Prediction of Discontinuity and Determination of Rock Property ahead of Tunnel Face by VSP application

수직 탄성파탐사를 응용한 터널 전방의 불연속면 예측과 암반 물성 파악

  • 남기천 (선경건설 지하비축팀) ;
  • 이진무 (선경건설 지하비축팀) ;
  • 차성수 (선경건설 지하비축팀 근무)
  • Published : 1995.09.01

Abstract

Geological events which are undetected by the surface geophysical or geological survey phase can cause many problems, especially when the tunnel is excavated by TBM. To detect the geological events ahead of tunnel face, a seismic method applied from VSP method is used. Generally uniaxial geophone has been used in surface seismic survey. But this time, triaxial geophone is used to reduce the noise of tunnel wave. DME(Dip moveout Enhancement) filter and diffraction stack method are used. Applying these techniques to the road tunnel in construction, it is proved that the geological events ahead of tunnel face is fairly well predicted. From the seismic trace, Vp and Vs which are related to the rock property can be also obtained. Rock property and proper support design can be dedced from these parameters.

Keywords

References

  1. Tunneling and Underground Space Technology v.7 no.3 Probing ahead of TBM by Geophysical Means Nord,G.;Olsson,P.;By T.L.
  2. First Break v.10 no.1 Prediction ahead of the tunnel face by seismic methods-pliot project in Centovalli Tunnel, Locarno, Swizerland Sattel,G.;Frey,P.;Amberg,R.
  3. Introduction to Rock Mechanics Goodman,R.E.
  4. First Break v.4 no.7 What is DMO? Deregoeski,S.M.
  5. Society of Exploration Geophysicists Dip Moveout Processing Hale;Dave
  6. Society of Exploration Geophysicists Seismic Data Processing Yilmaz