• Title/Summary/Keyword: total discharge

Search Result 1,193, Processing Time 0.033 seconds

Evaluation on Actual Discharge Data for TMDL in Nakdong River Basin (낙동강수계 수질오염총량관리를 위한 유량조사 평가)

  • Kim, Gyeong-Hoon;Kim, Yong-Seok;Park, Bae-Kyung;Yoon, Jong-Su;Shin, Chan-Ki
    • Journal of environmental and Sanitary engineering
    • /
    • v.23 no.4
    • /
    • pp.65-71
    • /
    • 2008
  • To drive efficiently total water pollution load management, needs to calculate the exact load emissions, pollution load allocation and implementation evaluation in each unit area of watershed and accurate and regular flow of data. For these reasons, the Nakdong River TMDL Research Center has produced directly or indirectly in the average interval of eight days (30 times or more / year) 41 points for unit area of the total water pollution load management and 8-point of municipal requirement for a total of 49 branches as a flow data in 2004 from August. This acquired the survey flow is evidence of trends and changes each point in the Nakdong River based on time, such as 10 years based on average design flow available to the foundation of the summit as the major water policy is to be utilized. This study was performed on actual discharge measuring data and introduced performance results each drainage basin of Nakdong River from 2004 to 2008 over the total of past five years.

Characteristics of Pollutant Loading from Paddy Field Area with Groundwater Irrigation (지하수 관개지역 논에서의 배출부하 특성)

  • 윤춘경;김병희;전지홍;황하선
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.44 no.5
    • /
    • pp.116-126
    • /
    • 2002
  • Discharge pattern and water quality were investigated in the drainage water from about 10 ha of groundwater-irrigated paddy field in the growing season of 2001. Total discharge quantity was about 1,117.2 mm in which about 75% was caused by management drainage due to cultural practice of paddy rice farming and the rest by rainfall runoff where total rainfall was about 515 mm. Dry-day sampling data showed wide variations in constituent concentrations with average of 26.14 mg/L, 0.37 mg/L, 3.54 mg/L at the inlet, and 43.60 mg/L, 0.34 mg/L, 3.58 mg/L at the outlet for CO $D_{cr}$ , T-P, and T-N, respectively. Wet-day sampling data demonstrated that generally CO $D_{cr}$ followed the discharge pattern and T-P was in opposite to the discharge pattern, but T-N did not show apparent pattern to the discharge. Discharge and load are in strong relationship. And based on regression equation, pollutant loads from groundwater irrigation area are estimated to be 288.34, 1.17, and 5.45 kg/ha for CO $D_{cr}$ , T-P, and T-N, respectively, which was relatively lower than the literature value from surface water irrigation area which implies that groundwater irrigation area might use less irrigation water and result in less drainage water, Therefore, total pollutant load from paddies irrigation with groundwater could be significantly lower than that with surface water. This study shows that agricultural drainage water management needs a good care of drainage outlet as well as rainfall runoff. This study was based on limited monitoring data of one year, and further monitoring and successive analysis are recommended for more generalized conclusion.

Fabrication of Atmospheric Coplanar Dielectric Barrier Discharge and Analysis of its Driving Characteristics (평면형 대기압 유전장벽방전장치의 제작 및 동작특성분석)

  • Lee, Ki-Yung;Kim, Dong-Hyun;Lee, Ho-Jun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.1
    • /
    • pp.80-84
    • /
    • 2014
  • The discharge characteristics of Surface Dielectric Barrier Discharge (SDBD) reactor are investigated to find optimal driving condition with adjusting various parameter. When the high voltage with sine wave form is applied to SDBD source, successive pulsed current waveforms are observed owing to multiple ignitions through the long discharge channel and wall charge accumulation on the dielectric surface. The discharge voltage, total charge between dielectrics, mean energy and power are calculated from measured current and voltage according to electrode gap and dielectric thickness. Discharge mode transition from filamentary to diffusive glow is observed for narrow gap and high applied voltage case. However, when the diffusive discharge is occurred with high applied voltage, the actual firing voltage is always lower than that with low driving voltage. The $Si_3N_4$, $MgF_2$, $Al_2O_3$ and $TiO_2$ are considered for dielectric protection and high secondary electron emission coefficient. SDBD with $MgF_2$ shows the lowest breakdown voltage. $MgF_2$ thin film is proposed as a protection layer for low voltage atmospheric dielectric barrier discharge devices.

Sediment Properties and Long-term Bed Change of Munsancheon (문산천의 유사특성 및 장기하상변동 예측)

  • Lee, Jae-Geun;Ahn, Jae-Hyun
    • Journal of Wetlands Research
    • /
    • v.13 no.2
    • /
    • pp.329-341
    • /
    • 2011
  • This study was conducted with the national river, Munsancheon, which is located in Paju-si, Gyeonggi-do. The sediment discharge of Munsancheon was directly measured to analyze the sediment characteristics, and the results were used in the numerical model to predict the long-term river bed variation. The flow-total sediment discharge relation was derived using the measured total sediment discharge, and the results were compared with the total sediment discharge that was calculated using the existing prediction formula to derive a proper sediment discharge prediction method. In the actual measurements, the total annual sediment discharge was 5,478 ton/year, and the specific sediment discharge was 29.23 ton/$km^2$/year. The Ackers & White formula resulted in the values very close to the actual measurements. With the actual sediment discharge, geographical and hydrologic data as the input variables, HEC-6 and GSTARS models were comparatively analyzed. The test results showed that the HEC-6 model is suitable for the reliable prediction of the long-term river bed variation. Accordingly, the model was used for the long-term river bed variation prediction in this study. In the case of Munsancheon, deposition was continued in the downstream area and erosion occurred in the upstream area on the whole. It was expected that the stream would be stabilized in the river bed condition of 20 years later. The river bed variation was within 1 m, which was at the significance level. In the downstream area that is influenced by tide, however, the accumulation was continuously increasing within the section 2,000-7,000 m from the outlet. It seems that this should be considered in establishing the river management plans.

Unit Mass Estimation and Analysis from Textile Spinning/Weaving Manufacturing Facility Nearby Nakdong River Basin (낙동강 수계에서 제사방적제조 업체에 대한 공정별 원단위산정 및 분석)

  • Lee, Hongshin;Son, Gontae;Gu, Jungeun;Konboonraksa T.;Lee, Hongtae;Lee, Seunghwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.22 no.5
    • /
    • pp.541-550
    • /
    • 2008
  • In this investigative study, the unit mass discharge for the major water quality parameters such as flowrate, SS, BOD, CODmn, CODcr, TN, TP from textile spinning/weaving industry nearby Nakdong river basin was estimated. To represent the respective industries, three companies from hundreds of textile spinning/weaving industries located in Nakdong river basin was carefully selected based on its manufacturing goods, flowrate and location for the estimation of unit mass discharge based on unit operation and process. There was a drastic decrease of unit mass discharge estimation between influents and effluents of water quality parameters, which represents the removal capacity of wastewater treatment plant. With the advent of new regulation on the imposed payment proportional to the total amount of pollutants discharge into the water body, the concept of cleaner production technology should be employed in the unit operation/process in wastewater treatment plant as well as textile manufacturing procedure to minimize the levy on the pollutants discharge. Unit mass discharge estimations of unit process (estimated in this study) in major water quality parameters (SS, BOD, COD, TN and TP) based on land were similar to those of composite process (estimated by National Institute of Environmental Research). But the unit mass discharge estimations of unit process in BOD and CODmn based on total sale were much higher than those of composite one while in SS, TN and TP similar to each other. For the detailed estimation of the imposed payment, unit mass estimation based on unit process should be further emphasized.

Carbon Nanotube Synthesis using Magnetic Null Discharge Plasma Production Technology

  • Sung, Youl-Moon
    • Journal of Electrical Engineering and Technology
    • /
    • v.2 no.4
    • /
    • pp.532-536
    • /
    • 2007
  • Carbon nanotube (CNT) properties, produced using a magnetic null discharge (MND) plasma production technology, were investigated. We firstly deposited the Fe layer 200 nm in thickness on Si substrate by the magnetic null discharge sputter method at the substrate temperature of $300도C$, and then prepared CNTs on the catalyst layer by using the magnetic null discharge (MND) based CVD method. CNTs were deposited in a gas mixture of CH4 and N2 at a total pressure of 1 Torr by the MND-CVD method. The substrate temperature and the RF power were $650^{\circ}C$ and 600W, respectively. The characterization data indicated that the proposed source could synthesize CNTs even under relatively severe conditions for the magnetic null discharge formation.

The Development of the Automatic Discharge Acquisition & Management System (ADAMS) using Ubiquitous Technique

  • Park, Jae-Young;Oh, Byoung-Dong;Jeon, Seon-Mee;Kim, Jae-Bok
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.488-493
    • /
    • 2006
  • Accurate river discharge is the most important factor in managing river basins and for successfully maintaining total maximum daily loads in Korea. It is not easy to measure the discharge directly in large rivers owing to physical and environmental constraints, even after investing much time and money. Recently, to overcome these historical drawbacks in river discharge measurement, we have developed the Automatic Discharge Acquisition & Management System (ADAMS) that scans the river cross-section and measures each cell $(1m{\times}1m)$ velocity using HADCP. The hardware system is composed of an HADCP sensor and winch, as well as a PC and software system for the discharge calculation module and hardware control module. It is controlled remotely via the internet and uses the velocity-depth integration method and the velocity-contour method for calculating river discharges. The characteristics of ADAMS are a ubiquitously accessible system, featuring real time automatic discharge measurement, remote control via the internet. The results using ADAMS at the Jindong stage site show less than 5% uncertainty and are 4 times more efficient than the ADCP & Q-boat system. This system can be used to measure any large river, river mouth or tributary river affected by backwater, all of which have a very difficult measuring real time discharge. The next generation of ADAMS will feature an upgrade to increase portability and GPS integration.

  • PDF

Factors Influencing Discharge Destination and Length of Stay in Stroke Patients in Restorative Rehabilitation Institution

  • Gyu-Bum Lee;Jee-Sun Lee;Jeong Soo Kim
    • Physical Therapy Korea
    • /
    • v.31 no.1
    • /
    • pp.48-54
    • /
    • 2024
  • Background: Promoting patients' safe return home at discharge and reducing length of stay in hospital is key for Restorative Rehabilitation Institution (RMI). Objects: This study was designed to identify the factors influencing the return to home and length of stay among various factors. Methods: A total of 120 stroke patients (76 males and 44 females) who were hospitalized in an adult inpatient unit of a RMI for more than 2 months were retrospectively analyzed for this study (multivariate logistic regression analyses, p < 0.001). As predictor variables for assessing the return to home and length of stay, demographic data (sex, age, duration between onset and admission, length of stay, caregiver after discharge, occupation after discharge, reason for discharge, and household type after discharge) were collected. Additionally, following measurements were selectively collected from patient's medical records: scores of Mini-Mental State Examination Korean version (K-MMSE), modified Barthel Index Korean version (K-MBI), Berg Balance Scale and Functional Ambulation Category were obtained at admission and discharge. Results: The K-MMSE at admission and K-MBI at discharge were found to be the predictors of return to home. Additionally, K-MBI at admission influenced the length of stay. Conclusion: This study suggests cognitive functioning at admission and the level of activities of daily living at discharge predicted the return to home and length of stay.

A Study about Discharge Criteria to Determine Patients' Readiness for Safe Return to Home after Ambulatory Surgery (통원 수술환자의 안전한 귀가 결정을 위한 퇴실기준에 관한 연구)

  • Yoon, Ke Sook;Kim, Eun Gyeong;Jung, So Hyun;Lee, Seung Ju;Jung, Mi Kyoung;Lee, Young Mee
    • Journal of Korean Clinical Nursing Research
    • /
    • v.18 no.3
    • /
    • pp.435-446
    • /
    • 2012
  • Purpose: This study was conducted to compare three discharge criteria; 1) discharge criteria of S Hospital determined by nurses, 2) discharge readiness determined by patients, and 3) the Modified Post-Anesthetic Discharge Scoring System (MPADSS). The usefulness of MPADSS as a discharge criteria for the patients'safe return to home after ambulatory surgery was also evaluated. Methods: A total of 370 day surgery cases were investigated. The MPADSS was employed in every 30 min. in parallel with discharge readiness assessment by nurses and patients. The percentage of the patients who were categorized as being ready to discharge were compared according to three discharge criteria. Results: The percentage of patients scored to be as MPADSS > 9 in 30 min, 60 min, 90 min were 96.5%, 99.5%, 100%respectively. Whereas 11.1%, 44.3%, 71.1%of patients rated themselves as being ready to discharge and 2.7%, 23.5%, 54.3% of patients actually discharged by nurses according to discharge criteria of S Hospital. Conclusion: Nurses tend to keep patients longer in the hospital when compared to the patient's own assessment about their readiness to home and to that of MPADSS. Faster discharge in the evening than day time suggests patient discharge can be influenced by nursing factors. This brings out the importance of scoring system to determine the safe discharge. The MPADSS could be a useful tool in evaluating patients for safe discharge.

Flow regime analysis method by using discharge Gini coefficient (유량 지니계수를 이용한 유황분석방안)

  • Park, Tae Sun
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.12
    • /
    • pp.1223-1232
    • /
    • 2021
  • In this study, a new analysis method by using a "Discharge Gini Coefficient" is presented to determine the degree of inequality in daily discharge throughout the year. The Discharge Gini Coefficient can be calculated using the area relationship with the cumulative percentage of the daily mode discharge in the ascending order according to the cumulative percentage of the date of occurrence of the daily discharge throughout the year. The Discharge Gini Coefficient is presented as a value between 0 and 1, and the degree of inequality can be divided into 5 levels. The Discharge Gini Coefficient can be used to estimate the discharge stability of the downstream point relative to the upstream point. In addition, it is possible to quantify the influence of each reference discharge on the total inequality. The applicability of the Discharge Gini Coefficient was reviewed using long-term daily discharge data at eight points upstream and downstream of the four major rivers in Korea. The Discharge Gini Coefficient can also be used to analyze the discharge control effect in the downstream by the upstream dam.