• Title/Summary/Keyword: underwater work

Search Result 187, Processing Time 0.022 seconds

A Simple Volume Tracking Method For Compressible Two-Phase Flow

  • SHYUE KEH-MING
    • Journal of The Korean Astronomical Society
    • /
    • v.34 no.4
    • /
    • pp.237-241
    • /
    • 2001
  • Our goal is to present a simple volume-of-fluid type interface-tracking algorithm to compressible two-phase flow in two space dimensions. The algorithm uses a uniform underlying Cartesian grid with some cells cut by the tracked interfaces into two subcells. A volume-moving procedure that consists of two basic steps: (1) the update of volume fractions in each grid cell at the end of the time step, and (2) the reconstruction of interfaces from discrete set of volume fractions, is employed to follow the dynamical behavior of the interface motion. As in the previous work with a surface-tracking procedure for general front tracking (LeVeque & Shyue 1995, 1996), a high resolution finite volume method is then applied on the resulting slightly nonuniform grid to update all the cell values, while the stability of the method is maintained by using a large time step wave propagation approach even in the presence of small cells and the use of a time step with respect to the uniform grid cells. A sample preliminary numerical result for an underwater explosion problem is shown to demonstrate the feasibility of the algorithm for practical problems.

  • PDF

The characteristic analysis of noise and vibration in training ship (실습선의 소음과 진동 특성 해석)

  • Kang, Chang-Nam
    • Proceedings of the KIEE Conference
    • /
    • 2006.07b
    • /
    • pp.1012-1013
    • /
    • 2006
  • Marine technology must advance to meet the needs of a wealthier and more demanding public while at the same time provide greater environmental protection. Pollution noise and vibration is the specific issue being discussed in this paper Noise is of course due to vibration from high speed engines driving generators, entilators, winch and other gear, while underwater noise pollution results from the propellers and the resistance produced by the hull of the ship moving through the water. Vibration is also a factor in potential damage to sensitive electronic gear and metal fatigue. The issue of noise pollution does not cease when a vessel enters her berth and the main engines shut down. There is still the matter of ventilation and other mechanical factors at work to maintain a comfortable, efficient environment. We measured the noise level and vibration displacement in the training ship A-Ra at underway and Berth. The authors analyzed the frequency of noise and maximum vibration displacement in the position.

  • PDF

A Research on the Mathematical Modeling for the Estimation of Underwater Vehicle's Tail Plane Efficiency (수중함의 함미타 효율추정을 위한 수학모델링에 관한 연구)

  • Shin, Yong-Ku;Lim, Kyung-Sik;Lee, Seung-Keon
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.42 no.3
    • /
    • pp.190-196
    • /
    • 2005
  • The ratio between the hydrodynamic force produced by a submarine tau appendage and that acting on an equivalent appendage in isolation is regarded as tail plane efficiency. It is an important parameter in numerical simulations because it has a significant effect on predicted stability, controllability, and maneuverability. The paper introduces some recent work to improve the reliability and general applicability of current methods of tail plane efficiency estimation.

Vibration Reduction of Beam Structure Using Squeeze Mode ER Mount (압착모드형 ER마운트를 이용한 보 구조물의 진동저감 해석)

  • 정우진;김두기;정의봉;홍성룡;최승복
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.12 no.7
    • /
    • pp.557-564
    • /
    • 2002
  • To reduce unwanted vibrations in war ship which may be transmitted through underwater path, it is required to use high damping mounts to isolate the vibration. In this work, the beam structure with squeeze mode ER mount is proposed and response characteristics such as acceleration and force transmissibility of beam with constant voltage and optimal controller are experimentally analyzed. The controller is empirically realized and control responses are evaluates in frequency domains. Experiments show vibration reduction capability of squeeze mode ER mount.

A review of missing video frame estimation techniques for their suitability analysis in NPP

  • Chaubey, Mrityunjay;Singh, Lalit Kumar;Gupta, Manjari
    • Nuclear Engineering and Technology
    • /
    • v.54 no.4
    • /
    • pp.1153-1160
    • /
    • 2022
  • The application of video processing techniques are useful for the safety of nuclear power plants by tracking the people online on video to estimate the dose received by staff during work in nuclear plants. Nuclear reactors remotely visually controlled to evaluate the plant's condition using video processing techniques. Internal reactor components should be frequently inspected but in current scenario however involves human technicians, who review inspection videos and identify the costly, time-consuming and subjective cracks on metallic surfaces of underwater components. In case, if any frame of the inspection video degraded/corrupted/missed due to noise or any other factor, then it may cause serious safety issue. The problem of missing/degraded/corrupted video frame estimation is a challenging problem till date. In this paper a systematic literature review on video processing techniques is carried out, to perform their suitability analysis for NPP applications. The limitation of existing approaches are also identified along with a roadmap to overcome these limitations.

Analysis of the commercial diving national qualification system for the introduction of a diving supervisor (잠수기능장 제도 신설을 위한 산업 잠수 국가자격체계 분석)

  • Sim, Kyoung-Bo;Cha, Joo-Hong;Kang, Sin-Young
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.40 no.7
    • /
    • pp.655-662
    • /
    • 2016
  • This study proposes that a diving supervisor, who can perform the role of both a field manager and a supervisor, be introduced in the national qualification system. The goal was achieved by surveying the general status of the commercial diving sector, including the statistics of an underwater construction company, commercial diving equipment operation condition, diver working hours, diver supply and demand status, and underwater construction market size. The national qualification and national competency standard (NCS) systems were also analyzed to deduce the role definition and work scope of the diving supervisor. Consequently, the following proposition is made: the diving supervisor should be an "on-site manager with the highest job skill in the commercial diving field, who can perform the on-site process management as well as guide, supervise, and educate project participants and serve as an intermediary between the contractor and the workers." The responsibilities of the diving supervisor are proposed to include "diving planning and operation of the diving team," "diving with surface-supplied air and mixed-gas diving system," "chamber operation," "underwater construction," and "ship salvage." The persistent issues in commercial diving sectors, such as diver career development, management, and worker supervision, are expected to be largely resolved with the introduction of this qualification.

Mix Design of Polymer Grouting Mortar for Prepacked Concrete Using Polymer Dispersions (폴리머 디스퍼션을 이용한 프리팩트 콘크리트용 주입 모르타르의 배합에 관한 연구)

  • Jo, Young-Kug;Kim, Wan-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.5
    • /
    • pp.85-91
    • /
    • 2008
  • Prepacked concrete has recently been used in the special constructions fields such as underwater concrete work, heavy-weight concrete work, underground structure work, partial repair works for damaged reinforced concrete structures. and polymer-modified mortars have been employed as grouting mortars for the prepacked concrete. The purpose of this study is to recommend the optimum mix design of polymer-modified grouting mortars for prepacked concrete. Polymer-modified mortars using SBR and EVA emulsions as admixture of grouting mortars for prepacked concrete are prepared with various mix proportions such as sand-binder ratio, fly ash replacement ratio, polymer-binder ratio. and tested for flowability, viscosity of grouting mortars, bleeding ratio, expansion ratio, flexural and compressive strengths of grouting mortars and compressive and tensile strengths of prepacked concretes. From the test results, it is apparent that polymer-modified mortars can be produced as grouting mortars when proper mix design is chosen. We can design the mix proportions of high strength mortars for prepacked concrete according to the control of mix design factors such as type of polymer, polymer-binder ratio, sand-binder ratio and fly ash replacement ratio. Water-binder ratio of plain mortars for a constant flowability value are in the ranges of 43% to 50%. SBR-modified mortar has a little water-binder ratios compared to those of plain mortar, however, EVA-modified mortar needs a high water-binder ratio due to a high viscosity of polymer dispersion. The expansion and bleeding ratios of grouting mortars are also controlled in the proper value ranges. Polymer-modified grouting mortars have good flexural. compressive and tensile strengths, are not affected with various properties with increasing fly ash replacement to cement and binder-sand ratio. In this study, SBR-modified grouting mortar with a polymer-binder ratio of 10% or less, a fly ash replacement of 10% to cement and a sand-binder ratio of 1.5 is recommended as a grouting mortar for prepacked concrete.

Development of Dry Process Caisson Method for Maintenance of Submerged Harbor Structure (수중 항만구조물의 유지보수를 위한 건식 케이슨 공법 개발)

  • Lee Joong-Woo;Oh Dong-Hoon;Kwak Seung-Kyu;Kim Sung-Tae
    • Journal of Navigation and Port Research
    • /
    • v.30 no.6 s.112
    • /
    • pp.447-455
    • /
    • 2006
  • Together with the trend of enhancement in domestic industrial development and economic progress due to import and export, the demand for construction of the roads, bridges, especially port facilities, and several coastal protection and ocean structures is increasing rapidly. MOMAF of Korean Government is driving construction cf 9 new ports and renovation cf the existing fishery ports. Among these structures most of bridge base, wharves, dolphins, quays, and jetties are being newly built cf steel or concrete pile. As the base, supporting bulkheads, and piles are underwater after construction, it is difficult to figure out the status of structures and not enough to get maintenance and strengthen the structures. Every year, moreover, these works suck the government budget due to higher incomplete maintenance expense for protection from corrosions cf structures and increased underwater construction period. For the purpose cf cutting down the expense cf government budget, it is necessary to extend the life cycle of the existing structures. Therefore, we developed a new method for maintenance of submerged structures near the waterline by allowing dry work environment with the floating caisson. The method shows easy to move around the working area and handle. It also showed not only a significant reduction of maintenance expenses and time for anti-corrosion work but also better protection This will be a milestone to reduce the maintenance and construction expenses for the shore and water structures.

Development of Dry Process Caisson Method for Maintenance of Submerged Harbor Structure (수중 항만구조물의 유지보수를 위한 건식 케이슨 공법 개발)

  • Lee Joong-Woo;Oh Dong-Hoon;Kwak Seung-Kyu;Kim Sung-Tae
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2006.06b
    • /
    • pp.163-170
    • /
    • 2006
  • Together with the trend of enhancement in domestic industrial development and economic progress due to import and export, the demand for construction of the roads, bridges, especially port facilities, and several coastal protection and ocean structures is increasing rapidly. MOMAF of Korean Government is driving construction of 9 new ports and renovation of the existing fishery ports. Among these structures most of bridge base, wharves, dolphins, quays, and jetties are being newly built of steel or concrete pile. As the base, supporting bulkheads, and piles are underwater after construction, it is difficult to figure out the status of structures and not enough to get maintenance and strengthen the structures. Every year, moreover, these works suck the government budget due to higher incomplete maintenance expense for protection from corrosions of structures and increased underwater construction period. For the purpose of cutting down the expense of government budget, it is necessary to extend the life cycle of the existing structures. Therefore, we developed a new method for maintenance of submerged structures near the waterline by allowing dry work environment with the floating caisson. The method shows easy to move around the working area and handle. It also showed not only a significant reduction maintenance expenses and time for anti-corrosion work but also better protection. This will be a milestone to reduce the maintenance and construction expenses for the shore and water structures.

  • PDF

A Proposition on Reasonable Termination Procedure in Remaining-oil Recovery Work from a Sunken Tanker in Korean Territory (국내 침몰유조선 잔존유 회수작업의 합리적 종료절차 제안)

  • Kang, Kwang-Gu;Shim, Yoo-Taek;Kang, Sin-Young
    • Journal of Navigation and Port Research
    • /
    • v.38 no.4
    • /
    • pp.379-384
    • /
    • 2014
  • In case of sunken tankers, remaining-oil recovery operation should be conducted due to possible oil spill accident. However, the deep sea operation make difficulties in checking the completion of remaining oil recovery process, therefore the work termination procedure is very important. In this paper, a reasonable work termination procedure through the comparison and analysis of two cases(Youil No.1 and Osung No.3, Kyung-Shin) which were performed in different method, using disparate equipment. By investigating previously applied methods and techniques, work speed, safety and expenses were compared. The proposed ending procedure of the remaining-oil recovery project is to recover the remaining oil from each cargo tanks and to clean up such tanks whilst an independent surveyor proceeds to a confirmation procedure whereby said surveyor checks out whether any remaining oil exists by putting a stick in each cleaned up tanks and opening up the hatch cover of the tanks or the top place of the tanks to confirm the cleanness of oil. Such procedure shall be done through discussion by the ordering party, contractor and the independent surveyor all together with a flexible application.