Improvement Efficiency of Tunnel Work using Site Surveying System

현장측량시스템을 이용한 터널공사의 효용성 향상

  • Published : 2006.09.30

Abstract

The existing tunnel survey method contains many problems of taking much measuring time, increasing construction expenses, and delaying a term of construction. Therefore the site survey system for an improvement efficiency is developed. This system will be able to solve the ewer factor and the problem of curtailment of time and expenditure. In order to solve these problems it connected a measurement equipment and a notebook computer, and developed the system which simultaneously with tunnel measurement it will be able to decide locations and errors from site at real-time. The development or the tunnel survey system minimize the error occurrence as measuring tunnel, and the probability of more or less excavation. Therefore this site survey system leads to the effect of the improvement execution quality of work, the cost reduction and the construction term reduction.

기존의 터널 측량 방법은 관측시간이 많이 소요되고, 이로 인한 공사비 증가 및 공사기간 지연 등의 문제점을 가지고 있기 때문에 터널측량에서의 오차요인과 시간 및 경비절감 문제 등을 해결할 수 있는 측량시스템을 개발하여 효율성 증대를 위한 측량방법을 제안하였다. 이러한 문제점들을 해결하기 위하여 측량 장비와 Note book 컴퓨터를 연결하여 현장에서 실시간으로 터널측량과 동시에 위치 및 오차들을 결정할 수 있는 시스템을 개발하였다. 터널측량시스템을 개발함으로서 터널 측량시 오차발생과 터널 굴착시의 미굴 및 여굴의 가능성을 최소화하여 시공품질의 향상과 원가 절감 및 공기 단축 등의 효과를 가져 올 수 있도록 하였다.

Keywords