• 제목/요약/키워드: transmission reliability costs

검색결과 30건 처리시간 0.022초

송전계통의 신뢰도 비용 배분 방만에 대한 연구 (An Approach to Allocating Transmission System Reliability Cost)

  • 정구형;신영균;김발호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제51권4호
    • /
    • pp.183-187
    • /
    • 2002
  • The efficient and rational transmission tariff structure is one of the crucial factors in creation of fair and competitive electricity markets. Transmission charge can be largely categorized into the line usage charge, system reliability charge, access charge and others. Any transmission tariff should be able to reflect these cost components reasonably. This paper suggests an approach amenable to allocating the transmission reliability costs reasonably with reflection of line sensitivity and line outage rate.

Application of Particle Swarm Optimization to the Reliability Centered Maintenance Method for Transmission Systems

  • Heo, Jae-Haeng;Lyu, Jae-Kun;Kim, Mun-Kyeom;Park, Jong-Keun
    • Journal of Electrical Engineering and Technology
    • /
    • 제7권6호
    • /
    • pp.814-823
    • /
    • 2012
  • Electric power transmission utilities make an effort to maximize profit by reducing their electricity supply and operation costs while maintaining their reliability. The development of maintenance strategies for aged components is one of the more effective ways to achieve this goal. The reliability centered approach is a key method in providing optimal maintenance strategies. It considers the tradeoffs between the upfront maintenance costs and the potential costs incurred by reliability losses. This paper discusses the application of the Particle Swarm Optimization (PSO) technique used to find the optimal maintenance strategy for a transmission component in order to achieve the minimum total expected cost composed of Generation Cost (GC), Maintenance Cost (MC), Repair Cost (RC) and Outage Cost (OC). Three components of a transmission system are considered: overhead lines, underground cables and insulators are considered. In regards to aged and aging component, a component state model that uses a modified Markov chain is proposed. A simulation has been performed on an IEEE 9-bus system. The results from this simulation are quite encouraging, and then the proposed approach will be useful in practical maintenance scheduling.

Reliability-guaranteed multipath allocation algorithm in mobile network

  • Jaewook Lee;Haneul Ko
    • ETRI Journal
    • /
    • 제44권6호
    • /
    • pp.936-944
    • /
    • 2022
  • The mobile network allows redundant transmission via disjoint paths to support high-reliability communication (e.g., ultrareliable and low-latency communications [URLLC]). Although redundant transmission can improve communication reliability, it also increases network costs (e.g., traffic and control overhead). In this study, we propose a reliability-guaranteed multipath allocation algorithm (RG-MAA) that allocates appropriate paths by considering the path setup time and dynamicity of the reliability paths. We develop an optimization problem using a constrained Markov decision process (CMDP) to minimize network costs while ensuring the required communication reliability. The evaluation results show that RG-MAA can reduce network costs by up to 30% compared with the scheme that uses all possible paths while ensuring the required communication reliability.

The Best Line Choice for Transmission System Expansion Planning on the Side of the Highest Reliability Level

  • Sungrok Kang;Trungtinh Tran;Park, Jaeseok;Junmin Cha;Park, Daeseok;Roy Billinton
    • KIEE International Transactions on Power Engineering
    • /
    • 제4A권2호
    • /
    • pp.84-90
    • /
    • 2004
  • This paper presents a new method for choosing the best line for transmission system expansion planning considering the highest reliability level of the transmission system. Conventional methodologies for transmission system expansion planning have been mainly focused on economics, which is the minimization of construction costs. However, quantitative evaluation of transmission system reliability is important because successful operation and planning of an electric power system under the deregulated electricity market depends on transmission system reliability management. Therefore, it is expected that the development of methodology for choosing the best lines considering the highest transmission system reliability level while taking into account uncertainties of transmission system equipment is useful for the future. The characteristics and effectiveness of the proposed methodology are illustrated by the case study using a MRBTS.

A Study on Optimal Planning Strategy Based on Customer Outage Costs

  • Kim, Bal-Ho H.
    • Journal of Electrical Engineering and Technology
    • /
    • 제5권1호
    • /
    • pp.21-27
    • /
    • 2010
  • This paper examines the long-run social welfare maximization problems facing public utilities, which includes consideration of the cost of capital or other fixed costs of production, from which it derives optimal investment decisions in a reliability differentiated pricing based market. Reliability differentiated pricing policies lead to straightforward mathematical results on optimal investment decisions in generation and transmission expansion planning. This paper presents the mathematical conditions for optimal investment decisions.

송전선 이용료상의 적정 신뢰도비용 산정방안 (Allocation of Transmission Reliability Charge)

  • 유청일;신영근;김발호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.67-69
    • /
    • 2001
  • It is required to develop a rational transmission tariff system to ensure the fair participation of the players in the market. This study suggests an improved transmission tariff system which classifies the line capacity into line usage and reliability capacity based on their use and reasonably allocates the costs incurred by each of them to users. In addition, it takes the system load variations into consideration.

  • PDF

계통계획 수위용 공급지장비의 추정방법 및 이의 응용에 관한 연구 (A Study on the Assessment and Application of Outage Cost for Power System Expansion Planning)

  • 최재석;강성록;트룬틴트란;김호용;김슬기
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권5호
    • /
    • pp.285-295
    • /
    • 2004
  • The outage cost assessment has an important position for determination of the optimal level or optimal range of reliability for power system expansion planning. Establishing the worth of service reliability is a very difficult and subjective task. While the utility cost(reliability cost) will generally increase as consumers are provided with higher reliability, the consumer costs(reliability worth) associated with supply interruptions will decrease as the reliability increases. The total costs to society are the sum of these two individual costs and the optimum or target level of reliability is achieved at minimum point of the total cost curve. This paper addresses the role, need and assessment algorithms and methodologies of the outage cost in power system expansion planning. In a case study, the outage cost has been assessed using macro approach for our country 15years(1986-200l) in the case study. Additionally, determination processing of optimum reliability level is presented in another case study with the five buses MRBTS.

Maintenance Priority Index of Overhead Transmission Lines for Reliability Centered Approach

  • Heo, Jae-Haeng;Kim, Mun-Kyeom;Kim, Dam;Lyu, Jae-Kun;Kang, Yong-Cheol;Park, Jong-Keun
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권4호
    • /
    • pp.1248-1257
    • /
    • 2014
  • Overhead transmission lines are crucial components in power transmission systems. Well-designed maintenance strategy for overhead lines is required for power utilities to minimize operating costs, while improving the reliability of the power system. This paper presents a maintenance priority index (MPI) of overhead lines for a reliability centered approach. Proposed maintenance strategy is composed of a state index and importance indices, taking into account a transmission condition and importance in system reliability, respectively. The state index is used to determine the condition of overhead lines. On the other hand, the proposed importance indices indicate their criticality analysis in transmission system, by using a load effect index (LEI) and failure effect index (FEI). The proposed maintenance method using the MPI has been tested on an IEEE 9-bus system, and a numerical result demonstrates that our strategy is more cost effective than traditional maintenance strategies.

Transmission Network Expansion Planning Using Reliability and Economic Assessment

  • Kim, Wook-Won;Son, Hyun-Il;Kim, Jin-O
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권3호
    • /
    • pp.895-904
    • /
    • 2015
  • This paper presents a probabilistic approach of reliability evaluation and economic assessment for solving transmission network expansion planning problems. Three methods are proposed for TNEP, which are reorganizing the existing power system focused on the buses of interest, selecting candidates using modified system operating state method with healthy, marginal and at-risk states, and finally choosing the optimal alternative using cost-optimization method. TNEP candidates can be selected based on the state reliability such as sufficient and insufficient indices, as proposed in this paper. The process of economic assessment involves the costs of construction, maintenance and operation, congestion, and outage. The case studies are carried out with modified IEEE-24 bus system and Jeju island power system expansion plan in Korea, to verify the proposed methodology.

송전계통의 신뢰도 비용 산정 방안에 대한 연구 (An Approach To Alloctating Transmission System Reliabity Cost)

  • 정구형;신영균;김발호;임성황
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 A
    • /
    • pp.515-517
    • /
    • 2001
  • The efficient and rational transmission rate system is one of the crucial factors in creation of fair and competitive electricity market. Transmission charge can be largely categorized into the line usage charge, system reliability maintenance charge, access charge and others. Therefore, transmission rate structure should be able to reflect these cost components reasonably. This Paper suggests an approach that could be used for the reasonable calcuation of transmission reliability costs with reflection of line sensitivity and line outage rate.

  • PDF