• 제목/요약/키워드: tunnel survey

검색결과 301건 처리시간 0.024초

터널 정보화 시공을 위한 계측 최적방안 분석 (Analysis of optimized survey methods for tunnel construction using IT)

  • 최원일;조국환;박성욱
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.941-946
    • /
    • 2008
  • D&B method in tunnel construction requires accurate and rapid measurement of the ground movement, which of essential for feedback analysis. Recently, survey technique adapting IT is getting more and more emphasized in the field of construction and tunnel survey also follow the same trend. Case study and adaptability of IT technique for tunnel survey will be discussed in this study. The application of laserscannig method in the field of tunnel construction was reported in several advanced country including Austria and Japan. Survey for the crown and shoulder movements by IT survey method was conducted and the results were compared to those do the conventional method. The pipe-roof, grouting, ring-cut are installed in the this site to prevent expected large ground settlement. The result show that laserscanner system is prefered rather than conventional method in that better understanding for the displacement condition and origin condition was liable by the lasersacnnig method. IT survey solution makes if possible to execute more economic and safe construction.

  • PDF

Tunnel Mapper를 이용한 Tunnel 막장면 조사에 관한 연구 (Study of Tunnel Face Mapping Using Tunnel Mapper)

  • 곽노경;조성진;이송
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회 2차
    • /
    • pp.200-211
    • /
    • 2010
  • Tunnel Mapper, which is tunnel face survey system was used to conduct Face Mapping on the face of the tunnel that is under construction. Then, accuracy and utility value on the forecast of discontinuity were verified to verify the field application in order to present the measures for the use of the system for conducting research on the discontinuity. As result of the directivity verification following discontinuity‘s project, forecasted measurement and actually researched measurement error for the Dip direction and Dip angle was less than ${\pm}10$. Accuracy was 82.6% for Dip direction and 90.7% for Dip angle, which are high. Accordingly, face research discontinuity forecasting system's reliability level towards directivity is high. Tunnel Mapper, a tunnel face survey system can be leveraged to replace face's visual survey and to obtain objective information, enabling execution of the survey system that can automate face survey going beyond time and space related limitations.

  • PDF

액화석유가스(LPG) 지하저장기지에서의 TSP(Tunnel Seismic Prediction)탐사

  • 차성수
    • 지구물리
    • /
    • 제5권2호
    • /
    • pp.75-86
    • /
    • 2002
  • 평택 및 인천의 액화석유가스(LPG) 지하저장기지에 대해 VSP(Vertical Seismic Profiling)탐사를 터널에 응용한 TSP(Tunnel Seismic Prediction)탐사를 시공 중에 실시하였다. 평택 LPG 지하저장기지에서의 TSP탐사는 저장동굴이 위치한 남양호 하부에 존재하고 사전조사단계에서 파악된 단층의 방향과 규모를 확인하기 위하여 실시하였다. 단층의 위치 및 규모를 입체적으로 파악하기 위하여 진입터널, 수벽공터널 및 공사용터널에서 TSP탐사를 수행하였으며, 진입터널에서 천공된 4공의 조사 공과 비교되었다. TSP탐사 결과는 조사공 결과와 일치하였고, 파악된 단층대의 위치에 따라 기존에 설계된 저장동굴의 배치와 연장을 변경하였다. 해저에 건설된 인천 LPG 지하저장기지의 경우 시공 중에 많은 출수가 있어 효과적인 지수를 위해 지질구조에 대한 정확한 파악이 요구되었다. TSP탐사에 의한 파쇄대 분포의 파악으로 적절한 지보 및 그라우팅 대책이 이루어졌다.

  • PDF

터널 굴착면에서의 전기비저항 탐사 적용성에 관한 수치해석 연구 (Numerical simulation study on applicability of electrical resistivity survey at tunnel face)

  • 이명종;김낙영;이상래;황범식;하명진;김기석;조인기;이강현
    • 한국터널지하공간학회 논문집
    • /
    • 제24권3호
    • /
    • pp.279-292
    • /
    • 2022
  • 설계 단계의 지반조사에서 예측되지 않은 이상대는 터널 시공 중 많은 문제를 발생시킬 수 있다. 따라서 터널의 붕괴 예방을 위해 터널 시공 중 굴착면 전방의 지질상태를 예측하는 것은 매우 중요하다. 터널 굴착면에서 전기비저항 탐사를 하더라도, 기존의 전기비저항 탐사 프로그램들은 터널을 모델링하지 못하기 때문에 왜곡된 결과를 얻을 수 있다. 따라서 본 연구에서는 터널의 형태를 고려할 수 있는 전기비저항 모델링 프로그램을 개발하였다. 개발된 프로그램을 이용하여 터널에서 전기비저항 탐사에 대한 수치모델링 및 역산을 수행하였다. 그 결과, 굴착면 전방의 이상체의 위치 및 상태를 잘 예측하는 것으로 나타났다.

현장측량시스템을 이용한 터널공사의 효용성 향상 (Improvement Efficiency of Tunnel Work using Site Surveying System)

  • 최석근;안원태
    • 대한공간정보학회지
    • /
    • 제14권3호
    • /
    • pp.31-37
    • /
    • 2006
  • 기존의 터널 측량 방법은 관측시간이 많이 소요되고, 이로 인한 공사비 증가 및 공사기간 지연 등의 문제점을 가지고 있기 때문에 터널측량에서의 오차요인과 시간 및 경비절감 문제 등을 해결할 수 있는 측량시스템을 개발하여 효율성 증대를 위한 측량방법을 제안하였다. 이러한 문제점들을 해결하기 위하여 측량 장비와 Note book 컴퓨터를 연결하여 현장에서 실시간으로 터널측량과 동시에 위치 및 오차들을 결정할 수 있는 시스템을 개발하였다. 터널측량시스템을 개발함으로서 터널 측량시 오차발생과 터널 굴착시의 미굴 및 여굴의 가능성을 최소화하여 시공품질의 향상과 원가 절감 및 공기 단축 등의 효과를 가져 올 수 있도록 하였다.

  • PDF

터널막장 전방 파악을 위한 TSP(Tunnel Seismic Prediction) 탐사 사례 연구 (Application of TSP Suvey to Predict the Ground Conditions Ahead of Tunnel Face)

  • 조성원;이효;유재원;김도훈;남승혁
    • 화약ㆍ발파
    • /
    • 제31권2호
    • /
    • pp.40-49
    • /
    • 2013
  • 터널 막장전방의 지반조건을 예측하는데 굴절법 탄성파탐사가 주를 이루어 왔으나, 최근에는 탄성파탐사 기기 및 기법의 발전에 힘입어 시추공을 이용한 토모그래피 등이 활발히 적용되고 있다. 본 논문은 TSP (Tunnel Seismic Prediction) 탐사장비를 이용하여 막장전방의 지반조건을 예측함으로써 암질 변화구간이나 단층, 파쇄대등 지질이상대를 파악하여 터널 굴착 시 시공 및 안정상의 문제점을 예방하는데 목적이 있다. 본 연구에서는 ${\bigcirc}{\bigcirc}$-${\bigcirc}{\bigcirc}$ 도로개설현장에서 적용된 TSP탐사에 의한 터널전방의 지질이상대를 파악한 사례로 막장탐사 방법의 타당성을 살펴보고자 하였다.

Geophysical investigations for deciding alignment of head race tunnel and location of lake tapping at Koyna hydroelectric project, Maharashtra, India

  • Wadhwa R. S.;Chaudhari M. S.;Chandrasekhar V.;Saha A.;Mukhopadhyay R.
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2003년도 Proceedings of the international symposium on the fusion technology
    • /
    • pp.370-378
    • /
    • 2003
  • Continuous seismic refraction, reflection and echo-sounder surveys conducted at Koyna Project site provided geotechnical information which helped in choosing the alignment for Head race tunnel and in designing and choosing the site for Lake Tap. Seismic refraction survey both on land and in shallow water determined depths to bedrock and helped in inferring the bedrock quality. Seismic reflection survey mapped the subsurface stratigraphy with high resolution. Reservoir-bed and bedrock contours drawn from the results of the survey helped in choosing the tunnel alignment and the lake tap position cost effectively. It was inferred from the results of the survey that the geology and the quality of rock do not change unexpectedly around the site for extension of Head race tunnel and the lake tapping. The bedrock levels evaluated by seismic survey agreed remarkably well with those inferred in boreholes having Rock Quality Designation 90 percent or more.

  • PDF

Electrical resistivity tomography survey for prediction of anomaly in mechanized tunneling

  • Lee, Kang-Hyun;Park, Jin-Ho;Park, Jeongjun;Lee, In-Mo;Lee, Seok-Won
    • Geomechanics and Engineering
    • /
    • 제19권1호
    • /
    • pp.93-104
    • /
    • 2019
  • Anomalies and/or fractured grounds not detected by the surface geophysical and geological survey performed during design stage may cause significant problems during tunnel excavation. Many studies on prediction methods of the ground condition ahead of the tunnel face have been conducted and applied in tunneling construction sites, such as tunnel seismic profiling and probe drilling. However, most such applications have focused on the drill and blast tunneling method. Few studies have been conducted for mechanized tunneling because of the limitation in the available space to perform prediction tests. This study aims to predict the ground condition ahead of the tunnel face in TBM tunneling by using an electrical resistivity tomography survey. It compared the characteristics of each electrode array and performed an investigation on in-situ tunnel boring machine TBM construction site environments. Numerical simulations for each electrode array were performed, to determine the proper electrode array to predict anomalies ahead of the tunnel face. The results showed that the modified dipole-dipole array is, compared to other arrays, the best for predicting the location and condition of an anomaly. As the borehole becomes longer, the measured data increase accordingly. Therefore, longer boreholes allow a more accurate prediction of the location and status of anomalies and complex grounds.

수직 탄성파탐사를 응용한 터널 전방의 불연속면 예측과 암반 물성 파악 (Prediction of Discontinuity and Determination of Rock Property ahead of Tunnel Face by VSP application)

  • 남기천;이진무;차성수
    • 터널과지하공간
    • /
    • 제5권3호
    • /
    • pp.214-222
    • /
    • 1995
  • Geological events which are undetected by the surface geophysical or geological survey phase can cause many problems, especially when the tunnel is excavated by TBM. To detect the geological events ahead of tunnel face, a seismic method applied from VSP method is used. Generally uniaxial geophone has been used in surface seismic survey. But this time, triaxial geophone is used to reduce the noise of tunnel wave. DME(Dip moveout Enhancement) filter and diffraction stack method are used. Applying these techniques to the road tunnel in construction, it is proved that the geological events ahead of tunnel face is fairly well predicted. From the seismic trace, Vp and Vs which are related to the rock property can be also obtained. Rock property and proper support design can be dedced from these parameters.

  • PDF

터널위치 규명을 위한 시추공 탄성파탐사 현장 응용 (A Field Application of Crosshole Seismic Survey to the Detection of Tunnel)

  • 김중열;김유성
    • 지질공학
    • /
    • 제7권1호
    • /
    • pp.27-36
    • /
    • 1997
  • 본 논문은 시추공 탄성파 탐사에 의해 암반내에 형성된 소규모 터널(크기 약 2m$\times$2m)도 탐지될 수 있음을 보여주고 있다. 탄성파 전달 측면에서 상기 소규모 터널은 회절파를 유발하게 되어 수진기 배열 일부구간에는 하나의 특징적인 주시 및 진폭 변화를 갖는 초동으로 도달된다. 이러한 터널효과는 바로 터널의 존재 여부에 대한 중요한 지침이 되며 동시에 그에 대한 진폭 및 주시 분석은 바로 터널 위치에 대한 정보를 제시하는 것이다. 본 논문에서는 우선 수치모델링을 통하여 상기 터널 효과를 보다 정량적으로 분석한 후 그로부터 터널 위치 규명을 위한 하나의 효율적인 기법을 제시하고 있으며 나아가서 현장 실험에서도 상기 터널효과가 전 기록을 통하여 일관성을 띠면서 뚜렷이 관찰되고 있음을 보여주고 있다. 더구나 탐사에 의해 규명된 터널 위치는 바로 실존하는 터널의 위치와 훌륭하게 부합되고 있다.

  • PDF