• 제목/요약/키워드: transmission tower-line system

검색결과 63건 처리시간 0.028초

Fault Location for Incomplete-Journey Double-Circuit Transmission Lines on Same Tower Based on Identification of Fault Branch

  • Wang, Shoupeng;Zhao, Dongmei;Shang, Liqun
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권5호
    • /
    • pp.1754-1763
    • /
    • 2017
  • This paper analyses the characteristics of incomplete-journey double-circuit transmission lines on the same tower formed by single-circuit lines and double-circuit lines, and then presents a fault location algorithm based on identification of fault branch. With the relationship between the three-phase system and the double-circuit line system, a phase-mode transformation matrix for double-circuit lines can be derived. Based on the derived matrix, the double-circuit lines with faults can be decoupled, and then the fault location for an incomplete-journey double-circuit line is achieved by using modal components in the mode domain. The algorithm is divided into two steps. Firstly, the fault branch is identified by comparing the relationships of voltage amplitudes at the bonding point. Then the fault location, on the basis of the identification result, is calculated by using a two-terminal method, and only the fault distance of the actual fault branch can be obtained. There is no limit on synchronization of each terminal sampling data. The results of ATP-EMTP simulation show that the proposed algorithm can be applied within the entire line and can accurately locate faults in different fault types, fault resistances, and fault distances.

미얀마 송전선로 설계 기술계산시스템 개발 (Development of the Technical Calculation System for Transmission Line in Myanmar)

  • 백승도;민병욱;김종화;신태우;김세현;박재웅
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.632-634
    • /
    • 2005
  • Korea takes part in overseas business by use of accumulated advanced technology through construction of the worlds first 765kV double circuit transmission system designed with pure local technology. 'Development Study on the Power System Network Analysis in Myanmar' was received in the year 2001 and was completed in the year 2002. The following project,'Feasibility Study and Basic Designs for the 500kV Transmission System in Myanmar' has been in progress since January, 2004. With regards to this project the master plan for the Myanmar long term power system was submitted in January 2005, and now the basic designs for the 500kV transmission system construction are in progress. Technical data for the design of the transmission line is calculated using a very complex numerical formula that is almost impossible to be completed by hand. So the transmission technical calculation system was developed to calculate and support Myanmar technical data for the design of transmission line with respect to factors such as wind prossure load, tower design data conductor design data and insulator design data on the basis of weather conditions for the Myamar transmission line design area of the Myanmar 500kV trans- mission line construction basic design.

  • PDF

송전선로 건설공사 연삭 삭도공법 개발 (Development of a Transport Method to use Continuous Cableway System for Transmission Line Construction Work)

  • 백승도;민병욱;김상덕;최진성;김도화
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.679-681
    • /
    • 2005
  • The materials for transmission line construction were transported by road which opened in mountainous areas until the mid 1990s, However, from the mid 1990s, as social interest in the environment standard increases, a cable way and helicopter transport methods of construction have been applied to minimize damage to the environment and to build an environmental friendly system. The current cable way method is a single cable way system which has a lower section base to load materials into a carriage and carry them to the tower construction site by use of an engine and a main rope. Then the carriage lowers itself via a slope between the tower construction site and the lower section base. The single cable way system has the demerits of site acquisition for the lower section base, forest felling when installing the wire rope, and it is not applicable to a even topology Also it has to be installed separately at each tower site. Accordingly, to carry materials without forest felling and regardless of slope, the chain cable way system was developed to provide materials for more than two towers consecutively by use of an engine carriage and winch.

  • PDF

해외사업용 송전선로 설계시스템 개발 (Development of the Transmission Line Design System for Overseas Projects)

  • 민병욱;김종화;최석준;방항권;최한열
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.129-131
    • /
    • 2006
  • KEPCO constructed the first 765kV 2 circuit transmission line in the world with its home grown technologies. Through this 765kV transmission system project, KEPCO accumulated experience and technologies related to the 765 kV power system. Based on the successful completion of the 765kV transmission project, KEPCO is conducting overseas business by using its abundant experience and know-how. In particular, KEPCO developed the training course for power system, called the ATT (Advanced Transmission Technology) training courses for overseas business, especially for developing countries. Therefore, KEPCO developed the "Transmission line design system for overseas projects". This system supports the calculation of wind pressure load, tower design, wire selection, insulation design, etc. by applying the meteorological data of foreign countries and design standards. And this system is applied to the training program so that the trainees can design the optimal transmission line for their own countries.

  • PDF

Finite element modelling of self-supported transmission lines under tornado loading

  • Altalmas, A.;El Damatty, A.A.
    • Wind and Structures
    • /
    • 제18권5호
    • /
    • pp.473-495
    • /
    • 2014
  • Localized wind events, in the form of tornadoes and downbursts, are the main cause of the large number of failure incidents of electrical transmission line structures worldwide. In this study, a numerical model has been developed to study the behaviour of self-supported transmission lines under various tornado events. The tornado wind fields used were based on a full three-dimensional computational fluid dynamics analysis that was developed in an earlier study. A three-dimensional finite element model of an existing self-supported transmission line was developed. The tornado velocity wind fields were then used to predict the forces applied to the modelled transmission line system. A comprehensive parametric study was performed in order to assess the effects of the location of the tornado relative to the transmission line under F2 and F4 tornado wind fields. The study was used to identify critical tornado configurations which can be used when designing transmission line systems. The results were used to assess the sensitivity of the members' axial forces to changes in the location of the tornado relative to the transmission line. The results were then used to explain the behaviour of the transmission line when subjected to the identified critical tornado configurations.

낙뢰로부터 전력설비 보호를 위한 한전의 절연설계 기준 (Insulation Design Standards for Protection of Power System against Lightning in Korea Electric Power Corporation)

  • 우정욱;문재덕
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제55권12호
    • /
    • pp.555-560
    • /
    • 2006
  • As it has been reported that more than 60% of transmission line faults occurs due to lightning strokes, lighting is one of concerned issues in electric power utility company. Most of transmission line is double circuit in Korea. Double circuit outages account for 33.7 percent of total lightning faults from 1996 to 2004. Even though transmission fault might be cleared shortly by protective system, it could deteriorate the power quality accompanied with sag or flicker. Moreover, double circuit fault may lead to more aggravated situation, for instance, blackout. To Protect transmission lines from lightning stroke, reduction of tower footing resistance, multiple ground wires and unbalanced insulation in double circuit lines have been adopted. In this paper, we would like to introduce insulation design standards for lightning protection of Korea Electric Power Corporation.

Insulation Design and Reliability Evaluation of ±80kV HVDC XLPE Cables

  • Jung, Chae-Kyun;Park, Hung-Sok;Kang, Ji-Won
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권3호
    • /
    • pp.1002-1008
    • /
    • 2014
  • This paper describes insulation design and its reliability evaluation of ${\pm}80kV$ HVDC XLPE cable. Recently, the construction of HVDC transmission system, which is combined overhead line with underground cable, has been completed. This system is installed with existing 154 kV AC transmission line on the same tower. In this paper, the lightning transient analysis is firstly reviewed for selection of basic impulse insulation level and nominal insulation thickness. Then the electrical performance tests including load cycle test and superimposed impulse test based on CIGRE TB 496 are performed to evaluate the reliability of newly designed HVDC cable. There is no breakdown for ${\pm}80kV$ HVDC XLPE cable during electrical performance test. Finally, this system is installed in Jeju island based on successful electrical performance test (Type test). After installation tests are also successfully completed.

송전철탑 부근의 대지전위 억제를 위한 이격거리 산정모델 연구 (A Study on Separation Distance Calculation Model for Limitation of Earth Potential Rise Nearby Tower Footings)

  • 최종기;조환구;김태영;이동일
    • 전기학회논문지
    • /
    • 제57권2호
    • /
    • pp.179-183
    • /
    • 2008
  • In case of a line-to-ground fault at transmission lines, a portion of fault current will flow into the earth through the footings of the faulted tower causing electrical potential rise nearby the faulted tower footings. In this situation, any buried pipelines or structures nearby the faulted tower can be exposed to the electrical stress by earth potential rise. Although many research works has been conducted on this phenomena, there has been no clear answer of the required separation distance between tower footings and neary buried pipeline because of its dependancy on the soil electrical charactersics of the concerned area and the faulted system. In this paper, an analytical formula to calculate the requried sepeartion distance from the faulted tower has been derived.

송전철탑 부근의 대지전위 억제를 위한 이적거리 산정모델 연구 (A Study on Separation Distance Calculation Model for Limitation of Earth Potential Rise nearby Tower Footings)

  • 최종기;이동일
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 Techno-Fair 및 추계학술대회 논문집 전기물성,응용부문
    • /
    • pp.212-213
    • /
    • 2007
  • In case of a line-to-ground fault at transmission lines, a portion of fault current will flow into the earth through the footings of the faulted tower causing electrical potential rise nearby the faulted tower footings. In this situation, any buried pipelines or structures nearby the faulted tower can be exposed to the electrical stress by earth potential rise. Although many research works has been conducted on this phenomena, there has been no clear answer of the required separation distance between tower footings and neary buried pipeline because of its dependancy on the soil electrical charactersics of the concerned area and the faulted system. In this paper, an analytical formula to calculate the requried sepeartion distance from the faulted tower has been derived.

  • PDF

Finite element modelling of transmission line structures under tornado wind loading

  • Hamada, A.;El Damatty, A.A.;Hangan, H.;Shehata, A.Y.
    • Wind and Structures
    • /
    • 제13권5호
    • /
    • pp.451-469
    • /
    • 2010
  • The majority of weather-related failures of transmission line structures that have occurred in the past have been attributed to high intensity localized wind events, in the form of tornadoes and downbursts. A numerical scheme is developed in the current study to assess the performance of transmission lines under tornado wind load events. The tornado wind field is based on a model scale Computational Fluid Dynamic (CFD) analysis that was conducted and validated in a previous study. Using field measurements and code specifications, the CFD model data is used to estimate the wind fields for F4 and F2 full scale tornadoes. The wind forces associated with these tornado fields are evaluated and later incorporated into a nonlinear finite element three-dimensional model for the transmission line system, which includes a simulation for the towers and the conductors. A comparison is carried between the forces in the members resulting from the tornadoes, and those obtained using the conventional design wind loads. The study reveals the importance of considering tornadoes when designing transmission line structures.