• Title/Summary/Keyword: tunnel face mapping

Search Result 53, Processing Time 0.02 seconds

Deformation characteristics of surrounding rock in the intersection area between main tunnel and construction adit of the Xianglushan tunnel

  • Yunjuan Chen;Mengyue Liu;Fuqiang Yin;Lewen Zhang;Jing Wu;Jinrui Li
    • Geomechanics and Engineering
    • /
    • v.38 no.1
    • /
    • pp.1-13
    • /
    • 2024
  • The construction adit plays a pivotal role in enhancing the working face during the excavation of long-distance and deep hydraulic tunnels. However, the intersection zone between the main tunnel and the construction adit exhibits more intricate deformation patterns in surrounding rock, posing a significant threat to stability during excavation. Taking the Xianglushan tunnel in Yunnan Province, China, as a case study, the FLAC3D software is employed to simulate the excavation process at the intersection. The simulation results are verified combined with the field deformation monitoring results, and the spatial distribution of tunnel rock deformation in the intersection area are analyzed. Five excavation conditions with different intersection angles are simulated, and the surrounding rock deformation of the tunnel intersection area with different intersection angles is analyzed, and its influence range is discussed. The results show that: (1) The surrounding rock deformation in the intersection area increases rapidly during the tunnel excavation. With the increase of construction distance, the deformation of intersection area is gradually stable. (2) The deformation distribution of the tunnel rock is uneven, and the deformation of main tunnel near the intersection area is larger than that far away from the intersection area. (3) With the increase of the intersection angle, the surrounding rock deformation of the tunnel intersection and its influence range decreases gradually. The research results have certain guiding significance for the construction safety of the tunnel intersection area.

A Study on Analysis for the Characteristics of Fault Zone at Mica-schist for Reinforcement of Large-Span Tunnel (대단면 터널 보강을 위한 운모편암 단층대 특성 분석에 관한 연구)

  • Chung, Hoi-Yong;Kim, Young-Geun;Park, Yeon-Jun;You, Kwang-Ho
    • Tunnel and Underground Space
    • /
    • v.19 no.2
    • /
    • pp.132-145
    • /
    • 2009
  • Faults in rock mass have strong influences on the behaviors of rock structure such as rock slope, tunnel and underground space. Thus, it is very important to analyse for the characteristics of fault rocks in design for tunnel. But, due to the limitation of geotechnical investigation in design stages, tunnel engineers have to carry out the face mapping and additional geological survey during tunnel excavation to find the distribution of faults and the engineering properties of faults for support and reinforcement design of tunnel. In this study, various geological survey and field tests were carried out to analyse the characteristics of the large thrust fault zone through the large sectional tunnel is constructed in mica-schist region. Also, the distribution of structural geology, the shape of thrust faults and the mechanical properties of fault rock were studied for the reasonable design of the reinforcement and support method for the highly fractured fault zone in the large-span tunnel.

Intelligent management system for tunnel under construction using ITIS (Intelligent Tunnelling Information System)

  • Kim Changyong;Hong Sungwan;Bae Gyujin;Kim Kwangyeom
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2003.11a
    • /
    • pp.170-175
    • /
    • 2003
  • Ground and rock mass considered in tunnelling have characteristics such as uncertainty, heterogeneity and structural complexity because they have been formed undergoing various geological events for a long period. So, it is difficult for engineers to predict behaviors of rock mass in tunneling. In the paper the authors describe the development of an integrated expert system prototype for site investigation, design and construction in tunnelling and introduce the case applying this system to the tunnel construction site under construction. Geostructure Research Group in Korea Institute of Construction Technology (KICT) has developed the system during the past 4 years. The system mainly consists of several modules which is related to the design, construction and management of tunnelling. The test site, Neung-dong tunnel is located in Ulsan, Korea. The geology map shows it may confront big fault zone whose width is over kilometres. With the networking system of ITIS, various information of face mapping, monitoring and other construction task can be transmitted into the database and GIS Server at real time. And necessary analyses can be carried out with the modules equipped in the system.

  • PDF

New approach on prediction of fault zone ahead of tunnel face by using $x-R_s$ control chart for RMR parameters (RMR 변수의 $x-R_s$ 관리도 분석을 통한 굴착면 전방 단층대 예측 기법)

  • Yim, Sung-Bin;Kim, Kwang-Yeom;Kim, Chang-Yong;Seo, Yong-Seok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.6
    • /
    • pp.463-473
    • /
    • 2010
  • A new approach for prediction of a fault zone ahead of tunnel face by using statistical control charts is suggested and applied to the construction site. $x-R_s$ control charts of RMR parameters were investigated as approaching and passing through fault zone. The abnormal signal from the control charts was observed and analyzed based on statistical criteria. Fault zones in the application area were predicted in advance using this method and it was verified by comparing with observation data like horizontal boring and face mapping.

Case Study on the Tunnel Collapses during the Construction and Application of Geotechnical Investigation (터널 시공 중 지반 관련 사고 사례의 원인 분석과 지반 조사 결과의 활용에 관한 검토)

  • Park, Nam-Seo;Lee, Chi-Mun;Gang, Sang-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1998.04a
    • /
    • pp.47-60
    • /
    • 1998
  • It is considered in this paper that the main causes of tunnel collapse during the construction were the insufficiency of data of geotechnical investigations, or their limits due to special ground condition such as its heterogeneity and anisotropy It is thought that safety of ground can be affected by the geological conditions such as presences of discontinuities in good intact rocks, and considered to be necessary that awareness of the conditions of discontinuities in advance is important to apply adequate reinforcement measures. It is also shown that a serious accident had occurred because of the unawareness of the permeable alluvial deposits at the top of the tunnel. And it is shown that the example of application of the results of geotechnical investigation such as face-mapping, pilot boring etc. during tunnel construction, and a serious deformation of tunnel under special geological condition. Therefore, it is strongly recommended to perform an adequate geotechnical investigation to confirm the geotechnical conditons of ground before design, and supplimentary investigation is also needed depending on conditions for safe and econonic construction.

  • PDF

A study on the Correlation Between the Result of Electrical Resistivity Survey and the Rock Mass Classification Values Determined by the Tunnel Face Mapping (전기비저항탐사결과와 터널막장 암반분류의 상관성 검토)

  • Choi, Jai-Hoa;Jo, Churl-Hyun;Ryu, Dong-Woo;Kim, Hoon;Oh, Byung-Sam;Kang, Moon-Gu;Suh, Baek-Soo
    • Tunnel and Underground Space
    • /
    • v.13 no.4
    • /
    • pp.279-286
    • /
    • 2003
  • Many trials to set up the correlation between the rock mass classification and the earth resistivity have been carried out to design tunnel support type based on the interpreted electrical resistivity acquired by surface electrical survey. But it is hard to find reports on the comparison of the real rock support type determined during the excavation with the electrical resistivity by the inversion of the survey data acquired before the tunneling. In this study, the rock mass classification based on the face mapping data and the resistivity inversion data are investigated to see if it is possible to design reliably the rock support type based on the surface electrical survey. To get the quantitative correlation, rock engineering indices such as RCR(rock condition rating), N(Rock mass number), Q-system and RMR(rock mass rating) are calculated. Since resistivity data has low resolution, Kriging method as a post processing technique which minimizes the estimated variance is used to improve resolution. The result of correlation analysis shows that the 2D electrical resistivity survey is appropriate to see the general trend of the geology in the sense of rock type, though there might be some local area where these two factors do not coincide. But the correlation between the result of 3D survey and the rock mass classification turns out to be very high, and then 3D electrical resistivity survey can make it possible to set up more reliable rock support type.

Study on the Fuzzy Inference System for Objectivity of Ground Evaluation in Tunnelling (터널지반 평가의 객관화를 위한 퍼지추론시스템 연구)

  • 조만섭;김영석
    • Tunnel and Underground Space
    • /
    • v.13 no.1
    • /
    • pp.6-19
    • /
    • 2003
  • This study has for its object to increase an objectivity of the observation result in the face mapping of tunnel and to suggest the reasonable support and reinforcement methods to be considered the rock properties. It was developed in this study to the tunnel stability evaluation system(Prototype NFEST) to be used fuzzy set theory and neuro-fuzzy techniques, and this system was verified according to the reliability evaluation between the 36 learning data and the inferred results. When it summarized the results; (1) 12 evaluation items and ranges were proposed to be modified basis on the RMR which are well known to the domestic workers. (2) It was shown that correlation coefficient(│R│) between $RMR_{inf}$ inferred by 12 items and $RMR_{org}$ due to arithmetic total, $RMR_{chk}$ due to subjective judgement of observer are relatively high relationship with each 0.83 and 0.79. (3) Inferred result of the total tunnel safety shows also a good relationship with $RMR_{inf}$ (│R│=0.7) and the rock weathering(│R│=0.84).

The Relationship between Weathering Degree and Reflectance of Laser Scanner Considering RGB Value (RGB 값을 고려한 레이저 스캐너 반사율과 풍화도의 관계에 대한 연구)

  • Yoo, Wan-Kyu;Kim, Jinhwan;Kim, Tae-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.7182-7188
    • /
    • 2015
  • Recently, to improve manual mapping method, digital mapping using high-resolution camera and laser scanner has increasingly attracted attention and the relevant study is reportedly on the rise. In this study, laboratory and field test which are intended to quantitatively analyze and estimate the weathering degree which is one of the engineering characteristics of tunnel face using laser scanner that integrates high-solution imaging technique have been conducted. In a bid to analyze correlation between reflectance of laser scanner and weathering degree, investigation of the factors influencing on reflectance was carried out. And to minimize the effect on RGB value which is one the critical influential factors on reflectance, modification equation obtained from lab test was proposed. Modification equation proposed in this study was verified by comparing the values before and after correction using the data obtained by scanning. Consequently, weathering index estimated by modified reflectance appeared very similar with dominant weathering degree and weathering ratio monitored at the field.

A study on construction simulation of road tunnel using Decision Aids for Tunneling (DAT) (터널의사결정체계 (DAT)를 이용한 도로터널의 시공 시뮬레이션 연구)

  • Min, Sangyoon;Kim, Taek Kon;Einstein, H.H.;Lee, Jun S.;Kim, Ho Young
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.2
    • /
    • pp.161-174
    • /
    • 2003
  • Applicability of the Decision Aids for Tunneling (DAT) technique is investigated in this study to better understand the efficiency of the decision making process during tunnel construction. For this, a traffic tunnel under construction is adopted and information on the construction procedure, i.e., overall geology, unit cost and construction time for each excavation process, is provided periodically. Various scattergrams in which cost-time simulation results are plotted are obtained according to the simulation methods and final prediction on the construction time/cost is made. It is found that the uncertainty in the cost distribution is greater than the uncertainty in the time distribution for each cycle simulation and the uncertainties in time and cost for the one time simulations are comparable. Future work will be concentrated on the updating scheme using the face mapping data and various parametric studies will also be performed.

  • PDF

Auxiliary Reinforcement Method for the Safety of Tunnelling Face (터널 막장안정성에 따른 보강공법 적용)

  • Kim, Chang-Yong;Park, Chi-Hyun;Bae, Gyu-Jin;Hong, Sung-Wan;Oh, Myung-Ryul
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.2 no.2
    • /
    • pp.11-21
    • /
    • 2000
  • Tunnelling has been created as a great extent in view of less land space available because the growth of population in metropolitan has been accelerated at a faster pace than the development of the cities. In tunnelling, it is often faced that measures are obliged to be taken without confirmation for such abnormality as diverged movement of surrounding rock mass, growing crack of shotcrete and yielding of rockbolts. In this case, it is usually said that the judgments of experienced engineers for the selection of measure are importance and allowed us to get over the situations in many construction sites. But decrease of such experienced engineers need us to develop the new system to assist the selection of measures for the abnormality without any experiences of similar tunnelling sites. In this study, After a lot of tunnelling reinforcement methods were surveyed and the detail application were studied, an expert system was developed to predict the safety of tunnel and choose proper tunnel reinforcement system using fuzzy quantification theory and fuzzy inference rule based on tunnel information database. The expert system developed in this study have two main parts named pre-module and post-module. Pre-module decides tunnel information imput items based on the tunnel face mapping information which can be easily obtained in-situ site. Then, using fuzzy quantification theory II, fuzzy membership function is composed and tunnel safety level is inferred through this membership function. The comparison result between the predicted reinforcement system level and measured ones was very similar. In-situ data were obtained in three tunnel sites including subway tunnel under Han river. This system will be very helpful to make the most of in-situ data and suggest proper applicability of tunnel reinforcement system developing more resonable tunnel support method from dependance of some experienced experts for the absent of guide.

  • PDF