• Title/Summary/Keyword: underground development

Search Result 1,084, Processing Time 0.026 seconds

Case Study on In-situ Stress Measurement by Over-coring and Its Application to Design of a Pumped Storage Power Plant (오버코어링법에 의한 초기지압측정 및 양수발전소 설계적용사례)

  • Kim, Dae-Young;Lee, Hong-Sung;Lee, Young-Nam
    • Tunnel and Underground Space
    • /
    • v.17 no.2 s.67
    • /
    • pp.90-101
    • /
    • 2007
  • With increasing development of underground space, underground pumped storage power plants, which generate power by felling water in upper reservoir to lower reservoir, have been continuously constructed. For efficient and safe design, construction and maintenance or such power plants, it is very important to understand in-situ stress and the mechanical properties of the surrounding rock mass at the design stage. The power plant presented in this paper is under construction at a depth of $320{\sim}375m$. For stability evaluation of the structure, in-situ stress was measured by over-coring method. Also pressurementer test and a series or laboratory tests were performed to obtain the mechanical properties. Numerical analyses were conducted to check the efficiency of designed support patterns. The results showed that unstable areas occurred partly in the numerical model, and therefore supports were additionally applied. Finally complete stability was obtained and the following excavation has been operated successfully until now.

Water Requirement of Red Pepper Cultivated in House (시설재배 고추의 생육시기별 물요구량 산정)

  • Eom, Ki-Cheol;Jung, Pil-Kyun;Choi, Sung-Ho;Kim, Tae-Wan;Yoo, Sung-Yung;Park, So-Hyun;Hur, Seung-Oh;Ha, Sang-Keun
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.43 no.6
    • /
    • pp.848-851
    • /
    • 2010
  • The essential factor for house cultivation is water management. Water requirement of crop is the most important for the water management. The water requirement of crop is different according to the area as well as climate condition and growth stage. However, the measurement of PET (Potential Evapo-Transpiration) and crop coefficient (Kc) is very difficult especially in house cultivation. Therefore, the PET and Kc of red pepper are estimated based on the lysimeter experiments carried out by the RDA for 11 years about the ratio of house cultivation to wild cultivation. Periodic PET, mean water requirement (MWR) and accumulated water requirement (AWR) of red pepper cultivated in house are evaluated.

A Numerical Study on the Occurrence Scope of Underground Cavity and Relaxation Zone Considering Sewerage Damage Width and Soil Depth (하수관거 파손폭과 토피고를 고려한 지중 공동 및 이완영역 발생 규모에 관한 수치해석적 연구)

  • You, Seung-Kyong;Ahn, HeeChul;Kim, Young-Ho;Han, Jung-Geun;Hong, Gigwon;Park, Jeong-Jun
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.1
    • /
    • pp.43-53
    • /
    • 2019
  • This paper described a result of finite element analysis considering sewerage damage scale and soil depth, in order to analyze quantitatively for cavity and relaxation zone of underground due to sewerage damage. The mechanical model, which was verified by previous studies, was applied to the finite element analysis. In addition, the mechanical behavior of the soil around the sewerage damage due to the soil loss was simulated by using the forced displacement. Based on finite element analysis results, characteristics of the void ratio distribution, ground subsidence, and shear stress distribution according to sewerage damage scale and soil depth were analyzed. And then, The boundaries of the underground cavity and relaxation zone were determined by using the shear stress reduction characteristics of the ground. Also, an occurrence scope of the cavity and relaxation zone was quantitatively evaluated by the change of sewerage damage scale and soil depth.

Development of Machine Learning Model to Predict the Ground Subsidence Risk Grade According to the Characteristics of Underground Facility (지하매설물 속성을 활용한 기계학습 기반 지반함몰 위험도 예측모델 개발)

  • Lee, Sungyeol;Kang, Jaemo;Kim, Jinyoung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.23 no.8
    • /
    • pp.5-10
    • /
    • 2022
  • Ground Subsidence has been continuously occurring in densely populated downtown. The main cause of ground subsidence is the damaged underground facility like sewer. Currently, ground subsidence is being dealt with by discovering cavities in ground using GPR. However, this consumes large amount of manpower and cost, so it is necessary to predict hazardous area for efficient operation of GPR. In this study, ◯◯city is divided into 500 m×500 m grids. Then, data set was constructed using the characteristics of the underground facility and ground subsidence in grids. Data set used to machine learning model for ground subsidence risk grade prediction. The purposed model would be used to present a ground subsidence risk map of target area.

Decision based uncertainty model to predict rockburst in underground engineering structures using gradient boosting algorithms

  • Kidega, Richard;Ondiaka, Mary Nelima;Maina, Duncan;Jonah, Kiptanui Arap Too;Kamran, Muhammad
    • Geomechanics and Engineering
    • /
    • v.30 no.3
    • /
    • pp.259-272
    • /
    • 2022
  • Rockburst is a dynamic, multivariate, and non-linear phenomenon that occurs in underground mining and civil engineering structures. Predicting rockburst is challenging since conventional models are not standardized. Hence, machine learning techniques would improve the prediction accuracies. This study describes decision based uncertainty models to predict rockburst in underground engineering structures using gradient boosting algorithms (GBM). The model input variables were uniaxial compressive strength (UCS), uniaxial tensile strength (UTS), maximum tangential stress (MTS), excavation depth (D), stress ratio (SR), and brittleness coefficient (BC). Several models were trained using different combinations of the input variables and a 3-fold cross-validation resampling procedure. The hyperparameters comprising learning rate, number of boosting iterations, tree depth, and number of minimum observations were tuned to attain the optimum models. The performance of the models was tested using classification accuracy, Cohen's kappa coefficient (k), sensitivity and specificity. The best-performing model showed a classification accuracy, k, sensitivity and specificity values of 98%, 93%, 1.00 and 0.957 respectively by optimizing model ROC metrics. The most and least influential input variables were MTS and BC, respectively. The partial dependence plots revealed the relationship between the changes in the input variables and model predictions. The findings reveal that GBM can be used to anticipate rockburst and guide decisions about support requirements before mining development.

Analysis on the Influence and Reinforcement Effect of Adjacent Pier Structures according to the Underpass Construction (지하차도 시공에 따른 인접 교각구조물 영향 및 보강효과 분석)

  • Lee, Donghyuk
    • Journal of the Korean GEO-environmental Society
    • /
    • v.23 no.4
    • /
    • pp.29-39
    • /
    • 2022
  • In order to solve the serious traffic congestion in seoul metropolitan city, large-scale underground space development such as underpasses, deep underground roads, and GTX (Great Train eXpress) is being carried out. In order to minimize the impact of the adjacent seoul metro line A pier foundation and stability due to the construction of the underground road in Seoul, earth retaining structures were reinforced and the foundation was reinforced as well. In this study, three-dimensional finite element mehtod analysis was performed to evaluate the effect on adjacent construction and to review the stability of the underpass excavation work. The reinforcement effect was quantitatively analyzed through numerical analysis. As a result of the analysis, compared to the result of performing the existing reinforcement when overlapping CIP and ground reinforcement grouting were performed, the displacement of the earth retaining structures was reduced by more than 50%, and stress of the foundation piles were also reduced by more than 45%. Based on the analysis of the numerical analysis results, it was confirmed that the displacement of the walls of earth retaining structures during adjacent construction should be strictly controlled.

Analysis of accidents due to Urban Ground Excavation (지반굴착공사로 인한 사고사례 분석)

  • Seong, Joo-Hyun;Yoon, Jong-Ku;Jung, Soo-Hyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1087-1094
    • /
    • 2010
  • With recent growth of population and industry, urban development grows into grand scheme of excavation and construction in urban area. As the development progress advanced, the developments get large and deepen. With a progress of technology development in geotechnical engineering in Korea, most our grand scheme of projects follows great progress. On the other hand, some excavation in construction site caused direct or indirect event that affects the adjacent or surrounding structures by excavation from time to time. This event usually happens around residential and commercial area where underground tunnel, subway station, commercial building, and high-rises excavation site is, could lead great damage on economy as well as personal injury or human casualties. In order to prevent this event, the study has to be done with analysis on various events of excavation and its cause. In this paper, the research has collected the various excavation events and their causes to analyze on each site and event to define emphasis on surrounding environment.

  • PDF

Development of GIS Interconnected Corrosion Prediction System for Underground Metallic Structures (기존 GIS에 연계한 지하금속매설물의 부식예측시스템 개발)

  • Ha, Tae-Hyun;Kim, Dae-Kyeong;Bae, Jeong-Hyo;Lee, Hyun-Goo;Choi, Sang-Bong;Jeong, Seong-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 1999.11c
    • /
    • pp.769-771
    • /
    • 1999
  • In general, the most of GIS is only deal with the material and geometric data which are position, radius, length etc except a corrosion data. In present, the owner of metallic structures having an interest in that my structures do corrode or not and how many life time is there? So, we need the development of GIS interconnected corrosion prediction system on the view point of the efficiency of operation and the protection for big accident. The results of development of its system are described in this paper. It can do life prediction and interference analysis and also newest corrosion data should be updated regularly.

  • PDF

Application of 3-Dimensional Modeling in Mine Feasibility Study and Production (광산개발 타당성 평가 및 생산에 있어서 3차원 모델링 적용 사례)

  • Choi, Yong-Kun;Heo, Seung;Park, Joon-Young;Kim, Jang-Ha;Lee, Sung-Am
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2009.05a
    • /
    • pp.89-100
    • /
    • 2009
  • 3-dimensional modeling methods have been used in the every step of resource development; Exploration, reserve estimation, mine feasibility study, mine design and mine production. This report shows seven cases for which 3-dimensional modeling is used in resource development. Six projects deal with resource esimation, mine feasibility study and production. And another deals with mine rehabilitation. These cases show that 3-dimensional modeling method is beneficial to understand the real state of ore deposit and complex underground structures. Moreover, 3-dimensional modeling is the most efficient method for mine planning and management in the every step of resource development.

  • PDF

The Development and Application of a External Coating for Buried Pipeline Rehabilitation

  • Zhang, Liping;Lin, Zhu;Zhang, Qibin;Qin, Yanlong;Wang, Xueying
    • Corrosion Science and Technology
    • /
    • v.2 no.3
    • /
    • pp.161-163
    • /
    • 2003
  • With the development of Chinese petroleum and gas industry, about 20,000 km long-distance pipeline and 250,000 km gathering pipeline have been constructed in China. After operating for many years, most of the coatings on buried pipelines have aged so severe that the steel pipes are subject to corrosion environment underground. Focusing on the need of external coating for buried pipeline rehabilitation, a new type of coating has been developed. The development and application of the coatings has been introduced in this paper.