Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.28
no.6
/
pp.21-29
/
2014
In this paper examine the characteristics of the generator supplying the most significant electrical energy in some parts required to drive the vehicle, and it is focused on to fabricate a performance evaluation unit for developing alternator with better performance. Through performance tests in accordance with the electrical load of alternators that is made in Valeo Corp. and Denso Corp., which are currently applied by H Corp., the fabricated performance evaluation unit has measured the power generation amount of the electrical energy supplied from the alternator, and it was analyzed. On the basis of this result, and to understand the flow of electrical energy of the vehicle, furthermore, it is intended to verify the usefulness of the performance evaluation unit which is designed in this paper. In this paper, based on the mechanism of the proposed performance evaluation unit, it will try to learn the convergence technology that can be applied to the design of the performance evaluation unit of other components of the vehicle.
Korean Journal of Air-Conditioning and Refrigeration Engineering
/
v.22
no.7
/
pp.429-435
/
2010
Although recently revised building code requires 15~20% increased thermal insulation performance for window systems, since the code is focusing on winter heat loss, it is not satisfactory to contribute on reducing rapidly rising cooling load in summer. Window systems have great impact on building heat gain and loss. Therefore technological development for window system specialized in shading solar gain in summer is an urgent matter. This study evaluates the performance of sun shading and thermal insulation for blind integrated window system. Also, computer simulation evaluates the effect of heating and cooling energy consumption reduction for an individual unit(floor area of $85m^2$) of a multi-family housing. Physibel Voltra, a heat transfer analysis software, was used to analyse the effect of energy consumption reduction, and the energy load was converted to the cost to compare the actual effect of economical benefit.
Proceedings of the Korean Society of Precision Engineering Conference
/
2005.06a
/
pp.1402-1405
/
2005
This paper describes the result of structure analysis of secondary bogie frame. The purpose of the analysis is to evaluate an safety which secondary bogie frame shall be considered fully sufficient rigidity so as to satisfy proper system function under maximum load. Secondary bogie system consist of bogie frame, suspensions, wheel-sets, and brake system. Among these component, the bogie frame is most significant component subjected to the vehicle and passenger loads. The evaluation method is used the JIS E 4207 specification throughout the FEM analysis. The analysis results have been very safety and stable for design load conditions.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.56
no.4
/
pp.173-178
/
2007
As development of industry is accelerated, most electricity load system requires power supply that could be high precision and effective control. Among supply and control unit of suitable power supply in these load characteristic, inverter systems of constant current regulate is used widely control of lighting & beaconing of aerodromes and electric heating system. Therefore, in this paper proposed a inverter systems of constant current regulate that using improved measurement and switching techniques. Proposed measure techniques that used moving average method of instantaneous r.m.s. for measuring current sensing improved response and precision. Also, in this paper proposed improved high effectiveness switching techniques that get high efficiency of inverter by the double-carrier modulation. Results of an experiment proved effect of proposed system.
The design of Intelligent Energy Saving Power System Controller (IESPSC) for Telecom DC power plants is proposed and presented in this paper. From the past experience. rectifiers for Telecom DC power plants have been operated inefficiently at light loads. IESPSC offers "novel load sharing" approach based on the knowledge of each unit's efficiency of paralleled rectifiers. Neural networks is used for identifying each rectifier's efficiency characteristic curve corresponding to load currents, which is in turn utilized to produce a system efficiency close to the maximum under all operating conditions. In addition, by limiting the number of operating units to the minimum while maintaining high efficiency at the determined loads, a drastic savings in operating cost can be achieved.
To cope with increasing power demand in metropolitan area, the power system in Korea has equipped with unit generator of large capacity, high density and uneven distribution, and transmission line of long distance, large capacity and high voltage. As the power system growing up enormous, it has become difficult to maintain the standard voltage in case of radical fluctuation of load or severe change of voltage by power system fault for its weakness of responsive characteristics although the power condenser has been installed to solve the unstability by lack of reactive power. Consequently, we review harmonic wave production and control characteristics to solve unstability problem of voltage in northern metropolitan, to reduce transmission restriction cost and to minimize load shedding by relocation of SVC (Static Var Compensator), which is highly effective for improvement of responsive characteristics for radical voltage fluctuation.
The clustering environment with heterogeneous workstations provides the cost effectiveness and usability for executing applications in parallel. The load balancing is considered as a necessary feature for the clustering of heterogeneous workstations to minimize the turnaround time. Since each workstation may have different users, groups. requests for different tasks, and different processing power, the capability of each processing unit is relative to the others' unit in the clustering environment Previous works is a static approach which assign a predetermined weight for the processing capability of each workstation or a dynamic approach which executes a benchmark program to get relative processing capability of each workstation. The execution of the benchmark program, which has nothing to do with the application being executed, consumes the computation time and the overall turnaround time is delayed. In this paper, we present an efficient task distribution method and implementation of load balancing system for the clustering environment with heterogeneous workstations. Turnaround time of the methods presented in this paper is compared with the method without load balancing as well as with the method load balancing with performance evaluation program. The experimental results show that our methods outperform all the other methods that we compared.
Journal of the Institute of Electronics Engineers of Korea SC
/
v.48
no.2
/
pp.15-21
/
2011
In this paper, an energy management circuit for solar energy harvesting system is designed in $0.35{\mu}m$ CMOS technology. The solar energy management system consists of an ISC(Integrated Solar Cell), a voltage booster, and an MPPT(Maximum Power Point Tracker) control unit. The ISC generates an open circuit voltage of 0.5V and a short circuit current of $15{\mu}A$. The voltage booster provides the following circuit with a supply voltage about 1.5V. The MPPT control unit turns on the pMOS switch to provide the load with power while the ISC operates at MPP. The SEMU(Solar Energy Management Unit) area is $360{\mu}m{\times}490{\mu}m$ including pads. The ISC area is $500{\mu}m{\times}2000{\mu}m$. Experimental results show that the designed SEMU performs proper MPPT control for solar energy harvested from the ISC. The measured MPP voltage range is about 370mV∼420mV.
Song, Chul Min;Kim, Jung Soo;Lee, Min Sung;Kim, Seo Jun;Shin, Hyung Seob
Ecology and Resilient Infrastructure
/
v.9
no.1
/
pp.1-14
/
2022
The total maximum daily load (TMDL) implemented in Korea mainly manages the mainstream considering a single common pollutant and river discharge, and the river system is divided into unit watersheds. Changes in the water quality of managed rivers owing to the water quality management in tributaries and unit watersheds are not considered when implementing the TMDL. In addition, it is difficult to consider the difference in the load of pollutants generated in the tributary depending on the conditions of the water quality change in each unit watershed, even if the target water quality was maintained in the managed water system. Therefore, it is necessary to introduce the total maximum load management at tributaries to manage the pollution load of tributaries with a high degree of pollution. In this study, the HSPF model, a watershed runoff model, was applied to the target areas consisting of 53 sub-watersheds to analyze the effect of water quality changes the in tributaries on the mainstream. Sub-watersheds were selected from the three major areas of the Paldang water system, including the drainage basins of the downstream of the South Han-River, Gyeongan stream, and North Han-River. As a result, BOD ranged from 0.17 mg/L to 4.30 mg/L, and was generally high in tributaries and decreased in the downstream watershed. TP ranged from 0.02 mg/L - 0.22 mg/L, and the watersheds that had a large impact on urbanization and livestock industry were high, and the North Han-River basin was generally low. In addition, a pollution source reduction scenario was selected to analyze the change in water quality by the amount of pollution load discharged at each unit watershed. The reduction rate of BOD and TP according to the scenario changes was simulated higher in the watershed of the downstream of the North Han-River and downstream and midstream of the Gyeongan stream. It was found that the benefits of water quality reduction from each sub-watershed efforts to improve water quality are greatest in the middle and downstream of each main stream, and it is judged that it can be served as basic data for the management of total tributaries.
The Transactions of The Korean Institute of Electrical Engineers
/
v.62
no.4
/
pp.457-466
/
2013
Wind energy is rapidly becoming significant generating technologies in electricity markets. As probabilistic nature of wind energy creates many uncertainties in the short-term scheduling, additional actions for reliable market operation should be taken. This paper presents a novel approach to evaluate ramping capability requirement for changes in imbalance energy between day-ahead market and real-time market due to uncertainty of wind generation as well as system load. Dynamic ramp rate model has been applied for realistic solution in unit commitment problem, which is implemented in day-ahead market. Probabilistic optimal power flow has been used to verify ramping capability determined by the proposed method is reasonable in economic and reliable aspects. This approach was tested on six-bus system and IEEE 118-bus system with a wind farm. The results show that the proposed approach provides ramping capability information to meet both forecasted variability and desired confidence level of anticipated uncertainty.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.