• Title/Summary/Keyword: total time length

Search Result 1,028, Processing Time 0.027 seconds

Comparison of Nursing Activity Costs of Chronic Otitis Media Surgery Patients among Time, RBRVS, and CP (상대가치, 소요시간, 표준임상경로지에 의한 만성중이염수술 간호원가 비교분석)

  • Kim, Mi-Sun;Lim, Ji-Young
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.16 no.4
    • /
    • pp.399-408
    • /
    • 2010
  • Purpose: The purpose of this study was to compare the cost using different methods of costing nursing activities for patients with chronic otitis media having surgery. Method: Data were collected from 30 patients who had mastoidectomy and tympanoplasty. To compare the cost, the researchers used three different costing methods; consumed time, resource based relative value scale (RBRVS), and critical pathway (CP). Results: Twenty-six nursing activities for surgical patients with chronic otitis media were found. Total cost was 83,843.7 won using RBRVS. The costliest activity was recording at 9,734.4 won, followed by confirmation of doctors' orders at 9,302.4 won, and injection with infusion pump at 9,072.0 won. There was a difference in nursing activities performed according to the length of hospital stay, and the cost was highest on the surgery day at 13,417.8 won. Comparatively, the total cost was 72,014.4 won using CP. Conclusions: Nursing activities are performed in various forms according to the disease and patient's condition, and different nursing activities are executed according to the length of hospital stay. In order to measure the load of nursing activities and distribute it appropriately, it is necessary to analyze the cost of nursing activities by the process of nursing services performed.

Determining Ideal Distance between Consecutive Exit Ramps (고속도로 연결로상 연속 분류지점 간의 이격거리 검토)

  • Lee, Seongkwan Mark;Lee, Ki Young;Jang, Jung Hwa
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.1D
    • /
    • pp.65-72
    • /
    • 2011
  • When an expressway intersects another expressway, a unique connector needs to be designed between the two consecutive exit ramps. In such a case, it is important to design a connector such that there is enough distance for drivers to find their way safely. A current design manual in Korea prescribes the minimum length of the connector as 240 m. In this research, we have suggested a method for calculating the minimum length of a connector in order to check the feasibility of the currently prescribed length. For this purpose, we have attempted to determine the total perception-reaction time and lane-changing time required by a driver. For determining the driver's perception-reaction time, we have used the driver's decision time in addition to the conventional 2.5 s of perception-reaction time for stopping sight distances. We have considered both the design speed and the average travel speed for the calculation of the length. To evaluate the accuracy of the new method, we have chosen four sites on expressways for which relatively high accident rates were recorded. As a result, we could verify that the current limit (240 m) was sufficient for drivers to be able to change lanes in the given specific geometry. However, the prescribed limit should be revised in case the drivers' decision time is considered to be their perception-reaction time. All new approaches for calculating the ideal length of a connector have been carried out by taking into account the design speed as well as the average travel speed. Owing to the characteristics of the specific geometry for two consecutive exit ramps and the large difference between the design speed and the average travel speed in the objective areas, it is more realistic to use the proposed method by keeping the decision time equal to a driver's perception-reaction time, in order to determine the ideal distance that should be maintained between two consecutive exit ramps.

Associations of Perceived Stress Level, Serum Cortisol Level, and Telomere Length of Community-dwelling Adults in Korea (지역사회 거주 성인의 지각된 스트레스, 혈중 코티졸 수준 및 텔로미어 길이의 관련성)

  • Kim, A Young;Kim, Nahyun
    • Journal of Korean Biological Nursing Science
    • /
    • v.24 no.4
    • /
    • pp.235-242
    • /
    • 2022
  • Purpose: To investigate associations of perceived stress level, serum cortisol level, and telomere length of community-dwelling adults in Korea. Methods: Data of a total of 135 community-dwelling adults aged over 40 years living in D metropolitan city from December 2020 to March 2021 were collected. Perceived stress level over the past month were measured using the Perceived Stress Score. Serum cortisol level was analyzed using a chemiluminescent microparticle immunoassay. Telomere length was determined using quantitative real-time polymerase chain reaction. The statistical package SPSS 23.0 was used to perform Chi-square test, independent t-test, and Pearson's correlation coefficient analysis. Results: There was no association between perceived stress and serum cortisol level (r = .07, p= .402). Serum cortisol level was not significantly associated with telomere length either (r = -.15, p= .081). However, the higher the perceived stress level, the shorter the telomere length (r= -.29, p= .001). Conclusion: These results suggest that perceived stress might induce physiological stress, which might partially affect gene biology. Further longitudinal research is needed to investigate the effect of perceived stress on telomere length. Intervention for relieving stress should be included in stabilizing the genetic environment of adults.

Assessment of Available Transfer Capability (ATC) considering Real-time Weather Conditions (실시간 기상상태를 고려한 가용송전용량 산정)

  • Kim, Dong-Min;Bae, In-Su;Kim, Jin-O
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.3
    • /
    • pp.485-491
    • /
    • 2010
  • Total Transfer Capability (TTC) should be pre-determined in order to estimate Available Transfer Capability (ATC). Typically, TTC is determined by considering three categories; voltage, stability and thermal limits. Among these, thermal limits are treated mainly in this paper on the evaluation of TTC due to the relatively short transmission line length of Korea Electric Power Corporation (KEPCO) system. This paper presents a new approach to evaluate the TTC using the Dynamic Line Rating (DLR) for the thermal limit. Since the approach includes not only traditional electrical constraints but also real-time environmental constraints, this paper obtains more cost-effective and exact results. A case study using KEPCO system confirms that the proposed method is useful for real-time operation and the planning of the electricity market.

Advanced electromagnetic wave-based method for characterizing defects in cement-based structures using time domain reflectometry

  • Dongsoo Lee;Jong-Sub Lee;Young K. Ju;Yong-Hoon Byun
    • Computers and Concrete
    • /
    • v.33 no.5
    • /
    • pp.621-630
    • /
    • 2024
  • This study presents novel electromagnetic wave-based methods for evaluating the integrity of cement-based structures using time domain reflectometry (TDR). Two cement-based plates with embedded rebars are prepared under sound and defective conditions. TDR tests are carried out using transmission lines with various numbers of artificial joints, and electromagnetic waves are measured to assess the integrity of the plates. The experimental results show that the travel time of electromagnetic waves is consistently longer in sound plates than in defective ones, and an increase in the reflection coefficients is observed in the defect zone of the defective plates. Electromagnetic wave velocities are higher in the defective plates, especially when connectors are present in the transmission line. A novel approach based on the area of the reflection coefficient provides larger areas in the defective plates, and the attenuation effect of the electromagnetic waves induces a difference in the areas of the reflection coefficient between the two defect conditions. An alternative method using the centroid of the defect zone slightly overestimates the location of the defect zone. The length of the defect zone is estimated using the defect ratio and wave velocities of cement, air, and plate. The length of the defect zone can also be calculated using the travel times within the plate, total measured length of the plate, and wave velocities in the cement and air. Therefore, the electromagnetic wave-based methods proposed in this study may be useful for estimating the location and length of defect zones by considering attenuation effects.

Optimal replacement strategy under repair warranty with age-dependent minimal repair cost

  • Jung, K.M.
    • International Journal of Reliability and Applications
    • /
    • v.12 no.2
    • /
    • pp.117-122
    • /
    • 2011
  • In this paper, we suggest the optimal replacement policy following the expiration of repair warranty when the cost of minimal repair depends on the age of system. To do so, we first explain the replacement model under repair warranty. And then the optimal replacement policy following the expiration of repair warranty is discussed from the user's point of view. The criterion used to determine the optimality of the replacement model is the expected cost rate per unit time, which is obtained from the expected cycle length and the expected total cost for our replacement model. The numerical examples are given for illustrative purpose.

  • PDF

Numerical analysis of Self-Boring Pressuremeter test results using FEM - Consolidation characteristics of clay (유한요소해석을 이용한 SBP 시험의 결과해석 - 점성토 지반의 압밀특성)

  • 장인성;정충기
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.67-74
    • /
    • 1999
  • Self-Boring Pressuremeter Test(SBPT) is known to be the most effective in-situ test method which can reliably determine consolidation characteristics as well as deformation modules and untrained shear strength. In order to derive the coefficient of consolidation using SBPT results it is necessary to obtain the dissipation behavior from the pore pressure change with time during constant radial strain(generally 10%) and to derive the reliable time factor(Τ) from the analytical method which considers the real in-situ conditions. As previous studies on time factor are based on the assumptions of plane strain condition that the membrane of SBP is infinite, of untrained condition during the expansion of the probe and of elastic soil behavior during consolidation, these analyses can't consider the real boundary conditions and the real soil behaviour. In this study, consolidation analysis similar to real in-situ conditions including test procedure is conducted using finite element program which employs MCC model and Biot theory. Time factor considering the effects of finite membrane length, the total pressure change during consolidation and partial drainage is proposed and compared with previous results.

  • PDF

Difference of Suaeda japonica Populations from two Different Habitats in Sorae, Incheon, Korea (인천 소래 간석지내 두개의 칠면초 ( Suadeda japonica ) 개체군간의 차이에 관하여)

  • Lee, Kun-Seop;Oh, Kye-Chil
    • The Korean Journal of Ecology
    • /
    • v.12 no.3
    • /
    • pp.133-144
    • /
    • 1989
  • The morphology and flowering time of two Suaeda japonica populations from different habitats, the creek and the bank of the mudflat in Sorae, were surveyed. And standard transplantation and reciprocal transplantation were carried out to determine whether their characteristics were genetically fixed or not. Also soil sample of these habitats were analyzed. The amounts of loss on ignition, maximum field capacity, total nitrogen, exchangeable calcium and potassium, and soluble phosphorus were found to be significantly different between two habitats. Leaf thickness, leaf width, leaf length, stem height number of branches, and number of seeds were significantly different between plants of two populations. And flowering times of two populations did not overlap. According to the results of transplantation, leaf width, leaf thickness, and flowering times were the same as those at their original habitat. But the stem lenght, leaf lenght, number of branches and unmber of seeds were not. Therefore, the differences in the leaf length, leaf thickness, and flowering time seemed to bo genetically fixed. It were suggested that the creek bank populations of Suaeda japoinica were to be considered as different ecotypes.

  • PDF

Calculation of Economic CL Data for Sculptured Surface Machining (자유곡면 절삭을 위한 경제적인 CL 데이타 계산)

  • Kim, Dae-Hyeon;Choe, Byeong-Gyu
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.9 no.2
    • /
    • pp.27-35
    • /
    • 1983
  • This paper describes a procedure of generating economic cutter-location(CL) data for the machining of sculptured surfaces on a multi-axis NC milling machine. Measures of economy are the machining time (cutter move distance) and the length of NC tape (number of CL data points). The presented procedure minimizes both the number of CL data and the total distance of cutter moves, for a given cutter (spherical end-mill) size and parameteric cutting direction, while satisfying given tolerance requirements. The procedure has been implemented in FORTRAN for a smooth composite Bezier surface. The maximum allowable cutter size is calculated by the program so that a user can choose a cutter size. CL data can be generated in both parametric directions u and v. Experimental results show that there are significant differences between the parametric directions, and that cutter size should be as large as possible in order to minimize the cutting time and NC tape length.

  • PDF

WRR Cell Scheduling Algorithm for Improving Smoothing Scheme (평탄화 기법을 개선한 WRR 셀 스케쥴링 알고리즘)

  • 조해성
    • The Journal of the Korea Contents Association
    • /
    • v.3 no.3
    • /
    • pp.55-62
    • /
    • 2003
  • In this paper, I proposed a new WRR Cell Scheduling algorithm for improving the problem of existing smoothing scheme. in proposed algorithm, when queue of being service VC in present round is emptied, instead VC that difference between assigned weight and length of present buffer is biggest in all VC service. This result efficiency of bandwidth allocation is increased. And above all real-time traffic is serviced, non-real-time to allocate bandwidth of the remainder multimedia-service is possible. In one cycle, number of serviced average cell is increased. And for many eel serviced, length of total Duffer is decreased.

  • PDF