1 |
Seoul Metropolitan Government rrban Infrastructure Headquarters (2021), OO road enlargement (Sector 2) change of design technical report.
|
2 |
Seoul Metro operates (2020), "Rules for the management of excavation sites adjacent to the subway".
|
3 |
Seoul Metropolitan Government (2021), OOroad (OO~OO sector) underpass construction work urban subway line A passing section earth retaining wall stability review report.
|
4 |
KDS 27 00 00, Tunnel design criterior "Tunnel numerical analysi (2016)", pp. 2~4.
|
5 |
Korean Tunnelling and Underground Space Association (2009), "Tunnel design criterior manual", pp. 171~186.
|
6 |
Seoul Metro operates (2001), "Management practice of excavation work adjacent to seoul metro subway", pp. 32~35, pp. 101.
|
7 |
Seoul Metro operates (2018), Track maintenance regulations chpater 2. track maintenance criterior [reference 5]
|