• Title/Summary/Keyword: temporary rail

Search Result 8, Processing Time 0.027 seconds

Nonlinear Dynamic Behavior of Temporary Rail Considering the Effect of Vibration (진동영향을 고려한 가시설 레일의 동적 거동 특성)

  • Lim, Hyung Joon;Ryu, Dong Hyeon;Won, Jong Hwa;Kim, Moon Kyum
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.2A
    • /
    • pp.171-178
    • /
    • 2008
  • The object of this study is to propose a rate of vibration increase in the analysis of temporary rail non-fixed in the vertical direction and characterize the nonlinear dynamic behavior of temporary rail while considering longitudinal and latitudinal load, vibration and lifting. The rate of vibration increase is proposed through measurement of an actual structure that is largely affected by loading and vibration of the superstructure. Dynamic behavior was additionally characterized by the dynamic response resulting from nonlinear dynamic finite element analysis with vehicle loading, including the rate of vibration increase. As a result, the rate of vibration increase by the vibration of an Auto Bar Machine is determined as 7% and the maximum stress in the analysis of the nonlinear rail is increased 14.5% over that of linear rail, and temporary rail is shown to be very sensitive to the velocity of the superstructure.

Railway Underground Crossing Method Using PC Slab (직접 PC슬래브설치를 통한 철도지하횡단 공법의 적용 연구)

  • Min, Kyung-Ju;Lee, Bang-Woo;Park, Byung-Yong
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2439-2449
    • /
    • 2011
  • Existing grade crossings between railway and roadway area gradually changed to grade separation systems by the law. In the case of new roadway construction which crosses railways, it shall be grade separation system in principle. With the railway underground crossing method, many practices have been developed which can minimize rail displacements and avoid rail release. With these methods, the effects to the train can be reduced. The underground crossing methods can be identified as open-cut methods and non open-cut methods. The open-cut methods include temporary support methods and special rail construction methods. Also the non open-cut methods includes pipe roof methods, front jacking methods, messer shield methods, NTR methods and JES methods. Among these, the most suitable method is applied considering safety, economy, class of each rail system (train passing frequency and velocity), etc. In the non open-cut methods, the cost and duration shall be increased to keep existing rail system during construction. In the open-cut methods which use plate girders, the rail speed shall be restricted due to the displacement and vibration of the girder. In this study new grade separation methods were developed. With this method, the safety during construction can be increased. This method refines temporary support methods, but pc slab girder with huge stiffness is applied instead of plate girders. With this method, the rail displacement can be reduced and higher safety can be obtained during construction. Also construction cost and duration can be minimized because the temporary work and the overburden soil depth can be reduced.

  • PDF

Steel Plate Girder Railway Bridge Ballast System using Rail Transfer Method(III) (선로이송 가설공법을 적용한 철도판형교 유도상화(III))

  • Min, Ji-Hong;Jang, Jun-Hyun;Kim, Jin-Yong;Woo, Yong-Keun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1569-1576
    • /
    • 2011
  • To install heavy structures in the railway bridges, crane methods or launching methods using temporary structure have been applied. These methods are uneconomical because working yard is required, temporary cut of rail system, etc. In this study, various construction methods has been developed which are suitable to the filed conditions. In the case of simple span structure like plate girder bridges, the girder is loaded to troy system at the working yard and then transferred to the working place. To lift and lower the girder system, a new transfer system was developed. Different methods each for simple span bridge girder and long span girder were developed and detailed work procedures were proposed. Using these methods, the heavy structures can be installed with simple and safe work procedures and the construction cost and duration can be reduced.

  • PDF

Evaluation of Train Running Safety During Construction of Temporary Bridge on Existing Railway (기존선에서 가설교량 시공에 따른 열차의 주행안전성 평가)

  • Eum, Ki-Young;Bae, Jae-Hyoung;Choi, Chan-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.3
    • /
    • pp.234-239
    • /
    • 2011
  • Installing the temporary bridge after excavating the railway requires installing movable cross beam, but as it doesn't requires isolating the catenary or cutting the rail, it's applicable to double-track with frequent operation. In this study, a displacement meter was placed on temporary bridge to monitor the displacement pattern in curve section (R400) completed using temporary bridge method, and wheel load, lateral pressure and derailment coefficient were measured to evaluate the load imposed on track and the stability in curve section (R400) for quantitative evaluation of training running safety. As a result of the measurement, when trains passing over a temporary bridge, the maximum value of Wheel load and Lateral Force is analyzed as the 51% and 81% of standard level according to foreign country's performance tests, There is no trouble with stability analysis in Wheel load and Lateral Force occurring. Additionally, Wheel load and Lateral Force considered as the safety standard are tested 49% of limiting value regardless of trains, which the norm value quite well, there is no problem with train running.

An Optimization Model for Minimizing the Number of Rehandles at Container Yard (컨테이너 재처리 최소화를 위한 최적화 모형)

  • Kim, Kwang-Tae;Kim, Kyung-Min;Lee, Tae-Yun;Kim, Dong-Hee
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1246-1250
    • /
    • 2011
  • This paper considers the container storage problem determining storage position of inbound containers in a container yard at a rail freight terminal. The objective of the problem is to minimize the total number of rehandles when storing/retrieving containers onto/from stacks in the yard. Rehandle implies the temporary removal from and placement back onto the stack to retrieval a target container. In order to solve the problem, we formulate the problem as a binary integer program.

  • PDF

Analyses of Existing Tunnel Liner Behaviors Caused by Excavation of Upper Layer with Using Laser Scanning Technology (레이저 스캐닝 기술을 이용한 기존 터널 상부굴착에 따른 라이닝 거동 분석)

  • Park, Tae-Soo;Lee, Seung-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.10
    • /
    • pp.29-36
    • /
    • 2015
  • This paper deals with inspecting and monitoring cracks developed on a subway tunnel liner during the construction of temporary supports and excavation. The cracks have developed near a enlarged part of the tunnel. Several measurements, crack gauge, internal displacement measurement, 3-D laser scanner have been conducted to monitor the progress of cracks and effects of them on the tunnel. Local measurement, additional propagation of cracks and deformation of liner, have been conducted by crack gauge and internal displacement measurement. Global inspection has been conducted by 3-D laser scanner. From the scanned data, occurrence of global deformation of tunnel and rail has been evaluated. Because of limited sequence of construction at the ground, no apparent deformation of crack propagation has been measured. As presented in this paper, deformation of tunnel liner and effects of rail need to be investigated in view of local and global aspects.

The Study on DBPL Encoder Design for Railway Balise Application (철도 발리스 응용을 위한 DBPL 인코더 설계 연구)

  • Lee, Jeong-jun;Yang, Doh-chul;Kim, Seong-jin;Kim, Bong-seob;Kim, Yu-hyeon
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.2
    • /
    • pp.161-170
    • /
    • 2017
  • The balise is a device for the railroad signal control systems, which is installed between both rail. The balise sends fixed or variable data, named telegram, to the train with wireless method. The telegram includes the position information, the movable distance under the signal status, the gradient, the speed, the temporary speed limit, etc. This research is on a design of the DBPL encoder for the balise. Normally the DBPL encoder for the balise is with the ASIC or FPGA technology. In this research, the DBPL encoder is designed with commercial low power operable micro-controller. The firmware(logic level encode) and the SPI Bus function block(physical level output) of the micro-controller are used for the DBPL encode. Under the european standard, the required working speed of the DBPL encoder is 564.48Kbps. The DBPL encoder of this research is tested under the speed of 564.48Kbps, and it worked properly.

The Component Characteristics and the Distribution Channels for Forest Products Consumed as a Fuel in Kyeongseong City (Seoul) in 1929 (1929년 경성부(京城府)에서 소비(消費)된 임산연료(林産燃料)의 구성별(構成別) 특성(特性)과 유통(流通) 경로(經路))

  • Lee, Ki-Bong;Bae, Jae-Soo
    • Journal of Korean Society of Forest Science
    • /
    • v.94 no.3 s.160
    • /
    • pp.135-145
    • /
    • 2005
  • The purpose of this study is to reveal the component characteristics and the channels of distribution for forest products as a fuel that were consumed in Kyeongseong city (Seoul) in 1929, in the middle of the colonial period. The summary of the results are as follows; (1) though the average consumption of forest products consumed as a fuel per household in Kyeongseong city was slightly less than one-third as much forest products as fuel consumed in other counties of Kyeongki province, but due to the high heat capacity, the amount of fuelwood and charcoal consumption was much higher than leaf and grass consumption; (2) the largest supply areas of forest products for fuel were the riverside of Kangwon province and Kyeonggi province in which the waterways were available. They supplied 42.6% of total consumption, and the other supply areas were the northern part of Kyeonggi province, etc. (29.5%) where railroads were handy, and the suburbs of Kyeongseong City (27.9%) by roads; (3) the transportation areas using the Han River were divided into two parts of Ttook island (43.0%) and former Yongsan and Mapo (45.6%), but the volume of transportation by railroad was centralized in Kyeongseong Station, which accounted for 72.2% of total volume of transportation by rail; (4) the most of the forest products consumed for fuel in Kyeongseoung city were sold in temporary fuelwood markets, rather than permanent and regular markets.