1 |
L. Xie, P. M. S. Carvalho, L. A. F. M Ferreira, J. Liu, B. H. Krogh, N. Popli, M. D. Ilic, "Wind integration in power systems: operational challenges and possible solutions", Proceedings of the IEEE, Vol. 99, No. 1, pp. 214-232, January 2011.
DOI
ScienceOn
|
2 |
T. Gul and T. Stenzel, "Variability of wind power and other renewables-management options and strategies", International Energy Agency, Paris, France, 2005.
|
3 |
Y.C. Kang, Y.H. Kim, M.S. Y, "Rise of wind energy penetration level and wind energy grid-adaptive technologies", World of Electricity, Vol. 60, No. 11, pp. 20-28, 2011.
|
4 |
T. Senjyu, K. Shimabukuro, K. Uezato, and T. Funabashi, "A fast technique for unit commitment problem by extended priority list", Power Systems, IEEE Transactions on, Vol. 18, No. 2, pp. 882-888, 2003.
DOI
ScienceOn
|
5 |
W. L. Snyder, H. D. Powell, and J. C. Rayburn, "Dynamic programming approach to unit commitment", Power Systems, IEEE Transactions on, Vol. 2, No. 2, pp. 339-348, 1987.
DOI
ScienceOn
|
6 |
J.K. Lyu, M.K. Kim, Y.T. Yoon, J.K. Park, "A new approach to security-constrained generation scheduling of large-scale power systems with a piecewise linear ramping model", Electrical Power and Energy Systems, Vol. 34, No.1, pp. 121-131, 2012.
DOI
ScienceOn
|
7 |
W. Ongsakul and N. Petcharaks, "Unit commitment by enhanced adaptive Lagrangian relaxation", Power Systems, IEEE Transactions on, Vol. 19, No. 1, pp. 620-628, 2004.
DOI
ScienceOn
|
8 |
K. Y. Lee and M. A. El-Sharkawi, Modern heuristic optimization techniques: theory and applications to power systems vol. 39: Wiley-IEEE press, 2008.
|
9 |
Federal Energy Regulatory Commission, "Frequency Regulation Compensation in the Organized Wholesale Power Markets", RM11-7-000, 2011.
|
10 |
R.D. Masiello, W.P. Katzenstein, "Adapting AGC to Manage High Renewable Resource Penetrations", IEEE General Meeting 2012.
|
11 |
K.H. Abdul-Rahman, H. Alarian, B. Vesovic, B. Lu, "Enhanced System Reliability Using Flexible Ramp Constraint In CAISO market", IEEE General Meeting 2012.
|
12 |
Y.G. Park, J.B Park, J.H. Roh, H.J. Kim, J.S. Kim, "Multi-Stage Generation Allocation Game Considering Ramp-rate Constraints", Trans. KIEE, Vol. 60, No. 3, pp. 509-516, 2011.
과학기술학회마을
DOI
ScienceOn
|
13 |
D. Villanueva, J.L. Pazos, A. Feijoo, "Probabilistic load flow including wind power generation", IEEE Trans Power Syst, Vol. 26, No. 3, pp. 1659-1667, 2011.
|
14 |
J.K. Lyu, J.H. Heo, J.K. Park, "Probabilistic Active and Reactive Optimal Power Dispatch considering Wind Speed Correlation and Wake Effect", International Conference on Wind energy Grid-Adaptive Technologies 2012, October, 2012.
|
15 |
J.H. Yoo, "Roadmap of offshore wind power in Korea", Electricity Journal, No. 408, pp. 56-59, 2010.
|
16 |
L. Wu, M. Shahidehpour, T. Li, "Stochastic Security-Constrained Unit Commitment", Trans Power Syst, Vol. 22, No. 2, pp. 800-811, 2007.
DOI
ScienceOn
|
17 |
A. Zervos, C. Lins, J. Muth, "RE-thinking 2050: a 100% renewable energy vision for the European Union", EREC, 2010.
|