• Title/Summary/Keyword: tunnel construction cost

Search Result 171, Processing Time 0.026 seconds

Empirical Evaluation of Wireless Mesh Networks for Construction IT in Tunnel Environments (건설-IT융합 기술을 위한 터널 환경에서 무선 메쉬 네트워크를 이용한 실험적 성능 검증)

  • Yang, Chang-Mo;Lee, Seung-Beom;Choi, Soo-Hwan;Eom, Doo-Seop
    • Journal of Information Technology Services
    • /
    • v.10 no.2
    • /
    • pp.271-279
    • /
    • 2011
  • This paper draws performance results through comparing WMNs' methods when the WMNs are used in tunnel construction sites. There are many advantages of WMNs : lower cost, easy to network maintenance, robustness and reliability within RF-ranges. As a result, using the WMNs would be suitable to employ as a network infrastructure for the construction sites. This paper evaluates the performance of WMNs which we have installed in a tunnel construction. Through the performance results, we conclude the performance of data throughputs gets lower when we perform the network in tunnel environments. We make attempts WMNs' two major methods which are SISC(Single Interface with Single Channel) and MIMC(Multi Interface with Multi Channel) to figure out which method will be better for the construction sites. Through the experiments, the WMN based on the MIMC method was comparatively suitable in network performance aspect for the tunnel Sites.

A Study on the Design/construction Standard of Unlined Tunneling Method (Unlined Tunnel 공법 지보재의 설계 및 시공 기준 고찰)

  • 서영화;김성구;나승훈
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.121-134
    • /
    • 2002
  • Tunneling is a very dangerous and expansive work. Especially, the concrete lining works need many long hours and much cost. As an alternative, the unlined tunneling methods including NMT have been developed in various country. These methods have advantages in cost, time and quality. In Korea, many considerations have been conducted to apply the unlined tunneling method in comparatively good rock. Since primary reinforcements play the role of the final supporting system in unlined tunnels, the initial stiffness and long term durability of reinforcements are very important for tunnel safety. To establish the reinforcements standard suitable to Korea, we investigated the foreign standards and construction cases, comparing geological and construction conditions of foreign land and Korea. As the result, we have proposed the standard of primary supporting system for unlined tunnel in aspects of material, design, construction and quality control etc.

  • PDF

A study on construction simulation of road tunnel using Decision Aids for Tunneling (DAT) (터널의사결정체계 (DAT)를 이용한 도로터널의 시공 시뮬레이션 연구)

  • Min, Sangyoon;Kim, Taek Kon;Einstein, H.H.;Lee, Jun S.;Kim, Ho Young
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.2
    • /
    • pp.161-174
    • /
    • 2003
  • Applicability of the Decision Aids for Tunneling (DAT) technique is investigated in this study to better understand the efficiency of the decision making process during tunnel construction. For this, a traffic tunnel under construction is adopted and information on the construction procedure, i.e., overall geology, unit cost and construction time for each excavation process, is provided periodically. Various scattergrams in which cost-time simulation results are plotted are obtained according to the simulation methods and final prediction on the construction time/cost is made. It is found that the uncertainty in the cost distribution is greater than the uncertainty in the time distribution for each cycle simulation and the uncertainties in time and cost for the one time simulations are comparable. Future work will be concentrated on the updating scheme using the face mapping data and various parametric studies will also be performed.

  • PDF

Improvement Efficiency of Tunnel Work using Site Surveying System (현장측량시스템을 이용한 터널공사의 효용성 향상)

  • Choi, Seok-Keun;Ahn, Won-Tae
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.14 no.3 s.37
    • /
    • pp.31-37
    • /
    • 2006
  • The existing tunnel survey method contains many problems of taking much measuring time, increasing construction expenses, and delaying a term of construction. Therefore the site survey system for an improvement efficiency is developed. This system will be able to solve the ewer factor and the problem of curtailment of time and expenditure. In order to solve these problems it connected a measurement equipment and a notebook computer, and developed the system which simultaneously with tunnel measurement it will be able to decide locations and errors from site at real-time. The development or the tunnel survey system minimize the error occurrence as measuring tunnel, and the probability of more or less excavation. Therefore this site survey system leads to the effect of the improvement execution quality of work, the cost reduction and the construction term reduction.

  • PDF

A Study on Analysis of Construction Monitoring Cost and Improvement Measures of Railway Tunnel Construction in Seoul (서울시 철도터널 건설공사의 공사계측비 분석 및 개선방안 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.18-30
    • /
    • 2023
  • Purpose: This study is to contribute to the development of monitoring technology through the increase of confidence in construction monitoring by deriving the analysis of construction monitoring cost and improvement measures of railway tunnel construction in Seoul. Method: It presents the status on design and contract of construction monitoring cost, status on application construction monitoring cost and its analysis, analysis on safety management cost and quality management cost, expansion of application of the price calculation standard for monitoring management services to improve this, and monitoring for direct order of ordering organization. Results: If the monitoring management service that was meanwhile ordered as included in the construction work is performed by the directly selected company of ordering organization through the preliminary screening for bidding qualification, then the improvement of monitoring quality and the accurate monitoring data can be secured. Conclusion: For the price calculation standard for monitoring management service, the application of actual cost addition method under the Engineering Promotion Act and the calculation standard of monitoring management cost for standard estimation for ground survey should be extended through the direct order of ordering organization, not the method to be included in the net construction cost where it is performed by a subcontractor via contractor.

Study on Development for Plan Model of Tunnel construction by using Arena;on focused NATM (ARENA를 활용한 터널공사계획모델 개발에 관한 연구;NATM공법을 대상으로)

  • Lee, Si-Wook;Kim, Ok-Ki;Woo, Sung-Kwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.872-875
    • /
    • 2007
  • Estimation of total construction period and cost in the early stage of the project is very important. Simulation is one of the method considering proper compound such as tools, materials for effective construction management and estimating and analysing affected factors to construction through making suitable process. This study is to develop the model by using Arena simulation considering limited facts like blast time in a subway tunnel construction of both sides inner city. Developed model is easily useful type by using Visual Basic program, and can obtain total construction period and cost as a result. It could be used as a decision making tool in early stage of the construction.

  • PDF

Development of Tunnel Asset Management (TAM) Program

  • Hamed Zamenian;Dae-Hyun (Dan) Koo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.576-582
    • /
    • 2013
  • Typical highway infrastructure systems include roadway pavement, drainage systems, tunneling, and other hardware components such as guardrails, traffic signs, and lighting. Tunnels in a highway system have provided significant advantages to overcoming various natural challenges including crossing underneath bodies of water or through mountainous areas. While only a few tunnel failure cases have been reported, the failure rate is likely to increase as these assets age and because agencies have not emphasized tunneling asset management. A tunnel system undergoes a deterioration life cycle pattern that is similar to other infrastructure systems. There are very few agencies in the United States implementing comprehensive tunnel asset management programs. While current tunnel asset management programs focus on inspection, maintenance, and operation safety, there is an increasing need for the development of a comprehensive life cycle tunnel asset management program. This paper describes a conceptual framework for a comprehensive tunnel asset management program. The framework consists of three basic phases including a strategic plan, a tactical plan, and an operational plan to provide better information to the decision makers. The strategic plan is a basic long term approach of tunnel asset management. The tactical plan determines specific objectives and the operational plan actually applies asset management objectives in practice. The information includes operational condition, structural condition, efficiency of the system, emergency response, and life cycle cost analysis for tunnel capital improvement project planning.

  • PDF

Applicability of the single shell tunnel in Korea from the economic evaluation (경제성 분석에 의한 싱글쉘 터널의 국내 적용성 검토 연구)

  • Kim, Hak-Joon;Shin, Hyu-Seong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.2
    • /
    • pp.167-175
    • /
    • 2008
  • The construction cost for the single shell tunnel is cheaper than that of the double shell tunnel according to the case studies performed in several domestic and foreign tunnels. However, the economic advantage of single shell tunnel drops drastically as the condition of the rock mass deteriorates. Therefore, the single shell tunnelling method should be applied to the good rock mass conditions. The application of the single shell tunnelling method to tunnels in Korea should be determined considering the ratio between the good rock and poor rock masses along the tunnel section. The use of the single shell tunnel is expected to offend depending on the cheap supply of high quality shotcrets and rock bolts developed for single shell tunnels.

  • PDF

The Impacts of Reduced Labor Hours on the Construction Period and Cost of Tunnel Project (근로시간 단축에 따른 터널 공사의 표준 공기 및 공사비 영향 분석)

  • Park, Taeil;Kim, Kyunghoon;Shin, Eun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.37-43
    • /
    • 2019
  • After the new standards for labor hours has been released, various problems come up in construction field, such as income reduction of employees, extension of construction period and increased construction cost. Although it is expected that the impact of the new standard on the construction industry is more worse than other industries form the view of productivity, not much works have been done to identify those impacts. Thus, this research proposes the standard construction processes, excavation cycle, and unit construction period for NATM tunnel project based on 'Construction Standard Production Rates.'The study also investigated the impact of reduced labor hours on the management of work crews, construction periods and costs of tunnel projects. The results showed that under the 52 labor hour standard, the construction periods for the excavation work and whole project was increased by 20% and 8.9%, respectively, but the construction costs for the excavation work and whole project was decreased by 1.4% and 0.6%, respectively.

A Case Study for the 1st Double-level Tunnel for Light vehicle in Urban Area in Korea (국내 최초 소형차 전용 도심지 대심도 복층터널 설계 사례)

  • Kim, Gyoung-Hun;Choi, Jun-Dong;Jun, Duk-Chan;Shin, Il-Jae;Sim, Dong-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1302-1313
    • /
    • 2010
  • The west express way is notorious for extremely heavy traffic area in the west of Seoul, South Korea. Hence, the city government recently initiated a new underground BTO (Build-Transfer-Operate) road project to solve traffic congestion and a high construction cost. The proposed underground express road being designed is the first double-level tunnel ever designed in South Korea and using Conventional tunnelling method (NATM). A total length of tunnel for light vehicles is 10.91km long including both open cut structures and concrete lining with middle-deck in bored tunnel. There are also 4 ventilation shafts for ventilation and evacuation on emergency. Many design issues had been aroused during the preliminary design phase and detail design phase is currently going on. This paper discusses design focuses including excavation methods, ground water issues, a deck slab installation, and a construction cost etc. for the double level road tunnel design of urban area.

  • PDF