The jet fan is generally used to add thrust in the longitudinal ventilation system of road tunnel and the geometric conditions of jet fan such as the distance from tunnel wall have an effect on the performance of ventilation system. Numerical analyses on the flow in tunnel caused by operation of jet fan are presented to study the ventilation characteristics in tunnel. While the distance between jet fans in parallel installed in tunnel is changed 0.5 L/D to 3.0 L/D, the flowrate and mean velocity through tunnel are calculated for each cases. As the distance between jet fans increases, the flowrate through tunnel increases asymptotically and the momentum of tunnel flow is alike.
This paper concerns optimum design of 2-Arch tunnel. A 2-Arch tunnel adopted in a subway tunnel construction site is considered in this study. A calibrated 3D finite element model was adopted to conduct a parametric study on the lagged distance between left and right tunnel faces. The results of analysis were examined to determine optimum lagged distance for minimizing the interaction between the left and right tunnels. The results indicated that the shotcrete lining stress and the center pillar load are more influenced by the second tunnel excavation than the tunnel deformation. Also shown is that a lagged distance of 20m is sufficient to minimize the interaction between two tunnels. Fundamental mechanism of 2-arch tunnel was also investigated based on the results.
Lots of roadway tunnel have been almost constructed in forms of closely-spaced tunnel in korea. If closely-spaced tunnel is not constructed at a sufficient distance between tunnels, the problem of stability can occur. However, the case that can not secure a sufficient distance between tunnels can occur due to a difficulty in buying a lot and an issue of popular complaint and environmental disruption. Generally, tunnels are not influenced by each other when a center distance between tunnels is two times longer than tunnel diameter under the complete elastic ground and five times under the soft ground. In this study, the scaled model tests of closely-spaced tunnel by using homogeneous material were performed and induced displacements were measured around the tunnel openings during excavation. The influence of distance between tunnels on the behavior of closely-spaced tunnel was investigated.
최근 터널 건설은 종종 연약대층을 인접하여 계획하게 된다. 이러한 경우 터널 굴착은 안정화되어 있던 지반을 이완시키고 따라서 터널의 안정성에 문제를 일으킬 수 있다. 안정성에 문제를 일으킬 수 있는 주요 영향인자들을 보면 연약대층이 지표면과 이루는 각도, 연약대층과 터널의 이격거리 등을 들 수 있다. 본 연구에서는 연약대층을 인접하여 건설되는 터널의 굴착과정에서 발생하는 변위량과 균열발생 양상을 조사함으로써, 연약대층이 지표면과 이루는 각도 및 연약대층과 터널의 이격거리가 터널의 역학적 거동에 미치는 영향을 조사하였다. 연약대층이 지표면과 이루는 각도 및 연약대층과 터널의 이격거리를 변화시켜 가면서 균질한 재료를 가지고 실내 축소 모형실험을 수행하고 이를 분석하였다. 실험결과, 연약대층이 지표면과 이루는 각도가 수평에서 수직으로 변화함에 따라 터널 주변의 변위 발생량이 증가하였다. 연약대층과 터널의 이격거리가 증가함에 따라 터널 주변의 변위 발생량이 감소하였고, 특정 이격거리 이상에서 안정화되었다. 이러한 발견들은 기존의 연구결과들을 정량적으로 검증하고 확장하는 것이라 판단된다. 최종적으로 연약대층이 지표면과 이루는 각도 변화에 따른 연약대층과 터널의 적정 이격거리를 정의하였다. 이러한 기초적인 연구는 연약대층을 인접하여 신설되는 터널 설계에 보다 합리적인 제안을 할 수 있을 것으로 판단된다.
국내에서는 대부분의 도로터널이 병설터널로 건설되어 왔다. 그러나 이러한 병설터널을 건설할 때 충분한 터널 간 이격거리를 확보하지 못한다면 터널의 안정성에 문제가 될 수 있다. 근접 병설터널의 적정 이격거리에 대하여 일반적으로 지반이 완전 탄성체일 경우에는 터널 간 중심 간격이 굴착 직경(D)의 2배, 지반이 연약 지층인 경우 5배 이상으로 하면 터널 상호간에 거의 영향을 미치지 않는 것으로 보고되고 있다. 본 연구에서는 균일재료를 사용하여 근접 병설터널에 대한 축소 모형실험을 수행하고 굴착과정 중에 터널 주변에서 발생하는 변위를 측정하였다. 터널 간 이격거리가 근접터널의 거동에 미치는 영향을 조사하였다. 실험 결과는 터널 굴착과정과 파괴 단계에서 발생된 변위 벡터와 균열양상으로 표현하였다. 터널 굴착과정 중 천단부에서 발생하는 변위를 분석하여보면, 후행터널 굴착으로 추가적으로 선행터널에서 발생하는 변위는 터널 간 중심 간격이 터널직경의 두 배(2.0D)까지는 이격거리가 증가함에 따라 감소하는 경향을 보인다. 그러나 중심 간격이 2.0D를 넘으면 추가변위는 발생하지 않았다.
With the wide application of urban subway tunnels, the foundation pits of new stations and existing subway tunnels are becoming increasingly close, and even zero-distance close-fitting construction has taken place. To optimize the construction support scheme, the existing tunnel's vertical displacement is theoretically analyzed using the two-stage analysis method to understand the action mechanism of the construction of zero-distance deep large foundation pits on both sides of the existing stations; a three-dimensional numerical calculation is also performed for further analysis. First, the additional stress field on the existing tunnel caused by the unloading of zero-distance foundation pits on both sides of the tunnel is derived based on the Mindlin stress solution of a semi-infinite elastic body under internal load. Then, considering the existing subway tunnel's joints, shear stiffness, and shear soil deformation effect, the tunnel is regarded as a Timoshenko beam placed on the Kerr foundation; a sixth-order differential control equation of the tunnel under the action of additional stress is subsequently established for solving the vertical displacement of the tunnel. These theoretical calculation results are then compared with the numerical simulation results and monitoring data. Finally, an optimized foundation pit support scheme is obtained considering the pit corner effect and external corner failure mode. The research shows a high consistency between the monitoring data,analytical and numerical solution, and the closer the tunnel is to the foundation pit, the more uplift deformation will occur. The internal corner of the foundation pit can restrain the deformation of the tunnel and the retaining structure, while the external corner can cause local stress concentration on the diaphragm wall. The proposed optimization scheme can effectively reduce construction costs while meeting the safety requirements of foundation pit support structures.
The development of transportation in large cities requires the construction of twin tunnels located at shallow depth. As far as twin tunnels excavated in parallel are concerned, most of the cases reported in literature focused on considering the effect of the ground condition, tunnel size, depth, surface loads, the relative position between two tunnels, and construction process on the structural lining forces. However, the effect of the segment joints was not taken into account. Numerical investigation performed in this study using the $FLAC^{3D}$ finite difference element program made it possible to include considerable influences of the segment joints and tunnel distance on the structural lining forces induced in twin tunnels. The structural lining forces induced in the first tunnel through various phases are considerably affected by the second tunnel construction process. Their values induced in a segmental lining are always lower than those obtained in a continuous lining. However, the influence of joint distribution in the second tunnel on the structural forces induced in the first tunnel is insignificant. The critical influence distance between two tunnels is about two tunnel diameters.
The numerical simulations on the train entering a tunnel were performed by solving unsteady axi-symmetric problems. In the case that 5th order velocity profile is used to reduce the effects of the pressure wave generated by the train starting abruptly, the effect of the initial distance between the train and the tunnel were examined. The impulsive start gives undesired pressure disturbances to the flow field including inside the tunnel. But 5th order velocity profile with initial distance more than 80 m gives much stable pressure variance in time, and pressure distribution inside the tunnel in space. The distance to the train reaches the highest running velocity from the start should be more than 80 m when the train speed is 350 km/h.
도로의 터널출구에서 인터체인지 분기점 구간은 도로이용자가 본선을 주행하다가 인근 목적지로 나가기 위하여 터널을 벗어나서 전방에 설치된 표지상의 목적지 지명을 확인하고, 차로를 변경해서 인터체인지 연결로로 들어가는 단계를 갖는다. 따라서 이 구간에서는 도로이용자의 다양한 행동이 요구되므로 도로이용자의 인간공학적 요소를 중시한 도로설계가 되어야 하는 구간이다. 본 연구는 도로이용자의 인간공학 요소를 고려하여 터널출구와 인터체인지 분기점구간의 최소이격거리를 제공하고자 하였다. 연구수행을 위해서 도로주행 시뮬레이터를 이용하여 다양한 연령층(20대${\sim}$70대)이 실험에 참여하여 터널과 인터체인지 분기점 산정에 대한 통계적 검증을 수행하였다. 그 결과 터널출구에서 인터체인지 변이구간(감속차로 시점)의 시점까지는 최소 500m 이상의 거리가 확보되어야 하는 것으로 나타났다. 본 연구는 과학적인 근거를 통해서 터널과 인터체인지 분기점간의 최소이격거리 정립에 대한 기초연구 수행이 이루어졌다는 점에서 논문의 의의가 있다. 향후 이용자에게 보다 안전한 지침을 제공하여 도로주행의 안전성을 도모할 수 있는 기반을 제공할 것으로 기대할 수 있다.
최근 선형분리 곤란, 환경훼손 최소화 및 용지보상 등의 이유로 2-Arch 터널의 채택이 점점 증가하고 있다. 이런 실정에도 불구하고 2-Arch 터널은 국내에서의 시공실적 및 설계사례의 부족으로 자료의 데이터화가 체계적이지 않고 2-Arch 터널의 역학적인 거동 메커니즘에 대한 연구가 미흡한 실정이다. 따라서 본 연구에서는 2-Arch 터널의 종방향 이격거리에 대한 연구를 통해 본선 선행터널과 중앙벽체의 거동 메커니즘을 분석하고 적정 이격거리를 제안하고자 한다. 2-Arch 터널의 이격거리 산정은 터널의 안정이 확보되는 조건에서 산정하는 것이 타당하며, 이격거리에 따라 보다 민감하게 작용하는 중앙 벽체의 거동에 영향을 최소화 할 수 있는 범위내에서 이격거리를 산정하는 것이 바람직할 것으로 판단된다. 또한 이격거리에 따른 중앙벽체의 민감도 분석결과 최대 변곡점이 생겨 급격한 응력변화가 발생하는 0.5D이내를 이격거리로 산정하는 것이 타당할 것으로 사료된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.