The Journal of the Convergence on Culture Technology
/
v.5
no.4
/
pp.87-92
/
2019
The purpose of this study is to investigate the preparation time of fire-fighting water for public fire hydrants and ground, underground fire hydrants. The equipment preparation time for stage 1 was 20.50 seconds for ground type and 24.67 seconds for underground type. The reason for this difference in preparation time is that an underground fire hydrant requires additional standpipes to connect to the main conduit of Paru and the underground hydrant, which open the manhole cover. Water tank Maintenance joint with water hose male coupling of the second stage was similar to that of the ground type of 48.50 seconds and underground water tipe of 49.00 seconds. This is because the operation of connecting the fire hose to the maintenance tank of the water tank car is the same. In the third stage, the water pipe connection was 43 seconds for ground type and 174.33 seconds for underground type. The reason why the time for connecting the water pipe to the fire hydrant is large difference is that the underground fire hydrant is opened by opening the manhole cover, After connecting the stand pipe to the fire hydrant, the additional process of connecting the water pipe to the stand pipe is required, which is considered to have greatly increased the time required. The opening of Water Control Valve and spindle Valve in the fourth stage was 66.50 seconds for the ground type and 78.83 seconds for the underground type. This difference is due to the fact that the spindle of the ground fire hydrant is located on the main body and can be easily opened, but the underground type is located next to the main body under the manhole and requires additional time to connect the opening equipment.
To use the earth heat for the livestock housing, an underground heat exchanger is developed and pipes are layed in the depth of 2.5m under the ground. The pipes have two different kinds of diameter (200mm, 100mm) and materials (PE, PVC). The results of heating effect in winter and spring are following. The temperature in different soil depth varies from 5$^{\circ}C$ by 1.5m depth, to 9$^{\circ}C$ by 3.5m. So it should be better to have the depth greater than 2.5m. The difference of air temperature between the inside and outside pipe was 9.9 Kelvin(K) with 200mm diameter and 13.4K with the 100mm diameter with the same material in winter. By the lower outside temperature from -7.2$^{\circ}C$, it could keep the air temperature above 6$^{\circ}C$ through the 100mm diameter pipe. The heating performance was 593 W with 200mm diameter, 118W with 100mm diameter (PE), and 115W with 100m diameter (PVC), respectively. As the outside temperature varies from -1.5$^{\circ}C$ to 18.6$^{\circ}C$ in early spring, the air temperature through the pipes show 4∼8$^{\circ}C$. While the difference between maximum and minimum outside temperature is 14K, the one through the pipes could be reduced by 2K. Pipes with small diameter can more reduce the difference than the pipe with larger diameter.
The method in a bid to make better use of limited urban space amidst increasingly expanding urban area have been attempted in various ways. Efficient using underground space is one of the examples. The pipe roof and excavation for underground crossing implemented in this study was the part of evaluation of such attempt. However, the pipe roof method for underground crossing may cause the ground surface to be uplifted or settled down, having effect on structure above the ground. Thus in this study, a laboratory model test designed to evaluate the effect on surface during implementing pipe roof and excavation was carried out. The ground displacement during pipe roof advancing and excavation is usually occurred in a radial shape but as the study focused on trackbed, the evaluation included ground settlement only. Thus, appropriately-scaled model was selected considering domestic geological characteristics and operation characteristics of traditional and high-speed rail trains and the qualitative evaluation of displacement was carried out with a certain ground loss depending on excavation after categorizing trackbed settlement pattern depending on depth of top soil.
KSCE Journal of Civil and Environmental Engineering Research
/
v.32
no.3A
/
pp.171-181
/
2012
The design of high strength underground septic tank stiffened by steel pipe is presented and the ultimate behavior is investigated according to the full scale experiments for three types of specimens. The limitation of the current design specification are pointed out and the general design procedure of private sewage treatment facility are newly developed considering thickness of FRP shell, types of steel pipe stiffer and diaphragm wall. The direct tensile and bending test for FRP material of septic tank were performed. The increase effect of ultimate strength due to the circular steel pipe are investigated by the full scale field test and compared with the results by the finite element analysis.
The use of natural light has the potential for improving both the energy efficiency and indoor environmental quality in buildings. A light-pipe system can introduce daylight to spaces that would otherwise not be able to benefit from the advantages of daylight penetration. For the light-pipe system to be widely used in Korea, it is important to quantify its daylighting performance with due consideration regarding the effects imposed by the local climate conditions. This paper presents the evaluation results of existing semi-empirical models to predict daylighting performance of a light-pipe system. The evaluation of the existing models was based on the monitoring data obtained from a underground parking lot in which the light-pipe system was installed. Comparisons were made between the predicted and the monitored data obtained from the study. The results indicated that semi-empirical models which was developed using the experimental data obtained under the Korean climatic conditions had a good prediction performance. We also quantified the effects caused by sky conditions, solar altitudes, room dimensions, and the aspect ratio of a light-pipe system on both the daylighting performance of the light-pipe system and the indoor illuminance distributions of the space using the semi-empirical model. Finally, this paper provides the design guideline of the light-pipe system for its application to an underground parking lot space.
This is intending to introducdine the pipe type 161KV underground cable system in Capital City of Seoul which will be constructed in 1972 or 1973 by Korea Electric Co using the AID loan and Won currency. In order to make readers to have an easy understanding and a clear view of underground cable transmission line, the first part will be for the introduction of the description on future underground cable system by Mr. E.H.F inch appeared on 1969 Sept. Consulatant Engineer. the second part will introduce our 161KV underground cable system in Seoul and it's feasibility study, and the third part will mention calculation methods of electrical properties of pipe type cable and the results of calculation of our own system.
Journal of Korean Tunnelling and Underground Space Association
/
v.12
no.5
/
pp.389-397
/
2010
This paper presents the effects of the tunnel stability using rebar steel pipe which is the steel pipe reinforced by rebar. In order to carry out this research, not only the theoretical and experimental study for bending stiffness of normal steel pipes and rebar steel pipes but also numerical analysis of tunnel stability are performed. It is clearly found from the results that 65% of bending stiffness of the rebar steel pipe is larger than that of the normal steel pipe. The results obtained from the numerical analysis of tunnel stability show that about 10% of tunnel stability is increased in case of the rebar steel pipe. The rebar steel pipe, therefore, may be very useful to develope the tunnel stability economically.
Recently, ground subsidence has been steadily occurring mainly in downtown areas, threatening the safety of citizens. Under the road, various underground facilities such as water supply pipe, sewage pipe, and communication pipe are buried. Due to the aging of these underground facilities and the reckless development of the underground, it is acting as a cause of ground subsidence. Although there is a result of analyzing the risk of ground subsidence according to the deterioration of the existing pipeline, there is no result of analyzing the risk of ground subsidence using the density of pipelines indicating ground disturbance. Therefore, in this study, the density of the underground space was analyzed using the data of six types of representative underground pipelines in Seoul, and a study was conducted on whether there is a correlation with the ground subsidence. As a result, it was found that the density of underground facilities is high in the area where the ground subsidence occurred, indicating that the density of pipelines have an effect on the ground subsidence.
Journal of the Korean Society for Precision Engineering
/
v.20
no.9
/
pp.63-69
/
2003
As increasing underground facilities, more effective management is needed nowadays. It is important to get an accurate information of underground facilities to manage that, so some methods of detecting location - electromagnetic induction method, ground penetration radar method, sound wave method - are used to obtain the information of underground facilities. In this study, a magnetic method to detect underground facilities was developed. In the magnetic method, underground facilities are detected by a detector and the magnetic marker which is a permanent magnet and used to marking the location by attaching underground facilities. A test field was constructed for experiment with the magnetic marker, PVC pipe, and steel pipe under ground 1.5m, and a ferromagnetic detector was used for measurement. Magnetic strengths of the magnetic marker were measured by the detector at each location in the test field, and analyzed by magnetic field analysis tool in the same condition. In the result, the underground pipes of 1.5m below were detectable within the deviation $\pm$0.2m. When For applying this method, it should be considered that ferromagnetic materials around the detector could affect a measured value.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.