• Title/Summary/Keyword: time delayed generator

Search Result 15, Processing Time 0.037 seconds

Lp-SOLUTIONS FOR REFLECTED BSDES WITH TIME DELAYED GENERATORS

  • Zhou, Qing
    • Bulletin of the Korean Mathematical Society
    • /
    • v.53 no.3
    • /
    • pp.793-819
    • /
    • 2016
  • In this paper, we establish the existence and uniqueness of the solution for a class of reflected backward stochastic differential equations with time delayed generator (RBSDEs with time delayed generator, in short) in the case when the terminal value and the obstacle process are $L^p$-integrable with p ${\in}$]1, 2[ for a sufficiently small Lipschitz constant of the generator and the time horizon T.

A Study on Out-of-Step Relay Operation due to Delayed Fault Clearing in Transmission Line (송전선로 고장제거 지연에 따른 동기 탈조 계전기 동작 검토)

  • Park, Ji-Kyung;Kim, Kwang-Hyun;Kim, Chul-Hwan;Lyu, Young-Sik;Yang, Jeong-Jae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.10
    • /
    • pp.1466-1473
    • /
    • 2017
  • Generally, electrical torque in synchronous generator is balanced with the rotor mechanical torque under steady-state condition. Thus, the synchronous generator rotor rotates at constant speed. However, under fault condition, the electrical torque output is suddenly decreased and the sum of both torques does not remain constant. If the mechanical torque is not decreased at the same time, the generator rotor would accelerate. Therefore, this accelerating generator rotates at different speeds with respect to other generators in the power system. This phenomena is called as Out-of-Step (OOS). In this paper, we presented a certain two-step type quadrilateral OOS relay setting, which is applicable in actual field, and examined the validity of its setting value with OOS simulation conditions due to delayed fault clearing in transmission line. In order to conduct the study of OOS relay characteristics, we checked the impedance locus and generator output characteristics under the various delayed fault clearing conditions. Moreover, we proposed a countermeasure for avoiding the misoperation of OOS relay during the stable swing by modifying the setting values.

A Design of Analog Front-End for Noncoherent UWB Communication System

  • Yong Moon Kwan-Ho;Choi Sungsoo;Oh Hui Myong;Kim Kwan-Ho;Lee Won Cheol;Shin Yoan
    • Proceedings of the IEEK Conference
    • /
    • summer
    • /
    • pp.77-81
    • /
    • 2004
  • In this paper, we propose a analog front-end (AFE) for noncoherent On-Off Keying (OOK) Ultra Wide Band (UWB) system based on power detection. The proposed AFE are designed using 0.18 micron CMOS technology and verified by simulation using SPICE. The proposed AFE consist of Sample-and-Hold block, Analog-to-Digital converter, synchronizer, delayed clock generator and impulse generator. The time resolution of 1ns is obtained with 100MHz system clocks and the synchronized 10-bit digital outputs are delivered to the baseband. The impulse generator produces 1ns width pulse using digital CMOS gates. The simulation results show the feasibility of the proposed UWB AFE systems.

  • PDF

Development of a Nuclear Steam Generator Tube Inspection/maintenance Robot

  • Shin, Ho-Cheol;Kim, Seung-Ho;Seo, Yong-Chil;Jung, Kyung-Min;Jung, Seung-Ho;Choi, Chang-Hwan
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.2508-2513
    • /
    • 2003
  • This paper presents a nuclear steam generator tube inspection/maintenance robot system. The robot assists in automatic non-destructive testing and the repair of nuclear steam generator tubes welded into a thick tube sheet that caps a hemispherical or quarter-sphere plenum which is a high-radiation area. For easy carriage and installation, the robot system consists of three separable parts: a manipulator, a water-chamber entering and leaving device for the manipulator and a manipulator base pose adjusting device. A software program to control and manage the robotic system has been developed on the NT based OS to increase the usability. The software program provides a robot installation function, a robot calibration function, a managing and arranging function for the eddy-current test, a real time 3-D graphic simulation function which offers remote reality to operators and so on. The image information acquired from the camera attached to the end-effecter is used to calibrate the end-effecter pose error and the time-delayed control algorithm is applied to calculate the optimal PID gain of the position controller. The developed robotic system has been tested in the Ulchin NPP type steam generator mockup in a laboratory.

  • PDF

Time Delay Limit of Over Current Relay for Maintaining Stability in Industrial Power Systems (산업용 전력계통의 안정도 유지를 위한 과전류계전기의 시간지연 한계)

  • Kim, Bong-Hee
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.190-192
    • /
    • 2002
  • The industrial power distribution system is a radial system and therefore usually protected with time delayed over current relays (OCR's). Proper time dial settings are provided at the OCR's. Meanwhile, the systems, where synchronous generator, or synchronous motors, or large induction motors are operating, can not be protected with only OCR's with time grading. This paper presents a technical limit and a suitable range of time delay in applying OCR's to clearing faults in the industrial power systems for maintaining stability. Dynamic simulations are made to show them employing a real power systems of a large petro-chemical complex.

  • PDF

A Design and Fabrication of Test Equipment for Airborne Tracking Radar Test (항공기용 추적레이더 시험을 위한 시험장비의 설계 및 제작)

  • Yoon, Seung-Gu;Park, Seung-wook;Kwon, Jun-Bum;Jung, Man-Seek
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.20 no.3
    • /
    • pp.352-361
    • /
    • 2017
  • This paper proposes a design and fabrication of the test equipment that is implemented as a part of the airborne tracking radar inspection under the environment of indoor simulation. This test equipment provides controlling the operation status of airborne tracking radar and replicating the velocity and range information of target by generating a variety of target signal. This is mainly composed of radar operation controller, target signal generator, horn antenna driving devices. Radar operation controller is able to perform the controlling of radar operation mode and monitoring in real time by serial communication. Target signal generator is generated doppler signal and range delayed signal using virtual target of RF-band. Horn antenna driving devices perform a role of target simulating exercise. In the end, the performance is demonstrated using experiment results of test equipment for airborne tracking radar.

Automatic Fortified Password Generator System Using Special Characters

  • Jeong, Junho;Kim, Jung-Sook
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • v.15 no.4
    • /
    • pp.295-299
    • /
    • 2015
  • The developed security scheme for user authentication, which uses both a password and the various devices, is always open by malicious user. In order to solve that problem, a keystroke dynamics is introduced. A person's keystroke has a unique pattern. That allows the use of keystroke dynamics to authenticate users. However, it has a problem to authenticate users because it has an accuracy problem. And many people use passwords, for which most of them use a simple word such as "password" or numbers such as "1234." Despite people already perceive that a simple password is not secure enough, they still use simple password because it is easy to use and to remember. And they have to use a secure password that includes special characters such as "#!($^*$)^". In this paper, we propose the automatic fortified password generator system which uses special characters and keystroke feature. At first, the keystroke feature is measured while user key in the password. After that, the feature of user's keystroke is classified. We measure the longest or the shortest interval time as user's keystroke feature. As that result, it is possible to change a simple password to a secure one simply by adding a special character to it according to the classified feature. This system is effective even when the cyber attacker knows the password.

DETECTION OF ODSCC IN SG TUBES DEPENDING ON THE SIZE OF THE CRACK AND ON THE PRESENCE OF SLUDGE DEPOSITS

  • Chung, Hansub;Kim, Hong-Deok;Kang, Yong-Seok;Lee, Jae-Gon;Nam, Minwoo
    • Nuclear Engineering and Technology
    • /
    • v.46 no.6
    • /
    • pp.869-874
    • /
    • 2014
  • It was discovered in a Korean PWR that an extensive number of very short and shallow cracks in the SG tubes were undetectable by eddy current in-service-inspection because of the masking effect of sludge deposits. Axial stress corrosion cracks at the outside diameter of the steam generator tubes near the line contacts with the tube support plates are the major concern among the six identical Korean nuclear power plants having CE-type steam generators with Alloy 600 high temperature mill annealed tubes, HU3&4 and HB3~6. The tubes in HB3&4 have a less susceptible microstructure so that the onset of ODSCC was substantially delayed compared to HU3&4 whose tubes are most susceptible to ODSCC among the six units. The numbers of cracks detected by the eddy current inspection jumped drastically after the steam generators of HB4 were chemically cleaned. The purpose of the chemical cleaning was to mitigate stress corrosion cracking by removing the heavy sludge deposit, since a corrosive environment is formed in the occluded region under the sludge deposit. SGCC also enhances the detection capability of the eddy current inspection at the same time. Measurement of the size of each crack using the motorized rotating pancake coil probe indicated that the cracks in HB4 were shorter and substantially shallower than the cracks in HU3&4. It is believed that the cracks were shorter and shallower because the microstructure of the tubes in HB4 is less susceptible to ODSCC. It was readily understood from the size distribution of the cracks and the quantitative information available on the probability of detection that most cracks in HB4 had been undetected until the steam generators were chemically cleaned.

Analysis of Research for the Actual State and Management of Automated Horticultural Facilities (경북지역 현대화 원예시설의 관리실태 조사분석)

  • 정현교;이기명;박규식
    • Journal of Bio-Environment Control
    • /
    • v.5 no.2
    • /
    • pp.174-186
    • /
    • 1996
  • This study was carried out in order to understand the plan, design, constructing and actual condition of management of modernized horticultural facilities in Kyungpook Province which had been constructed from 1992 to 1995 funded by Government support. The aim of this study is to provide reference data for success of the forth project. It was performed by making up a question about driving of project and management condition of equipment after constructing. The results obtained from this study are as follows: 1. 73.5% of facilities horticulture farmhouse recognized that the prospect of greenhouse is bright, but 92.5% of the farmhouse also recognised that they need technical consultation on protected horticulture farming. Therefore, technical educations would must be enhanced about foundation of greenhouse and cultivation technique. 2. The holding times of explanatory meetings, cause of understanding to farmhouse, were one or two times in greenhouse construction, and 62.5% of the farmhouse expressed the insufficiency at the explanation and educational data. For this reason, it was judged that the construction contract had been delayed more than 5 months in 49.3% of the farmhouse after the decision of project budget. 3. In constructing after a contract, the rates of construction delay is 53.4% and defect occurrence is 41.1%. The biggest reasons of construction delay was insufficiency of worker and materials supply. Each percentage is 29.1%. And the reason of defect occurrence is badness of machinery equipment(62.9% ). 4. In management of greenhouse, a pipe-constructed plastic film greenhouse changes plastic film every one and three years because of sticking dust on plastic film. It was needed to about in cleaning technique of coverings. Because that used 3-5 years only half of the expected life span. 5. The order of broken rating in the subsidiary equipment is like this lollop ventilator (42.8%), a general control system(33.3%) especially, in the case of a general control system, the rate of all family can control is 52.7%. so, it is time to develop easy control equipment which every one could use as soon as possible. 6. When choose heat generator as decide capacity, the most priority is the mount of heat generator the percent is 45.5% heat generator and as decide model, the private purchase's percent is 77.3%. It is higher than a public bidding heat generator the percent is 22.7% heat generator when it compare with a public bidding. In the case of $CO_2$ generator, using rate is only 19.0%. The using rate is very low, so it needs education how to use depends on the way of the subsidiary equipment. 7. In the case of seedlings, it is asked to use factory-processed seedling effectively. because it's difficult to get security of labors(58.8%), hoped crops (55.9%) access same crops(29.4%) much more and changing of crops depends on market situation. that is the main reason the lack of knowhow.

  • PDF

Integrated Navigation System Design of Electro-Optical Tracking System with Time-delay and Scale Factor Error Compensation

  • Son, Jae Hoon;Choi, Woojin;Oh, Sang Heon;Hwang, Dong-Hwan
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.11 no.2
    • /
    • pp.71-81
    • /
    • 2022
  • In order for electro-optical tracking system (EOTS) to have accurate target coordinate, accurate navigation results are required. If an integrated navigation system is configured using an inertial measurement unit (IMU) of EOTS and the vehicle's navigation results, navigation results with high rate can be obtained. Due to the time-delay of the navigation results of the vehicle in the EOTS and scale factor errors of the EOTS IMU in high-speed and high dynamic operation of the vehicle, it is much more difficult to have accurate navigation results. In this paper, an integrated navigation system of EOTS which compensates time-delay and scale factor error is proposed. The proposed integrated navigation system consists of vehicle's navigation system which provides time-delayed navigation results, an EOTS IMU, an inertial navigation system (INS), an augmented Kalman filter and integration Kalman filter. The augmented Kalman filter outputs navigation results, in which the time-delay of the vehicle's navigation results is compensated. The integration Kalman filter estimates position, velocity, attitude error of the EOTS INS and accelerometer bias, accelerometer scale factor error, gyro bias and gyro scale factor error from the difference between the output of the augmented Kalman filter and the navigation result of the EOTS INS. In order to check performance of the proposed integrated navigation system, simulations for output data of a measurement generator and land vehicle experiments were performed. The performance evaluation results show that the proposed integrated navigation system provides more accurate navigation results.