D&B method in tunnel construction requires accurate and rapid measurement of the ground movement, which of essential for feedback analysis. Recently, survey technique adapting IT is getting more and more emphasized in the field of construction and tunnel survey also follow the same trend. Case study and adaptability of IT technique for tunnel survey will be discussed in this study. The application of laserscannig method in the field of tunnel construction was reported in several advanced country including Austria and Japan. Survey for the crown and shoulder movements by IT survey method was conducted and the results were compared to those do the conventional method. The pipe-roof, grouting, ring-cut are installed in the this site to prevent expected large ground settlement. The result show that laserscanner system is prefered rather than conventional method in that better understanding for the displacement condition and origin condition was liable by the lasersacnnig method. IT survey solution makes if possible to execute more economic and safe construction.
Tunnel Mapper, which is tunnel face survey system was used to conduct Face Mapping on the face of the tunnel that is under construction. Then, accuracy and utility value on the forecast of discontinuity were verified to verify the field application in order to present the measures for the use of the system for conducting research on the discontinuity. As result of the directivity verification following discontinuity‘s project, forecasted measurement and actually researched measurement error for the Dip direction and Dip angle was less than ${\pm}10$. Accuracy was 82.6% for Dip direction and 90.7% for Dip angle, which are high. Accordingly, face research discontinuity forecasting system's reliability level towards directivity is high. Tunnel Mapper, a tunnel face survey system can be leveraged to replace face's visual survey and to obtain objective information, enabling execution of the survey system that can automate face survey going beyond time and space related limitations.
평택 및 인천의 액화석유가스(LPG) 지하저장기지에 대해 VSP(Vertical Seismic Profiling)탐사를 터널에 응용한 TSP(Tunnel Seismic Prediction)탐사를 시공 중에 실시하였다. 평택 LPG 지하저장기지에서의 TSP탐사는 저장동굴이 위치한 남양호 하부에 존재하고 사전조사단계에서 파악된 단층의 방향과 규모를 확인하기 위하여 실시하였다. 단층의 위치 및 규모를 입체적으로 파악하기 위하여 진입터널, 수벽공터널 및 공사용터널에서 TSP탐사를 수행하였으며, 진입터널에서 천공된 4공의 조사 공과 비교되었다. TSP탐사 결과는 조사공 결과와 일치하였고, 파악된 단층대의 위치에 따라 기존에 설계된 저장동굴의 배치와 연장을 변경하였다. 해저에 건설된 인천 LPG 지하저장기지의 경우 시공 중에 많은 출수가 있어 효과적인 지수를 위해 지질구조에 대한 정확한 파악이 요구되었다. TSP탐사에 의한 파쇄대 분포의 파악으로 적절한 지보 및 그라우팅 대책이 이루어졌다.
설계 단계의 지반조사에서 예측되지 않은 이상대는 터널 시공 중 많은 문제를 발생시킬 수 있다. 따라서 터널의 붕괴 예방을 위해 터널 시공 중 굴착면 전방의 지질상태를 예측하는 것은 매우 중요하다. 터널 굴착면에서 전기비저항 탐사를 하더라도, 기존의 전기비저항 탐사 프로그램들은 터널을 모델링하지 못하기 때문에 왜곡된 결과를 얻을 수 있다. 따라서 본 연구에서는 터널의 형태를 고려할 수 있는 전기비저항 모델링 프로그램을 개발하였다. 개발된 프로그램을 이용하여 터널에서 전기비저항 탐사에 대한 수치모델링 및 역산을 수행하였다. 그 결과, 굴착면 전방의 이상체의 위치 및 상태를 잘 예측하는 것으로 나타났다.
기존의 터널 측량 방법은 관측시간이 많이 소요되고, 이로 인한 공사비 증가 및 공사기간 지연 등의 문제점을 가지고 있기 때문에 터널측량에서의 오차요인과 시간 및 경비절감 문제 등을 해결할 수 있는 측량시스템을 개발하여 효율성 증대를 위한 측량방법을 제안하였다. 이러한 문제점들을 해결하기 위하여 측량 장비와 Note book 컴퓨터를 연결하여 현장에서 실시간으로 터널측량과 동시에 위치 및 오차들을 결정할 수 있는 시스템을 개발하였다. 터널측량시스템을 개발함으로서 터널 측량시 오차발생과 터널 굴착시의 미굴 및 여굴의 가능성을 최소화하여 시공품질의 향상과 원가 절감 및 공기 단축 등의 효과를 가져 올 수 있도록 하였다.
터널 막장전방의 지반조건을 예측하는데 굴절법 탄성파탐사가 주를 이루어 왔으나, 최근에는 탄성파탐사 기기 및 기법의 발전에 힘입어 시추공을 이용한 토모그래피 등이 활발히 적용되고 있다. 본 논문은 TSP (Tunnel Seismic Prediction) 탐사장비를 이용하여 막장전방의 지반조건을 예측함으로써 암질 변화구간이나 단층, 파쇄대등 지질이상대를 파악하여 터널 굴착 시 시공 및 안정상의 문제점을 예방하는데 목적이 있다. 본 연구에서는 ${\bigcirc}{\bigcirc}$-${\bigcirc}{\bigcirc}$ 도로개설현장에서 적용된 TSP탐사에 의한 터널전방의 지질이상대를 파악한 사례로 막장탐사 방법의 타당성을 살펴보고자 하였다.
Wadhwa R. S.;Chaudhari M. S.;Chandrasekhar V.;Saha A.;Mukhopadhyay R.
한국지구물리탐사학회:학술대회논문집
/
한국지구물리탐사학회 2003년도 Proceedings of the international symposium on the fusion technology
/
pp.370-378
/
2003
Continuous seismic refraction, reflection and echo-sounder surveys conducted at Koyna Project site provided geotechnical information which helped in choosing the alignment for Head race tunnel and in designing and choosing the site for Lake Tap. Seismic refraction survey both on land and in shallow water determined depths to bedrock and helped in inferring the bedrock quality. Seismic reflection survey mapped the subsurface stratigraphy with high resolution. Reservoir-bed and bedrock contours drawn from the results of the survey helped in choosing the tunnel alignment and the lake tap position cost effectively. It was inferred from the results of the survey that the geology and the quality of rock do not change unexpectedly around the site for extension of Head race tunnel and the lake tapping. The bedrock levels evaluated by seismic survey agreed remarkably well with those inferred in boreholes having Rock Quality Designation 90 percent or more.
Anomalies and/or fractured grounds not detected by the surface geophysical and geological survey performed during design stage may cause significant problems during tunnel excavation. Many studies on prediction methods of the ground condition ahead of the tunnel face have been conducted and applied in tunneling construction sites, such as tunnel seismic profiling and probe drilling. However, most such applications have focused on the drill and blast tunneling method. Few studies have been conducted for mechanized tunneling because of the limitation in the available space to perform prediction tests. This study aims to predict the ground condition ahead of the tunnel face in TBM tunneling by using an electrical resistivity tomography survey. It compared the characteristics of each electrode array and performed an investigation on in-situ tunnel boring machine TBM construction site environments. Numerical simulations for each electrode array were performed, to determine the proper electrode array to predict anomalies ahead of the tunnel face. The results showed that the modified dipole-dipole array is, compared to other arrays, the best for predicting the location and condition of an anomaly. As the borehole becomes longer, the measured data increase accordingly. Therefore, longer boreholes allow a more accurate prediction of the location and status of anomalies and complex grounds.
Geological events which are undetected by the surface geophysical or geological survey phase can cause many problems, especially when the tunnel is excavated by TBM. To detect the geological events ahead of tunnel face, a seismic method applied from VSP method is used. Generally uniaxial geophone has been used in surface seismic survey. But this time, triaxial geophone is used to reduce the noise of tunnel wave. DME(Dip moveout Enhancement) filter and diffraction stack method are used. Applying these techniques to the road tunnel in construction, it is proved that the geological events ahead of tunnel face is fairly well predicted. From the seismic trace, Vp and Vs which are related to the rock property can be also obtained. Rock property and proper support design can be dedced from these parameters.
본 논문은 시추공 탄성파 탐사에 의해 암반내에 형성된 소규모 터널(크기 약 2m$\times$2m)도 탐지될 수 있음을 보여주고 있다. 탄성파 전달 측면에서 상기 소규모 터널은 회절파를 유발하게 되어 수진기 배열 일부구간에는 하나의 특징적인 주시 및 진폭 변화를 갖는 초동으로 도달된다. 이러한 터널효과는 바로 터널의 존재 여부에 대한 중요한 지침이 되며 동시에 그에 대한 진폭 및 주시 분석은 바로 터널 위치에 대한 정보를 제시하는 것이다. 본 논문에서는 우선 수치모델링을 통하여 상기 터널 효과를 보다 정량적으로 분석한 후 그로부터 터널 위치 규명을 위한 하나의 효율적인 기법을 제시하고 있으며 나아가서 현장 실험에서도 상기 터널효과가 전 기록을 통하여 일관성을 띠면서 뚜렷이 관찰되고 있음을 보여주고 있다. 더구나 탐사에 의해 규명된 터널 위치는 바로 실존하는 터널의 위치와 훌륭하게 부합되고 있다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.