A study on Development of method for Train Schedule Simulation |
Shin, Dae-Sup
(비츠로시스 전략기획팀)
Park, Eun-Kyung (공주대학교 공과대학 건설환경공학과) Lee, Jin-Sun (우송대학교 철도경영학과) Lee, Seon-Ha (공주대학교 공과대학 건설환경공학과) |
1 | K.-S. Seo (2004) A Study on Change of the Existing Railroad Operating and User Effect of High Speed Railroad System in Japan, 2005 Autumn Conference & Annual Meeting of Korean Society for Railway, pp. 34-41. |
2 | B.-H. Yang, Y.-H. Lee (1994) A Vehicle Feet Planning System with Multi-Objective Optimization, The Korean Academic Society of Business Administration. |
3 | J.-M. Won, J.-H. Hwang (1997) An Analysis on Time Saving Effects of Urban Express Rail System, Korea Planners Association, 32(6), pp. 121-131. |
4 | S.-I. Han, D.-K. Lee (2010) Study of Improving the Operation Diagram of Seoul Metro Line 9 by Diversifying Train Patterns, Journal of the Korean Society for Railway, 13(1), pp. 125-130. |
5 | Tsang, Edward (1993) Foundations of Constraint Satisfaction, Academic Press, London. |
6 | Y.-T. Park, S.-W. Kang (2003) The State of the art and Future Research Subjects of Vehicle Fleet Scheduling System in Korea and Foreign Country, Korea Distribution Association. |
7 | S.P. Hong, K.M. Kim, K.S. Lee, B.H. Park, S.H. Hong (2006) A pragmatic algorithm for the Minimum Railway Stock Maintenance Routing Problem, 2006 Autumn Conference & Annual Meeting of Korea Institute of Industrial Engineers/The Korean Academic Society of Business Administration. |
8 | Y.-J. Kwon, D.-S. Moon (2000) A Study of developing fare structure on the high speed rail, 2000 Autumn Conference & Annual Meeting of Korean Society for Railway. |