Browse > Article
http://dx.doi.org/10.7782/JKSR.2011.14.3.234

Evaluation of Train Running Safety During Construction of Temporary Bridge on Existing Railway  

Eum, Ki-Young (한국철도기술연구원 고속철도 인프라시스템 연구단)
Bae, Jae-Hyoung (한국철도기술연구원 고속철도 인프라시스템 연구단)
Choi, Chan-Yong (한국철도기술연구원 고속철도 인프라시스템 연구단)
Publication Information
Journal of the Korean Society for Railway / v.14, no.3, 2011 , pp. 234-239 More about this Journal
Abstract
Installing the temporary bridge after excavating the railway requires installing movable cross beam, but as it doesn't requires isolating the catenary or cutting the rail, it's applicable to double-track with frequent operation. In this study, a displacement meter was placed on temporary bridge to monitor the displacement pattern in curve section (R400) completed using temporary bridge method, and wheel load, lateral pressure and derailment coefficient were measured to evaluate the load imposed on track and the stability in curve section (R400) for quantitative evaluation of training running safety. As a result of the measurement, when trains passing over a temporary bridge, the maximum value of Wheel load and Lateral Force is analyzed as the 51% and 81% of standard level according to foreign country's performance tests, There is no trouble with stability analysis in Wheel load and Lateral Force occurring. Additionally, Wheel load and Lateral Force considered as the safety standard are tested 49% of limiting value regardless of trains, which the norm value quite well, there is no problem with train running.
Keywords
Temporary bridge; Wheel load; Lateral force; Derailment coefficient; Wheel unloading ratio;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 J.Y. Yoo (2009) The Vibration serviceability Estimation of Railway Bridges subjected to Moving Train, A graduate degree thesis, Woosong University.
2 The National Railroad Administration (1998) The design standard of the railroad bridge, Korea Institute of Construction Technology.
3 Korea Railroad Research Institute (2004) Analysis on the Dynamic Behaviors of Railway Plate Girder Bridges according to speed of Train, Inha University.
4 H.M. Kim, J.T. Park, E.S. Cho, W.S. Hwang (2004) An Experimental Study on Vibration Characteristics for the Plate Girder Railway Bridge having a Rail Joint, Korean Society of Civil Engineers, Pyeongchang-gun, Gangwon-do, pp. 6-11.
5 Ministry of Land, Infrastructure, Transport and Tourism: MLIT(Japan) (2002) A technical standard about the railroad, Appendix-2: Evaluation technique of train operation stability, pp. 724-731.
6 K.Y. Eum, S.S. Kim, Y.H. Kim, M.S. Lee, et al. (2009) Comparisonand analysis of the running safety followed by derailment coefficient and wheel off-loading at the curves, Journal of the Korean Society for Railway, Jeju Special Self-Governing Province, pp. 347-358.
7 K.Y. Eum (2010) Push in cross beam Moving with Temporary bridge method, Korea Railroad Research Institute.
8 Y.G. Park, J.Y. Choi, D.Y. Sung, D.S. Chun (2007) Characteristics of Curved Track Behaviors according to Traveling Tilting Train, Journal of the Korean Society for Railway, 10(6), pp. 692-700.
9 S.S. Kim (2010) Evaluation of the running safety of tilting train when accelerating at curved track roadbed (R600), A graduate degree thesis, Sungkyunkwan University.