Methodology for Developing Standard Schedule Activities for Nuclear Power Plant Construction through Probabilistic Coherence Analysis

  • kim, Woojoong
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.8-13
    • /
    • 2017
  • Nuclear power plant (NPP) constructions are large scale projects that are executed for several years, and schedule control utilizing various schedules is a critically important factor. Recently Korea independently developed the Advanced Power Reactor (APR) 1400 and is building nuclear facilities applying this new reactor type. The construction of Shin-Kori NPP (SKN) Unit 3, which adopted the APR1400, was completed and commercial operation has begun, while, SKN 4, Shin-Hanul NPP (SHN) Units 1&2, and SKN 5&6 are currently under construction. Prior to the development of the APR1400, Korea built 24 reactors and accumulated the schedule data of various reactor types which provided the foundation for schedule reduction to be possible. However, as there is no schedule development and review system established based on the standard schedule data (standard activities, durations, etc.) by reactor type, the process for developing the schedule for new builds is low in efficiency consuming much time and manpower. Also all construction data has been accumulated based on schedule activities. But because the connectivity of activities between projects is low, it is difficult to utilize such accumulated data (causes for schedule delay, causes for design changes, etc.) in new build projects. Due to such reasons, issues continue to arise in the process of developing standard schedule activities and a standard schedule for nuclear power plant construction. In order to develop a standard schedule for NPP construction, i) the development of an NPP standard schedule activity list, ii) development of the connection logic of NPP standard schedule activities, iii) development of NPP standard schedule activity resources and duration, and iv) integration of schedule data need to be performed. In this paper, an analysis was made on the coherence of schedule activity descriptions of existing NPPs by applying the probabilistic methodology on activities with low connectivity due to the utilization of the numbering system of four APR1400 reactors (SHN 1&2 and SKN 3&4).This study also describes the method for developing a standard schedule activity list and connectivity measures by extracting same and/or similar schedule activities.

  • PDF

AN ANALYSIS ON FACTORS AFFECTING SCHEDULE PERFORMANCE OF PUBLIC HOUSING PROJECTS: CASE OF SINGAPORE

  • Bon-Gang Hwang;Xianbo Zhao;Si Yi Ng
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.412-418
    • /
    • 2013
  • With the increasing demand for public housing, the Singapore government decided to reduce the waiting time of future public housing owners, which requires these projects to be completed on time. As a result, this study aims to identify the frequent and impactful factors affecting schedule performance of public housing projects in Singapore. The survey conducted with 36 industry experts revealed that "site management", "coordination among various parties", "design changes by owner during construction", "availability of laborers on site", "availability of material", and "availability of staff to manage projects" were the six factors that should be emphasized to assure the schedule performance of public housing projects. In addition, there was statistically significant agreement between public housing projects and other building projects on both the frequency and impact ranks of the factors. The findings from this study will help practitioners involving public housing projects to take measures to assure the achievement of project schedule objectives.

  • PDF

Manufacturing process monitoring and Rescheduling using RFID and Computer vision system (전자태그와 컴퓨터 비전 시스템을 이용한 생산 공정 감시와 재일정계획)

  • Kong J.H.;Han M.C.;Park J.W.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.153-156
    • /
    • 2005
  • Real-time monitoring and controlling manufacturing process is important because of the unexpected events. When unexpected event like mechanical trouble occurs, prior plan becomes unacceptable and a new schedule must be generated though manufacturing schedule is already decided for order. Regenerating the whole schedule, however, spends much time and cost. Thus automated system which monitors and controls manufacturing process is required. In this paper, we present a system which uses radio-frequency identification and computer vision system. The system collect real-time information about manufacturing conditions and generates new schedule quickly with those information.

  • PDF

Project Schedule Risk Assessment Based on Bayesian Nets (베이지안넷 기반의 프로젝트 일정리스크 평가)

  • Sung, Hongsuk;Park, Chulsoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.1
    • /
    • pp.9-16
    • /
    • 2016
  • The project schedule risk in the engineering and facility construction industry is increasingly considered as important management factor because the risks in terms of schedule or deadline may significantly affect the project cost. Especially, the project-based operating companies attempt to find the best estimate of the project completion time for use at their proposals, and therefore, usually have much interest in accurate estimation of the duration of the projects. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, and then performing risk assessment with simulation such as Monte-Carlo simulation method. However, since these approaches require the accumulated executional data, which are not usually available in project-based operating company, and, further, they cannot reflect various schedule constraints, which usually are met during the project execution, the project managers have difficulty in preparing for the project risks in advance of their occurrence in the project execution. As these constraints may affect time and cost which role as the crucial evaluation factors to the quality of the project result, they must be identified and described in advance of their occurrence in the project management. This paper proposes a Bayesian Net based methodology for estimating project schedule risk by identifying and enforcing the project risks and its response plan which may occur in storage tank engineering and construction project environment. First, we translated the schedule network with the project risks and its response plan into Bayesian Net. Second, we analyzed the integrated Bayesian Net and suggested an estimate of project schedule risk with simulation approach. Finally, we applied our approach to a storage tank construction project to validate its feasibility.

Development of an Effective Time Scheduling Mechanism of the Structural Framework for the High-rise Apartment Housing -Focusing on One Cycle Time Scheduling Mechanism of Typical Floor- (아파트 골조공사의 공기단축 및 효과적 공정운영 방안 -기준층 사이클 공정분석을 중심으로-)

  • Han Choong-Hee;Bang Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.87-96
    • /
    • 2004
  • The construction duration in apartment construction is an important factor which affects project cost. Henceforth, the time shortening is essential to retrench project cost and project risk when there adopt Five-Day Workweek and introduce apartment sales after completion of construction. Therefore, the purpose of this study is to examine closely the affecting factors on the duration of framework which forms about $40\sim50\$ percent of total time in apartment construction by analyzing the schedule mechanism of typical floor and to show the reasonable time shortening methods by case study. The shown schedule mechanism and basic schedule table can utilize as a guideline in case of scheduling of framework in the existing construction method. Also, the shown time shortening methods by three case studies will guide the direction and process of time shortening while there need time shortening in many-sided projects.

An Estimating for Practical Software Development Duration (실현 가능한 소프트웨어 개발기간 추정)

  • Lee, Sang-Un;Choi, Myeong-Bok
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.12 no.6
    • /
    • pp.155-164
    • /
    • 2012
  • The compression of software development schedule has a limit without regarding to a development manpower. However, the actually developed softwares includes the impossible short time or unreal long time date. Previously suggested models are driving the development schedule from all of the actually developed software without considering these constraints. This paper recommends a standard of minimum and the most suitable development time period. This paper has chosen a criterion that shows the best development schedule among 5 criteria based on the actually performed projects. Moreover, this paper suggests a model that estimates the development schedule based on the best criterion.

A Batch Arrival Queue with a Random Setup Time Under Bernoulli Vacation Schedule

  • Choudhury, Gautam;Tadj, Lotfi;Paul, Maduchanda
    • Management Science and Financial Engineering
    • /
    • v.15 no.2
    • /
    • pp.1-21
    • /
    • 2009
  • We consider an $M^x/G/1$ queueing system with a random setup time under Bernoulli vacation schedule, where the service of the first unit at the completion of each busy period or a vacation period is preceded by a random setup time, on completion of which service starts. However, after each service completion, the server may take a vacation with probability p or remain in the system to provide next service, if any, with probability (1-p). This generalizes both the $M^x/G/1$ queueing system with a random setup time as well as the Bernoulli vacation model. We carryout an extensive analysis for the queue size distributions at various epochs. Further, attempts have been made to unify the results of related batch arrival vacation models.

Application of Work Relationships for Linear Scheduling Model (선형 공정계획 모델의 작업 관계성 적용 방법)

  • Rye, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.131-133
    • /
    • 2010
  • As linear scheduling method has been used since 1929, Empire State Building linear schedule, it is being applied in various fields such as construction and manufacturing. When addressing concurrent critical path occurring on linear schedule of construction, the empirical researches stress the resource management which should be applied for optimizing work flow, flexible work productivity and continuos resource allocation. However, work relationships has been usually overlooked for making the linear schedule from existing network schedule. Therefore, this research analyze the previous researches related to linear scheduling model and then propose the method that can be applied for adopting the relationships of network schedule to the linear schedule.

  • PDF

A study on Development of method for Train Schedule Simulation (철도 차량운행계획 시뮬레이션 방법론 개발에 대한 연구)

  • Shin, Dae-Sup;Park, Eun-Kyung;Lee, Jin-Sun;Lee, Seon-Ha
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.1
    • /
    • pp.88-95
    • /
    • 2012
  • Presently, because making process of train service plan consist of various constraint condition, for example structure of track, structure of track in station, train maintenance time and others for considering to be necessary of train management, it has been had extremely complex structure problems. For these reasons, it has big problems to compare analysis for various train service time-table. A study suggest methodology to choice service the most effective schedule and plan of train put before comparative analysis on making train diamond picture's expected effect of established possible various train time-table in making process of train service schedule for improving effectiveness and organization of train service schedule establishment. A study uses Line-Blocking theory for analyzing train service time-table and analyze example for regional train Sadang to Ansan section in 4line.

A Study on Development of Algorithm and Load Balancing for detail scheduling (소일정 계획 수립을 위한 부하조정과 알고리즘 개발에 관한 연구)

  • 김정자;김상천;공명달
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.46
    • /
    • pp.241-251
    • /
    • 1998
  • There are two methods of load balancing for detail scheduling : One method is to generate an initial schedule and obtain an improved final schedule by load balancing only during a specific period. The other method is to generate an initial schedule and obtain an improved schedule by load balancing from current date(TIMENOW) to unlimited time with the whole manufacturing processes. This paper proposes an algorithm for detail scheduling which can be a practical solution in job shop production or project job type by applying the former method.

  • PDF