• Title/Summary/Keyword: train load

Search Result 634, Processing Time 0.025 seconds

Study about varying aspects of flicker indices by load fluctuating in electric railway system (전기철도환경하에서 부하변동에 따른 플리커지수의 변화양상에 대한 연구)

  • Lee Kang-Won;Kim Myung-Yong;Baik Kwang-Sun;Kim Won-Kyung
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.655-659
    • /
    • 2005
  • The environment. of electric railway has, included both fast and slow load variation, which may occur in the office or maintenance factory or running electric train. This paper investigated flicker indices according to voltage fluctuations on three different situations; The base office in new subway in the daytime and night time, inside of electric train running in conventional subway. And also the variations of harmonic frequencies(2nd, 3rd, 5th) with rime were measured at the same time. Flicker index is a good tool for evaluating the voltage fluctuation quantitatively and show some relationship with even harmonic frequencies produced by the voltage fluctuation when the electric train is running on the railway.

  • PDF

Characteristics of Current Collection Signals during Test Run of High-speed Train (주행 중 발생하는 고속전철 집전계 신호의 특성)

  • 이시우;김정수;조용현;최강윤
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.3
    • /
    • pp.232-238
    • /
    • 2004
  • The dynamic characteristics of the current collection process of the high-speed railway are investigated through signals acquired during a test run. The signals are obtained from accelerometers, load cells, and strain gauges attached to various positions of the pantograph, and they are processed in time-and frequency-domains to obtain the dynamic characteristics. The main natural frequency of the pantograph is found to be 8.5Hz. There also are components at low frequencies varying linearly with the train speed. The contact frequency components above 20Hz is attenuated as they pass through the secondary suspension. The main frequency component of the load cell signal is found to be related with the rolling motion of the panhead generated by the stagger in the catenary.

Investigation on vibration behavior of a high-speed railway bridge based on monitoring data

  • Qingxin Zhu;Hao Wang;Billie F. Spencer Jr
    • Smart Structures and Systems
    • /
    • v.31 no.6
    • /
    • pp.585-599
    • /
    • 2023
  • Field monitoring techniques offer an attractive approach for understanding bridge behavior under in-service loads. However, the investigations on bridge behavior under high-speed train load using field monitoring data are limited. The focus of this study is to explore the structural behavior of an in-service long-span steel truss arch bridge based on field monitoring data. First, the natural frequencies of the structure, as well as the train driving frequencies, are extracted. Then, the train-induced bearing displacement and structural strain are explored to identify the effects of train loads and bearings. Subsequently, a sensitivity analysis is performed for the impact factor of strain responses with respect to the train speed, train weight, and temperature to identify the fundamental issues affecting these responses. Additionally, a similar sensitivity analysis is conducted for the peak acceleration. The results indicate that the friction force in bearings provides residual deformations when two consecutive trains are in opposite directions. In addition, the impact factor and peak acceleration are primarily affected by train speed, particularly near train speeds that result in the resonance of the bridge response. The results can provide additional insight into the behavior of the long-span steel truss bridges under in-service high-speed train loads.

A Study on Fluctuating Pressure Load on High Speed Train Passing through Tunnels

  • Seo Sung-Il;Park Choon-Soo;Min Oak-Key
    • Journal of Mechanical Science and Technology
    • /
    • v.20 no.4
    • /
    • pp.482-493
    • /
    • 2006
  • The carbody structure of a high speed train passing through a tunnel is subjected to pressure fluctuation. Fatigue strength of the carbody structure against the fluctuating pressure loading should be proved in the design stage for safety. In this study, to get the useful information on the pressure fluctuation in the tunnel, measurement has been conducted during test running of KHST on the high speed line for two years. The measured results were analyzed and arranged to be used for carbody design. A prediction method for the magnitude and frequency of pressure change was proposed and the propagating characteristics of pressure wave was investigated. By statistical analysis for the measured results, a pressure loading spectrum for the high speed train was given. The proposed method can also be used to estimate the pressure loading spectrum for new high speed line at design stage combined with the results of train performance simulation.

A Study on the Assessment of Track Stabilization on Ballast Cleaning work site (크리너 작업구간 선로안정화 상태평가에 관한 연구)

  • Jeon, Il-Sik;Lee, Syeung-Youl;Choi, Hyoung-Su;Kim, Han-Chip
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.268-274
    • /
    • 2011
  • In railway, Ballast plays an essential role as intermedium in transmitting train load to subgrade safely. Gyoung-Bu HSL 1st phase consists of ballasted track except for over 5km long tunnels. Ballast track occurred track irregularity by train loads and requires periodic maintenance work. However, Repetitive train operation and tamping work cause to accelerate track irregularity and ballast deterioration such as abrasion and crushing. For these reason, Track irregularity areas had occurred ballast cleaning work to improve track quality. However, for the train to run safety, ballast cleaner working area needs train speed reduction and track stabilization work due to ballast relaxation and initial settlement. In this study, according to train speed-up and cumulative traffic tonnage, we measured and analyzed the track settlement and acceleration of sleepers to evaluate of track stabilization in order to keep the ballast condition stable after cleaning work.

  • PDF

A Study on the RC and PSC structure System of the Transrapid in Germany (독일자기부상열차 Transrapid의 콘크리트 교각선로구조물에 관한 연구)

  • Kang, Bo-Soon;Kim, Soo-Sam
    • Journal of the Korean Society for Railway
    • /
    • v.1 no.1 s.1
    • /
    • pp.20-29
    • /
    • 1998
  • State of the art and current issues related with the RC and PSC structure system for the German magnetic levitation train "Transrapid" were investigated. The German magnetic levitation train adopted a new kind of a structure to enable high-speed transportation, which allows the use of the space over a ground. The loading from Transrapid is light-weight compared with a regular train due to load distribution to a supporting structure. Therefore, Transrapid is considered an economical and efficient transportation system, and is also an environmentally-sustainable structure. In this paper, the structural design and construction technology specific to a magnetic levitation train were discussed, and structural considerations related with an actual operation of the train were pointed out. In addition, the future research area of a magnetic levitation train was proposed.

  • PDF

Vertical Vibration Control of High Speed Train-Steel Arch Bridge using Vibration Control Device (진동제어장치를 이용한 고속열차-강아치교의 수직진동제어)

  • 고현무;강수창;유상희;옥승용;추진교
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2003.09a
    • /
    • pp.360-367
    • /
    • 2003
  • This paper presents passive vibration control method to suppress train-induced vibration on a long-span steel arch bridge. According to the train load frequency analysis, undesirable resonance of a bridge will occur when the impact frequency of the train axles are close to the modal frequencies of the bridge. Because the first mode shape of the long-span steel arch bridge may take anti-symmetric shape along the bridge direction, however, the optimal control configuration for resonance suppression should be considered carefully In this study, bridge-vehicle element is used to estimate the bridge-train interaction precisely. From the numerical simulation of a loom steel arch bridge under TGV-K train loading, dynamic magnification influences are evaluated according to vehicle moving speed and efficient control system with passive dampers are presented in order to diminish the vertical displacement and vertical acceleration.

  • PDF

The study on the buckling instability of tube type crash energy absorber (튜브형 충돌에너지흡수부재의 좌굴불안전성에 대한 연구)

  • Choi, Won-Mok;Jung, Hyun-Sung;Kwon, Tae-Su
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1564-1570
    • /
    • 2007
  • There are normally two types of the energy absorbers used in the crashworthiness of trains. The first is a structure type, which mainly used in not only the primary structures of the train but also the crash energy absorbers at the accident. The second is a module type, which just absorbs the crash energy independent of the primary structures and attached to the structures of the train. The expansion and inversion tube are widely used as the module type crash energy absorbers, especially in the train. The tubes should not be buckled under the load acting on the end of the tube in longitudinal direction during absorbing the crash energy. The buckling stability of the tubes is affected by the boundary conditions, thickness and length of tube. In this study, the effects of the length and thickness of the tubes on the buckling load are studied by using the ABAQUS, a commercial finite element analysis program, and then presents the guideline to design the tube. The analysis processes to compute the buckling load consist of a linear buckling analysis and a nonlinear post-buckling analysis. The buckling modes are evaluated by the linear buckling analysis, as using these modes, the buckling loads are computed by the nonlinear post-buckling analysis.

  • PDF

Express Train Choice and Load Factor Analysis as Line Extension in Seoul Metro 9 (서울지하철 9호선 2단계 개통에 따른 급행열차 선택 및 혼잡도 변화분석)

  • Kim, Kyung Min;Oh, Suk Mun;Rho, Hag Lae
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.5
    • /
    • pp.663-671
    • /
    • 2016
  • This paper investigates how to change passengers' preferences for express trains according to line extension in Seoul Metro Line 9. Before-and-after line extension, we traced passengers' path choices using Smart Card data via the method suggested by Kim et al. (2015). We developed two multinomial logit models before-and-after line extension. Transferability test showed that there is no difference between the two models. However, the load factor of the express train increased by 6.7% and the gap between the local and express trains became significantly wider.

A new look at the restrictions on the speed and magnitude of train loads for bridge management

  • Aflatooni, Mehran;Chan, Tommy H.T.;Thambiratnam, David P.
    • Structural Engineering and Mechanics
    • /
    • v.53 no.1
    • /
    • pp.89-104
    • /
    • 2015
  • In current bridge management systems (BMSs), load and speed restrictions are applied on unhealthy bridges to keep the structure safe and serviceable for as long as possible. But the question is, whether applying these restrictions will always decrease the internal forces in critical components of the bridge and enhance the safety of the unhealthy bridges. To find the answer, this paper for the first time in literature, looks into the design aspects through studying the changes in demand by capacity ratios of the critical components of a bridge under the train loads. For this purpose, a structural model of a simply supported bridge, whose dynamic behaviour is similar to a group of real railway bridges, is developed. Demand by capacity ratios of the critical components of the bridge are calculated, to identify their sensitivity to increase of speed and magnitude of live load. The outcomes of this study are very significant as they show that, on the contrary to what is expected, by applying restriction on speed, the demand by capacity ratio of components may increase and make the bridge unsafe for carrying live load. Suggestions are made to solve the problem.