건축 구조체를 이용한 개량 역타공법 적용시 흙막이 벽체의 거동 연구 (A Study on the Behavior of the Retaining Walls with the Improved Top-Down Support System using the Building Structure)

  • 천병식;노배영;도종남;유우현
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.1666-1672
    • /
    • 2008
  • In this study, it collected and analyzed a construction case of the improved top-down support system application field on a case by case retaining wall method. The behavior of horizontal displacement was analyzed according to retaining wall type after reviewing a design stage and estimated horizontal displacement under the construction. The study results showed that it is judged stable until excavation termination irrelevant to a retaining wall method at the improved top-down support system application. It is judged that the settlement of behind ground can minimize because the retaining wall head displacement also behave stably. It was compared the predicted horizontal displacement in design and the measured horizontal displacement acquired through a measurement by using Elasto-Plastic analysis program. The comparison results showed that a similar horizontal displacement was predicted within stability standard irrelevant to a retaining wall method. So, it is decided that the advanced prediction is reasonable by Elasto-Plastic analysis in design applied the improved top-down support system. In the case of the ground anchor method application under a same condition, it is decided that a horizontal displacement will more increase than the improved top-down support system is applied. If a section condition is same, it was decided that to apply top-down support system is more stable than that.

  • PDF

하향식 다단 압력 그라우팅 방법의 주입특성에 대한 연구 (A Study on the Grouting Characteristics of Top-down Multi-step Pressure Grouting Method)

  • 이홍성;이승호
    • 지질공학
    • /
    • 제29권3호
    • /
    • pp.201-209
    • /
    • 2019
  • 국내 사면 및 터널에서 주로 적용되고 있는 다단 압력을 이용한 그라우팅 방법들은 천공 후 지중에서 지표 방향으로 스텝주입을 하는 상향식 다단압력 그라우팅 방법이며 다수의 연구결과와 축척된 시공실적을 토대로 현재 여러 현장에서 적용되고 있다. 국내에서 하향식 다단압력 그라우팅 방법의 연구결과는 미미한 실정이다. 본 논문에서는 토조시험과 현장시험을 통해 기존 상향식 다단압력 그라우팅 방법과 지표부에서부터 주입을 실시하는 하향식 다단압력 그라우팅 방법의 주입효과를 비교 분석하였다. 토조 시험 결과 하향식 다단압력 그라우팅 방법의 경우 상향식 다단압력 그라우팅 방법에 비해 구근체의 부피는 약 24% 증가하는 것으로 나타났다. 현장시험 결과 하향식 다단 압력 그라우팅 방법이 상향식 다단 압력 그라우팅 방법에 비해 주입 범위가 넓고 면적당 주입 밀집도가 높은 것으로 확인되었다.

토압 영향을 받는 Down-Up 지하공사 공법의 오픈 구간 균열 저감 방안 연구 (A Study on Crack Reduction Method in open Section of Down-Up Underground Construction Method Affected by Earth Pressure)

  • 심학보;전현수;석원균
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.196-197
    • /
    • 2021
  • The underground method can be divided into Top-Down, Semi-Top-Down, Up-Up and Down-Up methods according to the construction order of the upper and lower structures. Among them, the Down-Up method proceeds with the construction of the first floor and its lower floors, and when the foundation is completed, the vertical members of the basement are sequentially completed from the foundation and the above-ground floor is constructed. In this paper, the crack reduction method around the open section of the Down-Up method affected by earth pressure was analyzed and divided into design and construction parts.

  • PDF

퍼지 ART에서 잡음 여유도를 개선하기 위한 새로운 학습방법의 연구 (A Study on the New Learning Method to Improve Noise Tolerance in Fuzzy ART)

  • 이창주;이상윤;이충웅
    • 전자공학회논문지B
    • /
    • 제32B권10호
    • /
    • pp.1358-1363
    • /
    • 1995
  • This paper presents a new learning method for a noise tolerant Fuzzy ART. In the conventional Fuzzy ART, the top-down and bottom-up weight vectors have the same value. They are updated by a fuzzy AND operation between the input vector and the current value of the top-down or bottom- up weight vectors. However, it can not prevent the abrupt change of the weight vector and can not achieve good performance for a noisy input vector. To solve the problems, we updated using the weighted sum of the input vector and the current value of the top-down vector. To achieve stability, the bottom-up weight vector is updated using the fuzzy AND operation between the newly learned top-down vector and the current value of the bottom-up vector. Computer simulations show that the proposed method prominently resolves the category proliferation problem without increasing the training epoch for stabilization in noisy environments.

  • PDF

현장실험을 통한 역타설 이음부의 강도 및 충전특성에 관한 연구 (A Study on Strength and Packing Characteristics of Top-Down Joint in Field Experiment)

  • 강동현;김종구;김병천;박병근;이영도;정상진
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2000년도 가을 학술발표회 논문집(II)
    • /
    • pp.1101-1106
    • /
    • 2000
  • When top down method is used, it could be a construction method trouble in column joint, between the former concrete and the latter. It could bring a void and weak concrete in column. The purpose of this study is to find a solution of removing void and air, way to exhaust air in top down column. through specimen concrete placing experiment.

Top-Down 공사용 원형충전강관기둥과 피어기초의 개발 (Development of Connection between CFT Column and Pier Foundation for Top-Down Construction)

  • 정미라;임홍철;김승원;김동건;강승룡
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.29-32
    • /
    • 2009
  • Building foundations for Top-Down construction require a special setting, because the foundations have to be placed way before excavation for the substructure of main building, Usually, the foundation goes into the layer of rock and it is often called rock-pier foundation, Currently, a cage of steel reinforcing bars is inserted to the pre-excavated hole in the rock layer, hanging down from the wide flange steel column above. This paper presents a new method for connecting the prefounded column and the steel cage with a coupler for better connection between the two, The use of a circular Concrete Filled Tube (CFT) as a prefounded column makes it possible to have this type of connection. The details of the connection and application to a Top-Down construction site is also included in this paper.

  • PDF

DEVELOPMENT AND APPLICATION OF SUBSTRUCTURE NON SUPPORTING FORMWORK FOR TOP-DOWN CONSTRUCTION

  • Mee-Ra Jeong;Hong-Chul Rhim;Doo-Hyun Kang;Kwang-Jun Yoo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.788-793
    • /
    • 2009
  • Constructing substructures by using Top-Down or Downward method needs an efficient formwork system because of difficulties in supporting concrete slabs from the bottom while excavation is in process. Existing underground formwork systems can be classified by three types: graded ground supported type (Slab On Grade, Beam On Grade), suspension type (Non Supporting Top Down Method), and bracket supported type (Bracket Supported R/C Downward). Each method has its own advantages and limits. Application of a specific formwork system for a given construction site is determined by various conditions and affect construction time and cost. This paper presents a newly developed underground non-supporting formwork system, which combines the advantages of a suspension type and a bracket supported type while it overcomes limits of two types. The developed system has a moving formwork which is supported by suspension cables hanging from the bracket placed at the top of pre-installed substructure columns. Then, the moving formwork is repeatedly lowered down for the next floor below to support concrete slab during curing. The details of this bracket and cable supported system have been investigated for the improvement of easiness in construction.

  • PDF

역타공법 중심의 골조 공기단축을 위한 시공시퀀스 변경에 따른 구조해석 및 요소기술 분석 (Structure and Construction Technology Analysis about Construction Sequence Change for Superstructure Construction Period Reduction in Top-down Method)

  • 박용현;주영규
    • 대한건축학회논문집:구조계
    • /
    • 제35권6호
    • /
    • pp.101-109
    • /
    • 2019
  • The purpose of this study is to improve a general Top-Down construction process for superstructure construction period reduction. In a general Top-Down construction sequence, the ground floor slab is set up first. Subsequently, 1st basement level construction including core walls is constructed. Initiation of the ground level superstructure gets waited until then. In this study, removable deck plate installation on the bottom of the core walls of ground level is preceding the concrete casting, therefore, ground level superstructure construction is able to get started earlier. Up to first typical floor concrete casting, total of seventy-two working(calendar) days will be resulted in a reduction from the total construction periods.