-P는 0.02 mg/L - 0.22 mg/L의 범위로 도시화 및 축산업 등의 영향이 큰 유역은 높게 나타나고 북한강 유역은 전반적으로 낮게 나타났다. 또한, 각 단위 유역별로 배출되는 오염부하량 변화에 따른 수질 변화를 분석하기 위해 오염원 저감 시나리오를 선정하였다. 시나리오별 모의결과 BOD와 T-P의 저감률은 북한강 하류유역과 경안천 중·하류 유역에서 크게 나타났다. 이는 각 소유역별 수질 개선의 노력에 따른 수질 저감의 혜택은 각 본류 하천의 중·하류에서 가장 크게 받는 것으로 나타났으며 지류총량관리를 위한 기초자료가 될 수 있다고 판단된다.
Wind energy is rapidly becoming significant generating technologies in electricity markets. As probabilistic nature of wind energy creates many uncertainties in the short-term scheduling, additional actions for reliable market operation should be taken. This paper presents a novel approach to evaluate ramping capability requirement for changes in imbalance energy between day-ahead market and real-time market due to uncertainty of wind generation as well as system load. Dynamic ramp rate model has been applied for realistic solution in unit commitment problem, which is implemented in day-ahead market. Probabilistic optimal power flow has been used to verify ramping capability determined by the proposed method is reasonable in economic and reliable aspects. This approach was tested on six-bus system and IEEE 118-bus system with a wind farm. The results show that the proposed approach provides ramping capability information to meet both forecasted variability and desired confidence level of anticipated uncertainty.
In general, Power SCR(Silicon Controlled Rectifier) is most widely used in Power Plant as well as Industrial field. It has been controlled and operated according to its own control method. Especially, in case of Power plant, it plays a major role in AVR(Automatic Voltage Regulator) or electro chlorination control circuits. Generally, they used in Analog control system at above field. But each SCR current value is different because of load unbalance or switching characteristic variations, it may cause power plant unit trip or system disorder according to SCR element burn out or bad operating condition. Therefore, in this paper a development of 3 phase current balance control unit is described, it gets over the past analog control system limit, uses DSP(Digital signal processor) had high speed response, controls SCR gate firing angle for 3 phase current balance.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.